Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Works
Civil And Construction
Building Construction
Opening Date15 Oct 2024
Closing Soon22 Oct 2024
Tender Amount₹ 15,95,047 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Health Sub center;Painting to new walls with 2 coats of acrylic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent Plastered Surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding VAT etc, complete for finished item of work as per APSS 912 for external walls.

215.44

246

53147

... More
Construction of Health Sub center;Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding TAXES etc, complete for finished item of work as per SS 911 for internal walls

260.99

220

57517

... More
Construction of Health Sub center;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including over heads & contractor profitcost and conveyance of all materials, and labour charges, incidental such as scaffolding, lift charges but excluding TAXES etc., complete for finished item of work.

85.79

45

3873

... More
Construction of Health Sub center;Supply and fixing of fully panelled Ventilator frame of size 0.60 x 0.30 M with Salwood frame of size 65 x75 mm and incl. all labour charges such as making window frame and shutters and fiXing 2 Nos.of 10 mm square safety bars in to the frame etc,including applying primory coat, cost and conveyance of all materials .

2

767

1535

... More
Construction of Health Sub center;Supply and fixing of Salwood Door Single shutter fully panelled door of size 0.75 x 2.1mt with frame made of well seasoned Sal Wood scantlings of size 75 x 125 mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) - D3 - Frame only

2

4117

8236

... More
Construction of Health Sub center;Supply and fixing of Salwood Door double shutter fully panelled door of size 1.05 x 2.1mt with frame made of well seasoned Sal Wood scantlings of size 100 x 75mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) - D2 - Frame only

4

3676

14707

... More
Construction of Health Sub center;Supply and fixing of Salwood Door double shutter fully panelled door of size 1.50 x 2.10 M with frame made of well seasoned Sal Wood scantlings of size 125 x 175 mm and shutter made of side rails 100mm X 32mm, top rail 100 mm X32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002)-MD - Frame only

1

4562

4562

... More
Construction of Health Sub center;Flooring with vitrified tiles of 1st quality and of size not less than 600 x 600 mm x 8 mm thickness glossy finish permium colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding VAT and seignorage charges.

-

1271

-

... More
Construction of Health Sub center;Ceiling plastering of 12mm thick with CM (1:3) including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding VAT and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for CEILING PLASTERING.

85.79

168

14495

... More
Construction of Health Sub center;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding TAXES and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.

215.44

448

96705

... More
Construction of Health Sub center;Plastering 12mm thick in two coats using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes exceluding GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904).

260.99

434

113403

... More
Construction of Health Sub center;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding GST and seignorage chages.

38.83

7707

299267

... More
Construction of Health Sub center;Plain cement concrete corresponding to (1:3:6) prop mix nominal mix (Cement: fine aggregate: coarse agregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse agregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidential, and labour charges such as mixing, laying and ramming concerete in layers in position not exceeding 15cm finishing top surface curing concrete etc., complete for finished item of work. Bed Blocks

0.23

4471

1028

... More
Construction of Health Sub center;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including over heads & contractor profitcost and conveyance of all materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab but excluding TAXES and seignorage charges etc,, complete for finished item of work

115.66

499

57733

... More
Construction of Health Sub center;100mm thick (platform and lofts)

7.44

1094

8146

... More
Construction of Health Sub center;SUNSHADES of 75mm

13.5

530

7161

... More
Construction of Health Sub center;LINTELS

0.76

10732

8157

... More
Construction of Health Sub center;For Roof Slab with 115mm thick for G.F

115.66

1192

137912

... More
Construction of Health Sub center;ROOF BEAMS

4.81

10426

50153

... More
Construction of Health Sub center;Columns

2.78

11875

33014

... More
Construction of Health Sub center;PLINTH BEAMS

5.01

12539

62823

... More
Construction of Health Sub center;For Pedestals

1.04

10378

10794

... More
Construction of Health Sub center;Supply and placing of the Design Mix Concrete M25 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.-Footings

4.05

9790

39650

... More
Construction of Health Sub center;Supply and filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges,and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

87.66

298

26154

... More
Construction of Health Sub center;Filling with useful available excavated earth ( excluding roxk ) in treanch side of foundations and basmnet with intial lead in ;layers not exceeding 15 CM thick Consolidation each deposited layers by watering and ramming including all Charges etc,

6.8

32

219

... More
Construction of Health Sub center;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding TAXES and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615) (BLD-CSTN-6-12)

30.02

4476

134391

... More
Construction of Health Sub center;Plain Cement Concrete of (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding TAXES & seigniorage charges, sales & other taxes on all materials, for finished item of work for Foundations (APSS No. 402).

13.64

3937

53704

... More
Construction of Health Sub center;Plain Cement Concrete of (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding TAXES & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).

2.28

4711

10743

... More
Construction of Health Sub center;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and TAXES etc., complete, for Ordinary Soil-Manual Means-Upto 3 m depth.

47.47

394

18724



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.