Municipal Administration Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipal Administration Department Tender
Civil And Construction
Road Construction
Opening Date20 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 7,64,462
Costs
EMD
₹ 7,645Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
545449Bid Award Id
ViewTender No
E1/2057/17/2024-25Tender Authority
Municipal Administration Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Laying of CC Road;BLD-CSTN-9-21-(119) :Providing cladding with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, Note: (b) For dadooing or cladding items, data for relevant Skirting Items may be adopted adding the cutting charges of the stones/ tiles as the case may be)
0.86
3918
3389.61
Laying of CC Road;Construction of Inauguration/ Foundation Masonry Pedestal with earth work excavation, PCC bed, RR Masonry, Brick Work, Plastering, White washing and polished shabad flooring suitable for fixing granite stone of size 2.5' x 5' including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work.
1
9633
9633.39
Laying of CC Road;Repirs of sewer circular conical manhole as per type design using flyash Bricks of size 225 x 10 x 6 cms having minimum Crushing strength 75 Kgs Per Sqm as per IS:12894-1990 - CLASS - 7.5 using Sulphete resisting cement in CM (1:3) prop; of M15 (1:2.5:5) prop. using 20mm HG metal for benching and channels, inside plastering with 20mm thick using Sulphete resisting cement in CM (1:3) prop; and outside plastering with 20mm thick using OPC in CM (1:3) prop;fixing of 560mm dia manhole frame and cover (HD-20) and and all other incidental and operational charges etc., complete.(0.9 mtx0.9mt)
4
779
3118.16
Laying of CC Road;Groove Cutting of 2-4 mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond studded saw within 24 hours of casting of CC pavement
159.6
68
10991.65
Laying of CC Road;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vaccum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc., complete for finished item of work as directed by Engineer-in-charge of the work. (As per EE, Saroor Nagar, Circle-5, GHMC T.S.No. 104/2018-19 Dt.27.07.2018)
547.2
75
41040
Laying of CC Road;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
34.56
488
16875.3
Laying of CC Road;Supply and placing of Ready Mix Concrete M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 21 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete.(RMC-M30) Note:The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.
82.08
5722
469717.57
Laying of CC Road;RBR- SBBS-11B Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.
86.4
2273
196456.32
Laying of CC Road;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)
86.4
76
6614.78