Mission Bhagiratha Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Mission Bhagiratha Department Tender
Civil And Construction
Pipe Line Project
Opening Date8 Apr 2025
Closing Date15 Apr 2025
Tender Amount₹ 38,08,158
Costs
EMD
₹ 38,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
572716Tender No
14/2024-25 Dt: 27-01-2025Tender Authority
Mission Bhagiratha Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
laying of pl rupireddy;Construction of sluice valve set upwith existing sluice valve to suit the pressure class of pipe including cost and conveyance of all materials such as required specials for gate valve arrengements such as D/F pipes collers flanges and constrution of RCC valve chamber e.t.c, as per data sheet for finished items of works including cost of all materials all type of tax,labour charges earth work excavetion charges in all types of soils except hard rocktesting to the required pressure and refilling and tamping but excluding the cost of valve, dismantling joint,etc complete for finished item of work for 80 mm Sluice valves on 90 mm Dia 6 kg/cm2 pipe line
5
25008
125040.3
... More
laying of pl rupireddy;Construction of sluice valve set upwith existing sluice valve to suit the pressure class of pipe including cost and conveyance of all materials such as required specials for gate valve arrengements such as D/F pipes collers flanges and constrution of RCC valve chamber e.t.c, as per data sheet for finished items of works including cost of all materials all type of tax,labour charges earth work excavetion charges in all types of soils except hard rocktesting to the required pressure and refilling and tamping but excluding the cost of valve, dismantling joint,etc complete for finished item of work for 80 mm Sluice valves on 75 mm Dia 6 kg/cm2 pipe line.
3
24926
74778.75
... More
laying of pl rupireddy;Construction/Fixing of existing air valve on the pipeline with new stem pipe and with construction of stem concrete with footing and with all the necessary jointing materials like Tees, Longnecks, including cost of lowering the valve placing in location, labour cost, material cost excluding the cost of airvalve, e.t.c., complete, for 50mm Air valves on 180 mm Dia 6 kg/cm2 pipe line
1
37556
37556.86
... More
laying of pl rupireddy;Construction/Fixing of existing air valve on the pipeline with new stem pipe and with construction of stem concrete with footing and with all the necessary jointing materials like Tees, Longnecks, including cost of lowering the valve placing in location, labour cost, material cost excluding the cost of airvalve, e.t.c., complete, for 50mm Air valves on 125 mm Dia 6 kg/cm2 pipe line.
3
29254
87764.76
... More
laying of pl rupireddy;Construction/Fixing of existing air valve on the pipeline with new stem pipe and with construction of stem concrete with footing and with all the necessary jointing materials like Tees, Longnecks, including cost of lowering the valve placing in location, labour cost, material cost excluding the cost of airvalve, e.t.c., complete, for 50mm Air valves on 90mm Dia 6 kg/cm2 pipe line.
3
24206
72618.9
... More
laying of pl rupireddy;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. of 180 mm Dia 6 kg/cm2 HDPE Pipe line
850
1287
1094732
... More
laying of pl rupireddy;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. of 125 mm Dia 6 kg/cm2 HDPE Pipe line
1120
722
809748.8
... More
laying of pl rupireddy;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. of 110 mm Dia 6 kg/cm2 HDPE Pipe line
50
640
32042.5
... More
laying of pl rupireddy;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. of 90 mm Dia 6 kg/cm2 HDPE Pipe linee
1880
462
870064
... More
laying of pl rupireddy;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. of 75 mm Dia 6 kg/cm2 HDPE Pipe line
1070
379
406065
... More
laying of pl rupireddy;Construction of pipe line for water supply with HDPE pipes as per IS:4984:1985, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes, of 63 mm Dia 6 kg/cm2 HDPE Pipe line.
110
327
35970