Mission Bhagiratha Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Mission Bhagiratha Department Tender
Civil And Construction
Building Construction
Opening Date13 Nov 2024
Closing Soon27 Nov 2024
Tender Amount₹ 16,59,960
Costs
EMD
₹ 16,600Document Cost
Refer DocumentsTender Fee
₹ 6,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
556745Tender No
04/SE/MBNlgd/2024-25Tender Authority
Mission Bhagiratha Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry including Cost and Conveyance of all materials like Granite stones, cement, sand, water, etc., to site including all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation (APSS No. 601 & 615)
13.64
4238
57820
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Coursed Rubble stone masonry 2nd sort, in CM (1:6) prop: (Cement: Sand) using hard blasted granite stones from approved quarry including Cost and Conveyance of all materials like Granite stones, cement, sand, water, etc., to site including all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for basement (APSS No. 601 & 612)
11.24
4737
53248
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Filling with useful available excavated earth ( excluding roxk ) in treanch side of foundations and basmnet with intial lead in ;layers not exceeding 15 CM thick Consolidation each deposited layers by watering and ramming including all Charges etc,
8.06
38
312
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)
43.79
252
11044
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but including centering, shuttering.For Column Footings
4.05
9674
39182
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Pedastals
1.04
10263
10674
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Columns
2.01
11850
23820
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Plinth beams
5.01
12423
62244
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;For Roof Beams in Ground Floor
4.81
10665
51301
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;For Roof Slab with 115mm thick for G.F
13.3
10607
141076
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Lintels
0.76
11865
9018
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Sun Shades (0.0625)
13.5
899
12139
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;100mm thick (platform and lofts)
-
-
-
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Plain Cement concrete (1:3:6) Nominal Mix using using 40mm HBG crusher metal including cost and conveyance of all materials and labour charges etc., complete as per finished item of work
0.23
4769
1097
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Masonry in superstructure with CM (1:6) prop: using 2nd class traditional Bricks of size 23x11x7cm from approved quarry having minimum crushing strength of 50 kg/cm2 including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).GF
38.83
7986
310116
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications etc complete.
2775
87
241425
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
115.66
5668
65563
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Ornamental plastering to ceiling 12mm thick in CM (1:4) with dubara sponge finish including Cost and Conveyance of all materials like cement, sand, water etc., to site, including other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, curing, etc., complete for finished item of work.(APSS 901& 903 )
85.79
1754
15048
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Plastering 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, finishing, curing, etc., complete for for finished item of work. (APSS 901,903 & 904)
-
5203
-
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, finishing, curing, etc., complete for for finished item of work. (APSS 901,903 & 904) - External Walls
261.99
5075
132980
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Supply of polished /stain free Full Body vitrified tiles of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of Specific colour and finish in all shades and set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
79.3
1530
121405
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work,
8.99
14835
13337
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, .
6.49
949
6164
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Dadooing to walls with glazed red or white full body ceramic wall tiles of size 200 x 300 mm / 245 mm x 325 mm and thickness 6 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, fine sand (screened), water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707)
19.98
9608
19199
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Supply and fixing of Medum teak wood Door single shutter fully paneled door of size 1.50x2.10 mts with frame of Medum teak scantlings of size 100 x 65mm and shutter of side rails 100mm x38, top rail 100mmx38mm, bottom rail 100mmx38mm and intermediate rails of 100 x 38 mm and panels - 8nos 25mm thick with all fixtures complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS No.1001 & 1002) (CSSR).
1
27628
27628
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Supply and fixing of Sal wood door Single shutter fully panalled door size of 0.90x2.10mts with frame made of well Flush door shutters, solid bond wood block boardtype with commercial ply on both faces.: 30 mm thick conforming to IS:2202 as per approved design with fixtures of 6Nos of Z holdfasts, 300mm long Alluminium aldrop 1Nos, 125mm long Alluminium butt hinges 4Nos, door stoppers 1Nos, 150mm Tower bolts 1Nos alluminium, 200mm long tower bolt 1Nos. Alluminium fancy handles 1Nos, with necessary screws complete including cost and conveyance of all materials and labour charges etc complete as per specification (APSS No. 1001 & 1002)
81.38
202
16438
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding Doors duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 45 mm x 2.20 mm with reinforcement of 1.2 mm thickness, super sash with overall size of 39 mm x 75 mm x 2.20 mm with for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of bent handle espagulate .the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.
14.58
6888
100434
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Supplying and Fixing of 25mm dia 2.0 mm thick PVC Conduit pipe concealed in wall with all required accessories including chiselling the wall whereever necessaty including masonary work for Light,fan and separate plug point wiht T.W.Deep box including all labour charges etc & complete.
90
80
7243
CONSTRUCTION OF PHC SUB CENTER AT GUNDREPALLY VILLAGE OF CHANDUR MANDAL EST COST 20.00 LAKHS UNDER;Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.
90
57
5185
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%