Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Civil Works Water Works
Opening Date9 Nov 2019
Closing Date15 Nov 2019
Tender Amount₹ 44,10,503 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
90 mm dia 6Kg/cm2 HDPE Pipes

700

-

211.32

... More
75 mm dia 6Kg/cm2 HDPE Pipes

900

-

147.7

... More
63 mm dia 6 Kg/cm2 HDPE Pipes

600

-

104.53

... More
Earthwork excavation of pipe trench of size (0.50x0.75) Mtrs and (0.70x1.00) mtrs in all soils as per SS-20B with lead & lift and lowering and laying, jointing of following HDPE pipes into the readymade trenches and true to the alignment and gradient and testing the pipe line to the required pressure and refilling the trenches with excavated soils including watering & tamping etc., complete.

-

-

-

... More
140 mm dia 6Kg/cm2 HDPE Pipes

-

-

311.8

... More
110 mm dia 6Kg/cm2 HDPE Pipes

-

-

289.62

... More
90 mm dia 6Kg/cm2 HDPE Pipes

-

-

272.99

... More
75 mm dia 6Kg/cm2 HDPE Pipes

-

-

196.39

... More
63 mm dia 6 Kg/cm2 HDPE Pipes

-

-

190.84

... More
Erection of Existing Battery of Taps with Platform

85

-

-

... More
Earthwork excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc., complete for finished item of work including seigniorage excluding dewatering charges etc., as per SS-20B (APSS 308)

-

-

224.53

... More
Plain cement concrete(1:5:10) proportion (cement) fine aggregate coarse aggregate for foundation using 40mm size HBG Metal(SS.5) from approved quarry including cost and conveyance of all materials like cement, sand coarse aggregate water including machine mixing and vibrating charges, seneriage charges etc to site including of all materials and all labour charges etc. finished item of work as per SS of APSS for levelling course.

-

-

4031.35

... More
Plastering with CM (1:5) using 12 mm thick including cost and conveyance of all materials and labour charges etc., complete

-

-

1391.38

... More
Collection and Spreading of Stone Dust including cost and conveyance of all materials and labour charges etc., complete.

-

-

1599.85

... More
Supplying, fitting and placing of structural steel and its fabrication Chargesi ncluding cost and conveyance of all materials and labour charges etc., complete

-

-

94.26

... More
Fixing of Battery of Taps including keeping in position the vertical posts etc., complete.

-

-

1440

... More
Supply and Delivery of following HDPE and GI specials including all taxes and transportation to site etc., complete.

-

-

-

... More
15mm dia. GI pipe (TBSP-G.I-07)

-

-

306.87

... More
50mm dia GI Pipe

-

-

334.93

... More
50mm dia GI Union (TBSP-G.II-06)

-

-

143

... More
Painting two coats with approved brand departmental color including C/c of all materials and L/c etc., complete.

-

-

1090.36

... More
Removing of f Battery of Taps including Transportation to Godown etc., complete.

-

-

1440

... More
Supply and Delivery of 20 Hp Pumpset including all taxes and transportation to site etc., complete.

2

-

200000

... More
Hire charges of 30KVAR Generator excluding the cost of fuels and transportation charges from Warangal to Medaram for Testing Pipe Lines, cisterns etc., complete.

96

-

1155.12

... More
Hire charges of 30KVAR Generator excluding the cost of fuels and transportation charges from Warangal to Medaram for Testing Pipe Lines, cisterns etc., complete.

28

-

1818.75

... More
Hire charges of 30KVAR Generator excluding the cost of fuels and transportation charges from Warangal to Medaram for Testing Pipe Lines, cisterns etc., complete.

56

-

903.92

... More
Errection of Existimg P/set including labour charges etc., complete.

14

-

4500

... More
Removing of Existing P/set including labour charges etc., complete.

14

-

4500

... More
Pump operator charges for repair and testing of existing pipe line and BOT's and opertation of and maintenance of pipe line and BOT's during the Jathara Period

192

-

720.8

... More
Labour charges and Plumber engaged for fixing of G.I pipes, sluice valves, attending leakages etc., during erection and testing of pipe lines, cisterns and For opertation of and maintenance of pipe line and BOT's during the Jathara Period, complete

1

-

-

... More
Plumbers

-

-

803.97

... More
Man Mazdor

-

-

783.17

... More
Electrician

-

-

616.84

... More
Cost,Supply and Delivery of 32 mm Dia 10.00Kg/cm2 PVC pipe including all taxes, loading unloadingandtransport to site etc., complete

2700

-

42.04

... More
Lowering, Laying, jointing of PVC/HDPE/MDPE pipes as per BIS No.7634 partIII/75 for PVC and BIS No.7634 part-II/75 for HDPE pipes including earth work excavation and testing to hydralic test pressure including cost of water with a water lead of 500m etc., complete.

-

-

60.99

... More
GI Binding wire

90

-

64

... More
Tap Connection with Salak bottle, Thread bendals

-

-

921.86



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.