Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Works
Civil And Construction
Opening Date21 Dec 2023
Closing Date28 Dec 2023
Tender Amount₹ 37,05,874 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Plain cement concrete corresponding to (1:4:8) prop mix nominal mix (Cement: fine aggregate: coarse agregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse agregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidential, and labour charges such as mixing, laying and ramming concerete in layers in position not exceeding 15cm finishing top surface curing concrete etc., complete for finished item of work.

0.18

5362

949.22

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Manufacture and Supply of 3ft dia. CM Rings including loading, unloading and transportation to site etc., complete.

9

400

3600

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Supply of Bamboo Ballies for superstructure of the latrine including all taxes and transportation to site etc., complete.

237

49

11655.97

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Supply of Bamboo Thadka for superstructure of the latrine including all taxes and transportation to site etc., complete.

108

340

36811.26

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Hire charges of 30KVAR Generator including the cost of fuels and transportation charges from Warangal to Medaram for welding of GI Sheet toilets etc., complete

20

1565

31312.34

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Add Hooks(40 Nos each) for other U/S item of works etc., complete.

148

14

2072

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Add Hinges (40 Nos each) of works etc., complete.

148

14

2072

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Nuts & Bolts @ 0.05 kgs per kg of structrural steel

500

10

5112.68

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Fabrication Charges and Fixing Charges of Sturctral steels i.e GI Sheets door and toilet frmewith MS Angles

500

54

27029.93

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Supply of 110mm dia 4 Kgf/cm2 PVC pipes for Connecting W.C Pan with Soak pit including all taxes and transportation to site etc., complete.

111

196

21817.49

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;White washing two coats with lime of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powedered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials.

770.33

537

41421.59

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Labour Charges for fixing of Indian Pattern WC with 'P' Trap

50

158

7934

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Earthwork excavation for foundations using 1/3rd Manual Means and 2/3rd Qty of Mechanical Means using Hydraulic Excavator and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc., complete for finished item of work.

61.89

176

10908.11

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Fixing of 0.90m dia Precasted RCC Rings in position at selected place near toilets

46

545

25070

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Plastering with CM (1:4) using 12mm thick using 200ml Complast Liquid per bag of cement including, cost and conveyance of all materials and labour charges etc., complete.

146.74

1774

26041.63

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Plain cement concrete corresponding to (1:4:8) prop mix nominal mix (Cement: fine aggregate: coarse agregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse agregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidential, and labour charges such as mixing, laying and ramming concerete in layers in position not exceeding 15cm finishing top surface curing concrete etc., complete for finished item of work.

2.71

5362

14554.7

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Manufacture and Supply of 3ft dia. CM Rings including loading, unloading and transportation to site etc., complete.

138

400

55200

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Providing Stone dust at infront of toilet block

17.25

2157

37222.88

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Hire charges of 30KVAR Generator including the cost of fuels and transportation charges from Warangal to Medaram for welding of GI Sheet toilets etc., complete

92

1565

144036.79

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Add Hooks(40 Nos each) for other U/S item of works etc., complete.

460

14

6440

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Add Hinges (40 Nos each) of works etc., complete.

920

14

12880

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Labour chages for loading , unloading and transportation of GI Sheet and MS Angles after dismantaling tiolets to godown (@ 10% cost)

2493292

-

249329.2

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Labour chages for loading , unloading and transportation of GI Sheet and MS Angles Godown to work spot @ 5% cost)

2493292

-

124664.6

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Nuts & Bolts)Screws) for 1 unit=350 Screws

8050

10

82314.07

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Fabrication Charges and Fixing Charges of Sturctral steels i.e GI Sheets door and toilet frmewith MS Angles

25739.53

54

1391475.13

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Supply and Laying of LDPE (geo membrane) 500mm micron thick sheet over Leach pit

345

128

44292.81

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Supply of Bamboo Ballies for superstructure of the latrine including all taxes and transportation to site etc., complete. Inside of Soak Pit for shoring

379.5

49

18664.3

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Supply of Bamboo Thadka for superstructure of the latrine including all taxes and transportation to site etc., complete. for Soak pits

552

340

188146.44

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Supply of 110mm dia 4 Kgf/cm2 PVC pipes for Connecting W.C Pan with Soak pit including all taxes and transportation to site etc., complete.

690

196

135622.23

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Plastering with CM (1:5) using 12mm thick including cost and conveyance of all materials and labour charges etc., complete.

434.47

1696

73722.15

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Plain cement concrete corresponding to (1:4:8) prop mix nominal mix (Cement: fine aggregate: coarse agregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse agregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidential, and labour charges such as mixing, laying and ramming concerete in layers in position not exceeding 15cm finishing top surface curing concrete etc., complete for finished item of work. Flooring bed to Platform

14.03

5362

75240.38

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work (APSS No. 309 & 310) For Sand Filling

108.1

1113

120323.16

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Labour Charges for fixing of Indian Pattern WC with 'P' Trap

460

158

72992.8

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Brick masonry in superstructure with CM (1:6) prop mix using Fly Ash Bricks of size 29x20.0x14 cms from approved source having minimum crushing strength of 75 Kg/Sqcm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site including seigniorage charges, sales and other taxes on all materials all opertional, incidental and labour charges such as mixing cement mortar, constructing masonry scaffolding charges, lift charges, curing etc., complete for finished item of work (APSS No. 501&504)

71.99

7725

556181.93

... More
Construction of Temporary Toilets with GI sheet with existing material in Bridgepoint towards medara;Earthwork excavation for foundations using 1/3rd Manual Means and 2/3rd Qty of Mechanical Means using Hydraulic Excavator and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc., complete for finished item of work.

216.43

176

38145.79



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.