Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Works
Civil And Construction
Building Construction
Opening Date30 Jan 2025
Closing Date6 Feb 2025
Tender Amount₹ 33,20,621 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Permanent toilets at main ghat;Supply of fresh air exhaust fan of Heavy duty 250V A.C.50Hz.. 300mm size (12") / 375 mm (15") 900 R.P.M etc., complete.

3

2451

7353.15

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

250

77

19385

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of ISI marked 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe on surface of wall with PVC / Metallic junction boxes fixing on chromium plated metallic base saddles including all required materials with redoing wall fine cement plastering etc., completewith all labour charges for run of mains.

460

93

43157.2

... More
Construction of Permanent toilets at main ghat;Supply and fixing of 6A 1 Way flush type Swich. with cover frame of GM / Legrand Mossaic / L & T / North West / M K / Salzer / Indo Simon makes, including giving connections and all labour charges etc.(Raw power & UPS sockets) (ELEC-1.7.1 , (h),Sl.No 298 P.No : 279)

30

20

600

... More
Construction of Permanent toilets at main ghat;Supply and fixing of 6A Modular Switch, 3/2 pin sockets, suitable Modular box with cover frame of GM / Legrand Mossaic / L & T / North West / M K / Salzer / Indo Simon makes, including giving connections and all labour charges etc.(Raw power sockets) (ELEC-1.4.1, (e),Sl.No 134 P.No : 274)

4

170

680

... More
Construction of Permanent toilets at main ghat;Supply and fixing of 6A 3/2 pin Modular socket with Switch and cover frame of Mossaic / L&T / North West / MK / Salzer make on a common switch board with earth connections and all labour charges etc., complete.

25

39

975

... More
Construction of Permanent toilets at main ghat;Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1 No. 3 phase ELCB / RCCB / FP Isolator as incomer and 10 Nos 10kA 10-32 A SP MCBs as outing goings including internal connection and labour charges for flush mounting etc., complete.(ELEC-2.13.2 (f) Sl.No :646,P.No :291) ,sL.NO ;Make: Legrand / Schneider

5

1150

5750

... More
Construction of Permanent toilets at main ghat;Supply and fixing of concealed box PVC/MS with hook for fan (ELEC10.1.22,Sl.No : 1846,P.No : 384)

6

138

828

... More
Construction of Permanent toilets at main ghat;Supply and fixing double skin cement-based Board partition with Framework made of GI stud profile of size 48x40x 10x 0.6 mm thick placed at every 610 mm C/C intervals and 915 mm horizontal intervals duly fixed with selfexpansion screws, the Cement Bonded Board of 8 mm thick cladded around with self-tapping self-embedding screws fixed at every 300 mm (centres) leaving a 3 mm gap between two panels of width 2?-0?(610 mm). The Gap will be covered with a decorative moulding surface will be given a smooth finish over cement primer. The rate Inclusive of cost and conveyance of all materials and labour charges etc., Complete (TBSC-K.IV-16 ,Sl.No : 526 P.No: 90) Urinals Partition

3

1492

4476

... More
Construction of Permanent toilets at main ghat;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per standard specifications, TBSP-B.I-03 ,Sl.No :80, P.No :219

1

8766

8766

... More
Construction of Permanent toilets at main ghat;S&F Stainless steel 4" dia round Grating for nahany or floor trap cover with cockroach trap with or without hole TBSP-F.VII-28 , Sl.No : 387, P.No : 238

15

183

2745

... More
Construction of Permanent toilets at main ghat;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover TBSP-A.I-09 Sl.No :9 P. No : 215

10

749

7490

... More
Construction of Permanent toilets at main ghat;Supplying &Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995 (TBSP-E.VII-01,Sl.no :295,P.No : 233)

4

1100

4400

... More
Construction of Permanent toilets at main ghat;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (TBSP-F.I-01 ,Sl.No :275,p.no :234)

15

275

4125

... More
Construction of Permanent toilets at main ghat;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 TBSP-F.I-01 ,Sl.No :312,P.No234

15

275

4125

... More
Construction of Permanent toilets at main ghat;S & F 15 mm nominal size brass concealed stop valve screw type with internal /external threaded conforming to IS 8931 TBSP-F.IV-02 ,SL.No :337 P.No :235

15

280

4200

... More
Construction of Permanent toilets at main ghat;S&F of 15 mm brass body CP finish self-closing tap lift type conforming to IS1711 TBSP-F.III-02 ,Sl.No : 330, P.No :235

10

265

2650

... More
Construction of Permanent toilets at main ghat;Supplying and fixing Rectangular Mirror Frameless of size 457 .2 mm x 609.6 mm (TBSP-J.I-41, sl.no :687 ,p.no :250)

3

1619

4857

... More
Construction of Permanent toilets at main ghat;Supplying and Fixing Pedestal for Wash Hand Basin (TBSP-E.VI-12, Sl.No :290, p.no :232)

3

1599

4797

... More
Construction of Permanent toilets at main ghat;Providing Brick masonry seat for Orissa pan/ Indian W.C. using traditional common burnt clay bricks as per standard practice, TBSP-E.I-06,Sl.No 263,P.No :229

10

333

3330

... More
Construction of Permanent toilets at main ghat;Supplying & fixing approved make Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 630 mm (TBSP-E.I-02 ,Sl .No :259, P.No : 229)

10

1652

16520

... More
Construction of Permanent toilets at main ghat;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'P' trap( TBSP-E.II-01,Sl.No: 265,P.No : 229)

5

1962

9810

... More
Construction of Permanent toilets at main ghat;Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc. any diameter including fixing necessary fittings like, TBSP-H.IV-01, Sl.No 644,P.No:248

120

104

12480

... More
Construction of Permanent toilets at main ghat;110 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR Pipe-4 TBSP-H.I-07 ,SL.No 474,P.No 479

10

661

6610

... More
Construction of Permanent toilets at main ghat;90 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 TBSP-H.I-06 ,SL.No 474,P.No 478

10

540

5400

... More
Construction of Permanent toilets at main ghat;75 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 TBSP-H.I-05 ,SL.No 474,P.No 477

10

339

3390

... More
Construction of Permanent toilets at main ghat;40 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 TBSP-H.I-06 ,SL.No 474,P.No 476

10

245

2450

... More
Construction of Permanent toilets at main ghat;110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm TBSP-H.I-03 ,SL.No 474,P.No 474

15

569

8535

... More
Construction of Permanent toilets at main ghat;90 mm dia 3 M single Socket PVC/SWR pipe - 4 Kg/sq.cm TBSP-H.I-02 ,SL.No 473,P.No 474

15

477

7155

... More
Construction of Permanent toilets at main ghat;75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm TBSP-H.I-01 ,SL.No 473,P.No 473

15

301

4515

... More
Construction of Permanent toilets at main ghat;Supply of 32mm CPVC - Sche-80 Ball Valve TBSC-J.IV-26,Sl.No 949 & P.No 265

3

630

1890

... More
Construction of Permanent toilets at main ghat;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charg TBSC-J.IV-09,Sl.No 932,P.No:264

20

410

8200

... More
Construction of Permanent toilets at main ghat;S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all aterials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge ,TBSC-J.IV-07,Sl.No 930,P.No:263

40

239

9560

... More
Construction of Permanent toilets at main ghat;Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.

1.45

74245

107655.4

... More
Construction of Permanent toilets at main ghat;Painting to new wood work with Melamine polish paint two coats over a primary coat including cost and conveyance of all materials and labour charges etc. complete.

25.43

132

3359.28

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of SAL/COUNTRY ventilator with frame size 0.9x0,45mtrs with Horizontal Sacntlings 0.9m-2 Nos,Vertical Scantling 0.45m-3 Nos with glass of size-0.25x0.2m size-2 Nos including cost and conveyance of all materials to site all labour charges such as fixing with Hardware fixtures etc, complete for Finished item of work.

15

585

8786.54

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of SAL/COUNTRY wood Door with Double leaf shutter, Door Size 0.75X2.10 mtrs with 30mm thickness plank, SAL/COUNTRY Frame of sections size 100mm X 125mm with vertical scantling of 2.10m-2no's and horizontal scantling of 0.75 m-2no's. including cost of fixtures such as 1No Aluminium Aldrop (IS:2681) 250 mm long, 1Nos Aluminuium Tower Bolt-10 mm Bolt 150 mm Long, 2Nos Aluminium fancy handles 150 mm, 6Nos MS Powder coated Butt hinges- 125mm Long, 1No Flat latch Aluminium 250mm long, MS Hold fasts 4Nos 230mm long and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

15

9103

136548.35

... More
Construction of Permanent toilets at main ghat;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work,

102.6

1143

117331.31

... More
Construction of Permanent toilets at main ghat;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

69.18

1051

72723.73

... More
Construction of Permanent toilets at main ghat;Plastering with CM 2 coats, 20mm thick to brick wall, base coat in CM (1:6) prop. 16mm thick and top coat in CM (1:3) prop. 4mm thick with Dubara sponze finishing including cost & coveyance of all materials, lalbour charges,seign.charges etc.complete.

255.8

2567

65665.39

... More
Construction of Permanent toilets at main ghat;Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete.

28.9

6933

200338.47

... More
Construction of Permanent toilets at main ghat;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

99.46

18009

179112.3

... More
Construction of Permanent toilets at main ghat;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

3.87

15122

58502.36

... More
Construction of Permanent toilets at main ghat;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

2.57

13661

35127.18

... More
Construction of Permanent toilets at main ghat;Providing and filling morrum/gravel soil in basement with watering and tamping etc. complete.

20.36

1154

23493.85

... More
Construction of Permanent toilets at main ghat;VRCC (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

5.3

12938

68611.74

... More
Construction of Permanent toilets at main ghat;VRCC M20(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

0.56

13661

7692.08

... More
Construction of Permanent toilets at main ghat;VRCC (1:1.5:3) using 20mm HBG metal for column footings but excluding cost of steel and fabrication charges incl. c/c material,labour charges

8.96

10456

93720.53

... More
Construction of Permanent toilets at main ghat;Plain Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete.

2.99

5408

16157.95

... More
Construction of Permanent toilets at main ghat;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

23.9

161

3856.5

... More
Construction of Permanent toilets at main ghat;TBSP-H.II-01 Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks (TBSP-H.II-01 Sl.No : 538,P.No :245)

1000

10

10000

... More
Construction of Permanent toilets at main ghat;Supplying and fixing Gyp Board Fine Line Grid false ceiling (GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600 mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm conforming to IS 2095 - 1982 fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard Sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm and finishing two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification. (BLD-CSTN-8-32)

70

1540

107847.22

... More
Construction of Permanent toilets at main ghat;Supply and Delivery of 50mm dia. SS Nipples

2

400

800

... More
Construction of Permanent toilets at main ghat;Supply and Delivery of Bore Cover (ELEC-513.6-d)

1

150

150

... More
Construction of Permanent toilets at main ghat;Supply and Delivery of 50mm dia.Clampset

2

300

600

... More
Construction of Permanent toilets at main ghat;Supply of 6.00Sqmm WPSC ISI Allumininum Wire

65

1945

1264.25

... More
Construction of Permanent toilets at main ghat;Supply of 4.0 Sqmm 2 Core PVC / XLPE Insulated Sheathed Multi Core Bright Annealed Bare Copper Conductor Heavy Duty Industrial Cables for Voltage Grade upto 1100 Volts as per IS: 694:1990 including all transportation charges etc complete. Makes : Sun cab / Powerflex / Delton / Airson / Savera Champion / Rhino /Rajnigandha / Pawancab / South King (ELEC 4.1.1.(a)_ Sl.No :909,P.No :312)

60

180

10800

... More
Construction of Permanent toilets at main ghat;Supply and Delivery of GI Bends(TBSP- G.II-9)

2

80

160

... More
Construction of Permanent toilets at main ghat;Supply and delivery of UPVC Raising ColumnPipes for submersible motors with both endssquare threaded, with rubber 'O' rings with smooth inner surface which can take theminimum load of 2100 to 4000 Kgs weights. Nominal diameter of Standard 60 / 50mm UPVCpipe withstanding up to 20 Kgs / CM2 up to 200Mts (ELEC 5.11.1 (C),sL.No :1196,P.No : 328

70

400

28000

... More
Construction of Permanent toilets at main ghat;Supply & Fixing of D.O.L Starter 250V, Single phase, 50Hz. With Sheet Steel enclouser comprising of contactor with bi-metalic relay with neceSheet Steelary push buttons, etc., complete suitable ------ Makes: Siemens / LK (L&T) / BCH (ELEC 5.4.1, P.No : 323)

1

2400

2400

... More
Construction of Permanent toilets at main ghat;Supply and Transportation of star rated 3.00 HP 5-10 Stage Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryan Varsha/ Lubi / Falcon (ELEC 5.6.2,P.No :325)

1

32800

32800

... More
Construction of Permanent toilets at main ghat;Inserting 180mm dia 6kg/sqcm PVC Pipe for casing including all charges etc complete. Slotted Casing Pipe.

95

774

73530

... More
Construction of Permanent toilets at main ghat;Inserting 180mm dia 6kg/sqcm PVC Pipe for casing including all charges etc complete. Plain Casing Pipe.

12

674

8088

... More
Construction of Permanent toilets at main ghat;Drilling of 6½" dia Bore Well in with power rig drilling in all types of soils and such as loose soils and hard rock formation including inserting of Casing pipe etc., complete.

90

600

54000

... More
Construction of Permanent toilets at main ghat;Supply of 48" (1200mm) Sweep decorative Ceiling Fan 1 Star Rated with all accessories etc., complete. Makes : Crompton / Havells / Orient / Halonix (ELEC-5.1.9 ,Sl.no : 1068,P.No : 321)

3

2000

6000

... More
Construction of Permanent toilets at main ghat;Supply of fresh air exhaust fan of Heavy duty 250V A.C.50Hz.. 300mm size (12") / 375 mm (15") 900 R.P.M etc., complete.

3

2451

7353.15

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

250

77

19385

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of ISI marked 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe on surface of wall with PVC / Metallic junction boxes fixing on chromium plated metallic base saddles including all required materials with redoing wall fine cement plastering etc., completewith all labour charges for run of mains.

460

93

43157.2

... More
Construction of Permanent toilets at main ghat;Supply and fixing of 6A 1 Way flush type Swich. with cover frame of GM / Legrand Mossaic / L & T / North West / M K / Salzer / Indo Simon makes, including giving connections and all labour charges etc.(Raw power & UPS sockets) (ELEC-1.7.1 , (h),Sl.No 298 P.No : 279)

30

20

600

... More
Construction of Permanent toilets at main ghat;Supply and fixing of 6A Modular Switch, 3/2 pin sockets, suitable Modular box with cover frame of GM / Legrand Mossaic / L & T / North West / M K / Salzer / Indo Simon makes, including giving connections and all labour charges etc.(Raw power sockets) (ELEC-1.4.1, (e),Sl.No 134 P.No : 274)

4

170

680

... More
Construction of Permanent toilets at main ghat;Supply and fixing of 6A 3/2 pin Modular socket with Switch and cover frame of Mossaic / L&T / North West / MK / Salzer make on a common switch board with earth connections and all labour charges etc., complete.

25

39

975

... More
Construction of Permanent toilets at main ghat;Supply of 40-63A 10KA DP MCB, C/D Curve ISI Mark Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1 No. 3 phase ELCB / RCCB / FP Isolator as incomer and 10 Nos 10kA 10-32 A SP MCBs as outing goings including internal connection and labour charges for flush mounting etc., complete.(ELEC-2.13.2 (f) Sl.No :646,P.No :291) ,sL.NO ;Make: Legrand / Schneider

5

1150

5750

... More
Construction of Permanent toilets at main ghat;Supply and fixing of concealed box PVC/MS with hook for fan (ELEC10.1.22,Sl.No : 1846,P.No : 384)

6

138

828

... More
Construction of Permanent toilets at main ghat;Supply and fixing double skin cement-based Board partition with Framework made of GI stud profile of size 48x40x 10x 0.6 mm thick placed at every 610 mm C/C intervals and 915 mm horizontal intervals duly fixed with selfexpansion screws, the Cement Bonded Board of 8 mm thick cladded around with self-tapping self-embedding screws fixed at every 300 mm (centres) leaving a 3 mm gap between two panels of width 2?-0?(610 mm). The Gap will be covered with a decorative moulding surface will be given a smooth finish over cement primer. The rate Inclusive of cost and conveyance of all materials and labour charges etc., Complete (TBSC-K.IV-16 ,Sl.No : 526 P.No: 90) Urinals Partition

3

1492

4476

... More
Construction of Permanent toilets at main ghat;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per standard specifications, TBSP-B.I-03 ,Sl.No :80, P.No :219

1

8766

8766

... More
Construction of Permanent toilets at main ghat;S&F Stainless steel 4" dia round Grating for nahany or floor trap cover with cockroach trap with or without hole TBSP-F.VII-28 , Sl.No : 387, P.No : 238

15

183

2745

... More
Construction of Permanent toilets at main ghat;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover TBSP-A.I-09 Sl.No :9 P. No : 215

10

749

7490

... More
Construction of Permanent toilets at main ghat;Supplying &Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995 (TBSP-E.VII-01,Sl.no :295,P.No : 233)

4

1100

4400

... More
Construction of Permanent toilets at main ghat;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (TBSP-F.I-01 ,Sl.No :275,p.no :234)

15

275

4125

... More
Construction of Permanent toilets at main ghat;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 TBSP-F.I-01 ,Sl.No :312,P.No234

15

275

4125

... More
Construction of Permanent toilets at main ghat;S & F 15 mm nominal size brass concealed stop valve screw type with internal /external threaded conforming to IS 8931 TBSP-F.IV-02 ,SL.No :337 P.No :235

15

280

4200

... More
Construction of Permanent toilets at main ghat;S&F of 15 mm brass body CP finish self-closing tap lift type conforming to IS1711 TBSP-F.III-02 ,Sl.No : 330, P.No :235

10

265

2650

... More
Construction of Permanent toilets at main ghat;Supplying and fixing Rectangular Mirror Frameless of size 457 .2 mm x 609.6 mm (TBSP-J.I-41, sl.no :687 ,p.no :250)

3

1619

4857

... More
Construction of Permanent toilets at main ghat;Supplying and Fixing Pedestal for Wash Hand Basin (TBSP-E.VI-12, Sl.No :290, p.no :232)

3

1599

4797

... More
Construction of Permanent toilets at main ghat;Providing Brick masonry seat for Orissa pan/ Indian W.C. using traditional common burnt clay bricks as per standard practice, TBSP-E.I-06,Sl.No 263,P.No :229

10

333

3330

... More
Construction of Permanent toilets at main ghat;Supplying & fixing approved make Indian pattern white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 630 mm (TBSP-E.I-02 ,Sl .No :259, P.No : 229)

10

1652

16520

... More
Construction of Permanent toilets at main ghat;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'P' trap( TBSP-E.II-01,Sl.No: 265,P.No : 229)

5

1962

9810

... More
Construction of Permanent toilets at main ghat;Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc. any diameter including fixing necessary fittings like, TBSP-H.IV-01, Sl.No 644,P.No:248

120

104

12480

... More
Construction of Permanent toilets at main ghat;110 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR Pipe-4 TBSP-H.I-07 ,SL.No 474,P.No 479

10

661

6610

... More
Construction of Permanent toilets at main ghat;90 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 TBSP-H.I-06 ,SL.No 474,P.No 478

10

540

5400

... More
Construction of Permanent toilets at main ghat;75 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 TBSP-H.I-05 ,SL.No 474,P.No 477

10

339

3390

... More
Construction of Permanent toilets at main ghat;40 mm dia 3 M Kg/sq.cm Double Socket PVC/SWR pipe - 4 TBSP-H.I-06 ,SL.No 474,P.No 476

10

245

2450

... More
Construction of Permanent toilets at main ghat;110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm TBSP-H.I-03 ,SL.No 474,P.No 474

15

569

8535

... More
Construction of Permanent toilets at main ghat;90 mm dia 3 M single Socket PVC/SWR pipe - 4 Kg/sq.cm TBSP-H.I-02 ,SL.No 473,P.No 474

15

477

7155

... More
Construction of Permanent toilets at main ghat;75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm TBSP-H.I-01 ,SL.No 473,P.No 473

15

301

4515

... More
Construction of Permanent toilets at main ghat;Supply of 32mm CPVC - Sche-80 Ball Valve TBSC-J.IV-26,Sl.No 949 & P.No 265

3

630

1890

... More
Construction of Permanent toilets at main ghat;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charg TBSC-J.IV-09,Sl.No 932,P.No:264

20

410

8200

... More
Construction of Permanent toilets at main ghat;S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all aterials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge ,TBSC-J.IV-07,Sl.No 930,P.No:263

40

239

9560

... More
Construction of Permanent toilets at main ghat;Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.

1.45

74245

107655.4

... More
Construction of Permanent toilets at main ghat;Painting to new wood work with Melamine polish paint two coats over a primary coat including cost and conveyance of all materials and labour charges etc. complete.

25.43

132

3359.28

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of SAL/COUNTRY ventilator with frame size 0.9x0,45mtrs with Horizontal Sacntlings 0.9m-2 Nos,Vertical Scantling 0.45m-3 Nos with glass of size-0.25x0.2m size-2 Nos including cost and conveyance of all materials to site all labour charges such as fixing with Hardware fixtures etc, complete for Finished item of work.

15

585

8786.54

... More
Construction of Permanent toilets at main ghat;Supply and Fixing of SAL/COUNTRY wood Door with Double leaf shutter, Door Size 0.75X2.10 mtrs with 30mm thickness plank, SAL/COUNTRY Frame of sections size 100mm X 125mm with vertical scantling of 2.10m-2no's and horizontal scantling of 0.75 m-2no's. including cost of fixtures such as 1No Aluminium Aldrop (IS:2681) 250 mm long, 1Nos Aluminuium Tower Bolt-10 mm Bolt 150 mm Long, 2Nos Aluminium fancy handles 150 mm, 6Nos MS Powder coated Butt hinges- 125mm Long, 1No Flat latch Aluminium 250mm long, MS Hold fasts 4Nos 230mm long and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

15

9103

136548.35

... More
Construction of Permanent toilets at main ghat;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work,

102.6

1143

117331.31

... More
Construction of Permanent toilets at main ghat;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

69.18

1051

72723.73

... More
Construction of Permanent toilets at main ghat;Plastering with CM 2 coats, 20mm thick to brick wall, base coat in CM (1:6) prop. 16mm thick and top coat in CM (1:3) prop. 4mm thick with Dubara sponze finishing including cost & coveyance of all materials, lalbour charges,seign.charges etc.complete.

255.8

2567

65665.39

... More
Construction of Permanent toilets at main ghat;Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete.

28.9

6933

200338.47

... More
Construction of Permanent toilets at main ghat;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

99.77

18009

179672.03

... More
Construction of Permanent toilets at main ghat;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

3.87

15122

58502.36

... More
Construction of Permanent toilets at main ghat;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

2.57

13661

35127.18

... More
Construction of Permanent toilets at main ghat;Providing and filling morrum/gravel soil in basement with watering and tamping etc. complete.

20.36

1154

23493.85

... More
Construction of Permanent toilets at main ghat;VRCC (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

5.3

12938

68611.74

... More
Construction of Permanent toilets at main ghat;VRCC M20(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.

0.56

13661

7692.08

... More
Construction of Permanent toilets at main ghat;VRCC (1:1.5:3) using 20mm HBG metal for column footings but excluding cost of steel and fabrication charges incl. c/c material,labour charges

8.96

10456

93720.53

... More
Construction of Permanent toilets at main ghat;Plain Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete.

2.99

5408

16157.95

... More
Construction of Permanent toilets at main ghat;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

23.9

161

3856.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.