Municipal Administration Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipal Administration Department Tender

Works
Civil And Construction
Opening Date7 Jan 2025
Closing Soon15 Jan 2025
Tender Amount₹ 23,59,467 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
construction of Steps;Supply and transportation of LED 120 W Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover, Suitable lens on LEDs, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66 )protected, wide operating voltage range, P.F>0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Driver surge protection >10KV,THD<15%, CCT: 3000-6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE PHILIPS/ OSRAM/GE Venture / CROMPTON/BAJAJ / Surya / Menu GROMPTON / BAJAJ / Surya Wipro / Jaquar / Eveready/Halonix / LED Makes: Philips Lum LEDS/CREE/ NICHIA/OSRAM/ SAMSUNG/LG LEDS.

10

9720

97200

... More
construction of Steps;Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal Conical pole duly erecting on base plate duly provided 4 Nos foundation bolts with nuts with providing of 0.45Mtrx0.45Mtrsx1.20 Mtr size M20 cc

10

6600

66000

... More
construction of Steps;Fabrication, Transportation and supply of..complete with all accessories with MS galvanized 50mm dia Pipe. Makes: BAJAJ / VALMONT/TRANSRAIL / SKIPPER/UTKARSH/LAASMA/CONSOUL Lysaght pole 1.0 Mtr sword type or any decorative Single arm bracket with dooms

10

4025

40250

... More
construction of Steps;Elec-8.3.1 a Fabrication, Transportation and supply of hot-dip galvanized Octogonal Pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including chain for anti theft mechanism, supply of suitable boards with bakelite sheet, din channel for MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for ......Makes: BAJAJ / VALMONT/TRANSRAIL/....7.50 Mtrs height Pole having dimensions Bottom 130mm, Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700mm long 'J' bolts along with template or equivalent

10

13230

132300

... More
construction of Steps;BLD-CSTN-3-11-(28) Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix M20 (Cement: fine aggregate: coarse aggregate) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site, seigniorage charges on all materials, labour charges, for mixing, laying, concrete, ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement

4.46

6810

30362.46

... More
construction of Steps;BLD-CSTN-12-1(168) & Sl. No.17, Pg. 398/403, SSR 2011-12(Data Amendment)): Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished itern of work as per SS 911 for External walls

188.31

289

54438.54

... More
construction of Steps;Providing and applying Exterior grade Texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying pulty/ texture paint filler by putty knife / muslin pad, air dry for 2-3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for extemal walls - excluding cost of access scaffolding

99

333

32996.7

... More
construction of Steps;BLD-CSTN-8-10-(85): Plastering 12mm thick two coats with base coat of 8mm thick in C.M. (1:5) and top coat of 4mm thick in C.M. (1:4) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand, Water, etc., to site, all operational, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves where ever necessary etc., complete for finished item of work.

71.31

586

41809.77

... More
construction of Steps;BLD-CSTN-8-9-(84): Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges but including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing. scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

18

614

11064.6

... More
construction of Steps;BLD-CSTN-5-17-(55): Masonry work in CM (1:4) prop with Flyash Cement solid blocks of size 145x225x140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

14.44

8996

129904.98

... More
construction of Steps;Amendment 2021-22 BLD-CSTN-2-8 (16): Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

27

488

13183.83

... More
construction of Steps;BLD-CSTN-6-6-(61) Construction of RR Masonry in Cement Mortor (16) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand, Water, Granite Stones, including Seigniorage Charges on all Materials, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work

21.57

5203

112242.51

... More
construction of Steps;SS railing using 25 mm dia, 1.60mm thick 3 Numbers Bottom

111.61

722

80648.27

... More
construction of Steps;Supply & Fixing of Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for- 304 Grade including Labour charges for Fabrication of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges overheads & contractors profit for finished item of work.

99.9

722

72186.74

... More
construction of Steps;Supply and Fixing in ng in position of steel works like all structural steel works like heavy steel works Ake Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc Including cost and conveyance of all material, labour charges for fabrication and fixing in postion etc, Complete as per IS 2062-2011 E 250 BR

6568.08

148

977593.03

... More
construction of Steps;MS Rectangular Pipes 80 x40x4mm

76.08

121

9248.86

... More
construction of Steps;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle afround and 2 Nos 35x35x5mm Equat angles horizontal supports at 0.50m cc, 2.00mm MS sheet at bottom 0.30m height and 16mm MS square bars Vertically at 100mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry. fxing and making to original surface neatly and including cost and conveyance of all materials, Locking arrangment, Omamental pieces etc cutting, bending, welding including all operational charges and all tabour charges etc., complete for finished item of work for 3.00m & above 3m span gates 21

468.6

121

56967.7

... More
construction of Steps;For Ms Poles of Iron stepms

4.96

12115

60094.76

... More
construction of Steps;BLD-CSTN-3-14-(31)-A Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER/MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc, to site including all operational, Incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code to FOUNDATIONS, PLINTH,

1.65

10103

16671.2

... More
construction of Steps;BLD-CSTN-3-5 (22) -Using Concrete mixture all works up to Plinth Level: Plain Cement Concrete (1:5:10) cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials and including all charges for machine mixing. laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished

9.63

5438

52369.87

... More
construction of Steps;BLD-CSTN-2-7-(15) Earth work excavation in Hard rock (blasting prohibited)-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking. strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS 20 B (APSS 308)

120.85

1020

123376.97

... More
construction of Steps;LD-CSTN-2-1 (9) Earth work excavation in Ordinary Soil by Manual Means for structures in all types of soil as per drawing and technical specifications and depositing on bank for all ts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring sheeting, planking, strutting, etc complete for finished item of work excluding dewatering charges etc as per SS-20 B (APSS 308)

120.85

297

35922.66



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.