Mission Bhagiratha Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
280064Bid Award Id
ViewTender No
20/2021-22 Dt: 25-11-2021 of O/o SE MB Circle Warangal (U)Tender Authority
Mission Bhagiratha Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Manufacture and Supply of 3ft dia. CM Rings including loading, unloading and transportation to site etc., complete for Water tubs
192
-
67200
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Provision for Shabad stones at infront of toilet block for Construction of Temporary toilets
230.4
-
26176.9
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Providing Stone dust at infront of toilet block for Construction of Temporary toilets
28.8
-
47067.04
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Hire charges of 30KVAR Generator including the cost of fuels and transportation charges from Warangal to Medaram for welding of GI Sheet toilets etc., complete for Construction of Temporary toilets
128
-
185369.86
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Add Hooks(40 Nos each) for other U/S item of works etc., complete for Construction of Temporary toilets
1280
-
15360
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Add Hinges (40 Nos each) of works etc., complete for Construction of Temporary toilets
640
-
7680
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Labour chages for loading , unloading and transportation of GI Sheet and MS Angles after dismantaling tiolets to godown (@ 10% cost)
3.2
-
317062.4
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Labour chages for loading , unloading and transportation of GI Sheet and MS Angles Godown to work spot @ 5% cost) for Construction of Temporary toilets
1.6
-
158531.2
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Nuts & Bolts @ 0.05 kgs per kg of structrural steel for Construction of Temporary toilets
1836.16
-
196098.4
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Fabrication Charges and Fixing Charges of Sturctral steels i.e GI Sheets door and toilet frmewith MS Angles for Construction of Temporary toilets
36724.8
-
1679900.69
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Supply and Laying of LDPE (geo membrane) 500 micron thick sheet over Leach pit for Construction of Temporary toilets
480
-
54535.2
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Supply of Bamboo Ballies for superstructure of the latrine including all taxes and transportation to site etc., complete Inside of Soak Pit for shoring horizontal over leachpit for Construction of Temporary toilets
528
-
17323.58
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Supply of Bamboo Thadka for superstructure of the latrine including all taxes and transportation to site etc., complete for soak pits for Construction of Temporary toilets
768
-
130884.48
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Supply of 90mm dia 4 Kgf/cm2 PVC pipes for Connecting W.C Pan with Soak pit including all taxes and transportation to site etc., complete for Construction of Temporary toilets
768
-
97727.08
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Plastering with CM (1:5) using 12mm thick including cost and conveyance of all materials and labour charges etc., complete for Construction of Temporary toilets
604.48
-
95088.19
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Plain cement concrete corresponding to (1:4:8) prop mix nominal mix (Cement: fine aggregate: coarse agregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse agregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidential, and labour charges such as mixing, laying and ramming concerete in layers in position not exceeding 15cm finishing top surface curing concrete etc., complete for finished item of work for flooring bed to platform for Construction of Temporary toilets
17.92
-
87796.23
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work (APSS No. 309 & 310) For Sand Filling for Long walls excluding WC for Construction of Temporary toilets
129.92
-
131620.93
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Labour Charges for fixing of Indian Pattern WC with 'P' Trap for Construction of Temporary toilets
640
-
91616
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Brick masonry in superstructure with CM (1:6) prop mix using Fly Ash Bricks of size 29x20.0x14 cms from approved source having minimum crushing strength of 50 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)
79.04
-
524488.44
... More
Construction of Temporary toilets with GI sheets with existing material in Narlapur, Kalwapally X Ro;Earthwork excavation for foundations using 1/3rd Manual Means and 2/3rd Qty of Mechanical Means using Hydraulic Excavator and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc., complete for finished item of work. for Long Walls, Short walls, for LEach pit, for erection of Verticals of GI sheet frame using 1/3 rd Manual and 2/3 rd Mechanical means
296
-
39184.48
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements