Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Civil And Construction
Opening Date14 Feb 2022
Closing Date21 Feb 2022
Tender Amount₹ 70,93,837 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Buildings;Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification @100 kg/cum of VRCC for Portico

0.6

-

46090

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. For portico slab

23.32

-

407364

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.for portico roof beam

1.18

-

17208

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. For column up to portico roof beam

0.63

-

8441

... More
Buildings;VRCC M20(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. For GL Beam

0.38

-

5474

... More
Buildings;VRCC M20(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.For column up to GL Beam

0.52

-

6919

... More
Buildings;VRCC 1:1/2:3 using 20mm HBG metal for column footings but excluding cost of steel and fabrication charges incl. c/c material, labour charges for Column footing

4

-

42556

... More
Buildings;Plain Cement concrete (1:4:8)prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges, seigniorage charges using concrete mixer etc complete. For Portico columns

0.66

-

4038

... More
Buildings;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH For Columns

17.64

-

2010

... More
Buildings;Supplying and fixing aluminium composite cladding with skin material 0.25 mm thick aluminium sheet cover material natural polyethylene aluminium cladding panel fixed with extruded aluminium basis frame (50x25x1.5mm) angle cleats, weather sealants, rivets, GI brackets all as approved, using suitable bolts on structural steel work including necessary accessories complete in all respects including labour charges etc., complete for finished item of work but excluding cost of structural steel fabrication, scaffolding charges, if any, ACP Cladding - 3 mm thick

250

-

712650

... More
Buildings;Providing impervious coat to exposed RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like sand, water proofing compound, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including providing 4" coving with cement concrete in (1:2:4) prop. rounding off the wall and slab junction etc., complete for finished item of work. (APSS No. 901 & 903) for:-Impervious coat CM(1:3), 20mm

185.59

-

107497

... More
Buildings;Supply and Transportation and fixing of INVERTER Model Cool type split AC unit with high wall mounted Single Split 100% copper indoor and outdoor condensing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing Heat cool dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 4 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with warranty of compressor for 5 years including Servicing)(1.5 TR 5 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410 (Makes : Daikin / Toshibha / Carrier / Blue Star / Hitachi or equivalent)

4

-

237751

... More
Buildings;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using FlyAsh bricks 290 x 112/100 x 140 mm having a crushing strength of not less than 50.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509 For Parapet wall

5.6

-

47616

... More
Buildings;Cost of steel and its fabrication charges incl., bending, cost of binding wire etc., complete as per standard specification @100 kg/cum of VRCC for first floor and head room

6.05

-

464746

... More
Buildings;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles of 60 mm x 55 mm x 2.0 mm for outer frames, 70 mm x 60 mm x 2.25 mm for mullion sections as per the need and 102 mm x 60 mm x 2.0 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant and accessories for openable door - hinges of stainless steel grade 304- 3 Nos., per shutter handle with mazak alloy casting 1 No. per shutter, locking system suitably concealed 1 No., with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work. (TBSC-L.III-12) for Head Room

1.47

-

14270

... More
Buildings;Painting to new walls with 2 coats of acrylic emulsion paint weather proof waterbased of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls of head room

35.37

-

9737

... More
Buildings;Painting to new walls with 2 coats of acrylic emulsion paint interior grade of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls of head Room

30.96

-

4338

... More
Buildings;Plastering with CM 2 coats, 20mm thick to brick wall, base coat in CM (1:6) prop. 16mm thick and top coat in CM (1:3) prop. 4mm thick with Dubara sponze finishing including cost & coveyance of all materials, lalbour charges,seign.charges etc.complete.for head room walls

72.17

-

35014

... More
Buildings;Plastering with 12mm thick with sponge finish first coat in CM(1:5) Prop 8mm thick and second coat in CM(1:3) prop 4mm thick including cost and conveyance of all materials and labour charges etc., completefor head room ceiling

21.68

-

10212

... More
Buildings;Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compressive streangth not less than 75 kg/sqm for walls for Superstructure Walls of head room

6.63

-

49526

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges, seign. charges etc.complete.for Head Room Slab

21.68

-

39080

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.for Head room roof beam

1.25

-

18813

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete.For Head Room Column

0.89

-

12423

... More
Buildings;S&F with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black/ premium colours in single piece with edges Rounded and set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm including cost and conveyance of all materials like cement sand, water flooring stones etc. to sitecost of excluding seigniorage, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges etc. complete for finished item of work for Treads & Window Sills & platform tops in the floor (APSS No.701 & 707)Risers

3.3

-

16364

... More
Buildings;S&F with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black/ premium colours in single piece with edges Rounded and set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm including cost and conveyance of all materials like cement sand, water flooring stones etc. to sitecost of excluding seigniorage, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges etc. complete for finished item of work for Treads & Window Sills & platform tops in the floor (APSS No.701 & 707)For Stair case treads

6.6

-

35901

... More
Buildings;Providing Cladding with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black/ premium colours set over base coat of CM (1:3) 20mm thick with Grey cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with cement to full depth (joints of stone should be flushed)including cost and conveyance of all materials like cement, sand, water, etc., to site includingcost of excluding seigniorage on all materials cost of base coat all labour charges like dressing to the required size, mixing of mortar, curing and lift charges including cutting the brick wall to place the stones and redoing the surface smooth complete for finished item of works (APSS No.707 & 701). The skirting should flush online with plastering.

15.05

-

74610

... More
Buildings;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black/ premium colours set over a base coat of CM (1:8) prop. 12mm thick and filling the joints with white cement mixed with pigment of matching shade to match the shade of granite over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, granite slabs, white cement etc., to site (excluding cost of C.C. bed)cost of excluding seigniorage on all materials cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. (APSS No.707 & 701)

61.01

-

331843

... More
Buildings;Supplying and fixing Gyp Board Fine Line Grid false ceiling (GS-FLC-4.6 as per India Gypsum) in size 600 mm x 600 mm using 12.5 mm thick/ 9.5 mm thick Gyp Board sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm conforming to IS 2095 - 1982 fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 12.5 mm / 9.5 mm Gypboard Sheet tiles of size 595 mm x 595 mm or 595 mm x 1195 mm and finishing two coats of drywall topcoat complete for finished item of work as per Idia Gypsum Ltd specification. (BLD-CSTN-8-32)

302.99

-

458513

... More
Buildings;Supply, fabrication and erection of S.S pipe railing (SS 304 grade) with 32 mm dia., vertical posts, 40 mm dia., top hrizontals and 25 mm dia., middle brace horizontals

32.4

-

88253

... More
Buildings;Painting to new walls with 2 coats of acrylic emulsion paint interior grade of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls

421.85

-

59094

... More
Buildings;Painting to new walls with 2 coats of acrylic emulsion paint weather proof waterbased of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for external walls

379.09

-

104363

... More
Buildings;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles of 60 mm x 55 mm x 2.0 mm for outer frames, 70 mm x 60 mm x 2.25 mm for mullion sections as per the need and 102 mm x 60 mm x 2.0 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with TPV Gaskets/ EPDM weathering seal resistant and accessories for openable door - hinges of stainless steel grade 304- 3 Nos., per shutter handle with mazak alloy casting 1 No. per shutter, locking system suitably concealed 1 No., with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing complete for finished item of work. (TBSC-L.III-12)

19.11

-

185506

... More
Buildings;Wall cladding with glazed ceramic tiles of 1 st quality, set over base coat of cement mortar (1:8), 12 mm thick over brick wall, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all material like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work.

31.3

-

18541

... More
Buildings;Flooring with ceramic tiles of 1 st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all material like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work.

8.09

-

7022

... More
Buildings;Flooring with vitrified tiles of 1 st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all material like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work.

132.95

-

228266

... More
Buildings;Providing and appying synthetic plaster putty or equivalent putty such as birla wall care putty or texture paint or equivalent such as NCL/ salcoat texture paint of average 2 to 3 mm thickness over plastered surface to prepare te surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials ,applying emery paper ,sand the surface,clean & wipe off loose dust ,applying putty/texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surfase preparation including cost and conveyance of all materials to work site and all operational, labour charges etc.complete for finished item of work for external wall - including cost of access scaffolding for: providing putty

451.8

-

97425

... More
Buildings;Plastering with CM 2 coats, 20mm thick to brick wall, base coat in CM (1:6) prop. 16mm thick and top coat in CM (1:3) prop. 4mm thick with Dubara sponze finishing including cost & coveyance of all materials, lalbour charges,seign.charges etc.complete.

628.58

-

302182

... More
Buildings;Plastering with 12mm thick with sponge finish first coat in CM(1:5) Prop 8mm thick and second coat in CM(1:3) prop 4mm thick including cost and conveyance of all materials and labour charges etc., complete

182.45

-

84345

... More
Buildings;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using FlyAsh bricks 290 x 112/100 x 140 mm having a crushing strength of not less than 50.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509

16.21

-

134252

... More
Buildings;Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., complete with a compressive streangth not less than 75 kg/sqm for walls for Superstructure Walls.

29.88

-

216456

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges, seign. charges etc.complete.For Sun Shades

3.36

-

4741

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges, seign. charges etc.complete.For Lintels

1.23

-

17605

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges, seign. charges etc.complete.For Steps

0.38

-

6513

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges, seign. charges etc. complete.For Stair Slabs

10.77

-

25839

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges, seign. charges etc. complete. For Slab

157.77

-

280019

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges, seign. charges etc. complete. For Beams

10.36

-

153605

... More
Buildings;VRCC M20 (1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. For column up to first floor beam

6.31

-

86261



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.