Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Civil And Construction
Civil Works Others
Other Consultancy Services
Other Services
Consultancy Services
Opening Date3 Oct 2022
Closing Date13 Oct 2022
Tender Amount₹ 43,87,819 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
implementation of rr scheme;Supply and Delivery of 50mm dia Non Return Valve

1

-

1450

... More
implementation of rr scheme;Supply and Delivery of 50mm dia Clampset & Nut bolts

2

-

740

... More
implementation of rr scheme;Supply & Delivery of 60/50mm dia uPVC Pipes including all taxes & duties etc. complete.

150

-

42750

... More
implementation of rr scheme;Supply and delivery of PVC / XLPE Insulated Sheathed Multi Core Bright Annealed Bare Copper Conductor Heavy Duty Industrial Cables for Voltage Grade up to 1100 Volts as per IS: 694:1990 including all transportation charges etc complete. Makes : Finolex / RR kabel / Havells / Polycab / RPG / KEI / Gloster / V-Guard

150

-

18900

... More
implementation of rr scheme;Supply and Delivery of of 50mm dia SS Nipple

2

-

916

... More
implementation of rr scheme;Supply and Transportation of control panel for three phase submersible motors up to 5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK /BCH/ SIEMENS / CROMPTON make, 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor, suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc., complete.

1

-

10938

... More
implementation of rr scheme;Manufacture, Supply, delivery of submersible Pumpset suitable to 150mm dia Borewells coupled with motor Single phase 2880 RPM 340V(-15%+10% range-290 to 375 Volts) of reputed make with minimum overall efficiency of 40% at the duty point with Radial including cost and conveyance of material, all taxes surcharges, Sale tax, Exice duty, TOT, Over head charges & Transporting charges etc., The Pumpset should confirm to IS 8034:1989 and Motor should confirm to IS 9283:1979 with ISI/ISO 2000 mark with a guarantee period of 18 months from the date of installation.

1

-

34873

... More
implementation of rr scheme;Supply & Fixing of 180mm dia 6Kg/cm2 UPVC Casing pipes for borewells for potable water supply conforming to IS 12818-1992 as amended from time to time including transportation, QC inspection etc complete

120

-

86847.6

... More
implementation of rr scheme;Drilling of borewell by down the hole hammer (DTH) drilling to the finished diameter of 163 mm (6 1/2") in all formations to the depth as specified and reaming the bore to the required dia, flusing the bore walls at an average pressure of 7 kg/Sqcm (100 PSI), conducting yield test, inclusive of transportation from point to point, crew charges, consumables, shifting of ring and all other charges etc., complete. The borewell should be true & Vertical and work should be carried out to the amendments if any from time to time.

120

-

60670.8

... More
implementation of rr scheme;Supply and placing of the Nominal MIX using 20mm size for construction of CC blocks including cost and conveyance of all materials like cement, for M-20 grade

147

-

41307

... More
implementation of rr scheme;Fixing of Saddles, FCV's, GI Pipe, Bib Taps and MDPE including lowering, laying and jointing including earth work excavation and refilling the pipe line trench after laying the pipe line

147

-

73719.03

... More
implementation of rr scheme;Supply and delivery of 15mm dia House service connection as per standard specification including the cost of the materials like Clamp Saddle/ Electro fusion Saddle confirming to prEN 12201-3, Manufactured from virgin resin of PE-SO/PE-100 with FLOW CONTROL VALVE (5 LPM @5m head), Compression Elbows, MDPE PESO Blue Pipe & Supplying and and including cost of 15mm dia meter brass body CP finish bib tap of BIS standard etc including GI verticals complete for finished item of work

12

-

19687.2

... More
implementation of rr scheme;Supply and delivery of 15mm dia House service connection as per standard specification including the cost of the materials like Clamp Saddle/ Electro fusion Saddle confirming to prEN 12201-3, Manufactured from virgin resin of PE-SO/PE-100 with FLOW CONTROL VALVE (5 LPM @5m head), Compression Elbows, MDPE PESO Blue Pipe & Supplying and and including cost of 15mm dia meter brass body CP finish bib tap of BIS standard etc including GI verticals complete for finished item of work

10

-

16406

... More
implementation of rr scheme;Supply and delivery of 15mm dia House service connection as per standard specification including the cost of the materials like Clamp Saddle/ Electro fusion Saddle confirming to prEN 12201-3, Manufactured from virgin resin of PE-SO/PE-100 with FLOW CONTROL VALVE (5 LPM @5m head), Compression Elbows, MDPE PESO Blue Pipe & Supplying and and including cost of 15mm dia meter brass body CP finish bib tap of BIS standard etc including GI verticals complete for finished item of work

25

-

40674.25

... More
implementation of rr scheme;Supply and delivery of 15mm dia House service connection as per standard specification including the cost of the materials like Clamp Saddle/ Electro fusion Saddle confirming to prEN 12201-3, Manufactured from virgin resin of PE-SO/PE-100 with FLOW CONTROL VALVE (5 LPM @5m head), Compression Elbows, MDPE PESO Blue Pipe & Supplying and and including cost of 15mm dia meter brass body CP finish bib tap of BIS standard etc including GI verticals complete for finished item of work

100

-

162924

... More
implementation of rr scheme;Fixing of DI D/F Gate valves ( soft Seated ) by Jointing DI Specials to suit the pressure class of pipe and constuction of RCC valve chambers as per requirement with VRCC side walls,slab and RCC manhole cover with locking arrangements including cost conveyence of all materials for construction of valve chamber and Jointing materials, and labour charges etc. complete for finished item of work but excluding cost of DI D/F Gate valves(soft Seated) its CED, as specified in Technical specifications.but including seignoarge charges ,cost of specials & Contractors profit but excluding VAT, labour cess , NAC income tax , QC etc

6

-

115075.98

... More
implementation of rr scheme;Construction of pipe line for water supply with HDPE pipes as per IS:4985/1988,with its amendments and revisons thereon including lowering, laying and jointing of pipe lines true to alighnment and gradient, trench excavtion for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removeing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost,conveyance of all materials and labour charges for finished item of pipe line work and Excluding all Taxes.

2000

-

473960

... More
implementation of rr scheme;Construction of pipe line for water supply with PVC pipes as per IS:4984/1988,with its amendments and revisons thereon including lowering, laying and jointing of pipe lines true to alighnment and gradient, trench excavtion for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removeing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost,conveyance of all materials and labour charges for finished item of pipe line work and Excluding all Taxes.

20

-

4247.8

... More
implementation of rr scheme;Construction of pipe line for water supply with PVC pipes as per IS:4984/1988,with its amendments and revisons thereon including lowering, laying and jointing of pipe lines true to alighnment and gradient, trench excavtion for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removeing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost,conveyance of all materials and labour charges for finished item of pipe line work and Excluding all Taxes.

43

-

9027.85

... More
implementation of rr scheme;Construction of pipe line for water supply with PVC pipes as per IS:4984/1988,with its amendments and revisons thereon including lowering, laying and jointing of pipe lines true to alighnment and gradient, trench excavtion for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removeing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost,conveyance of all materials and labour charges for finished item of pipe line work and Excluding all Taxes.

248

-

51261.6

... More
implementation of rr scheme;Construction of pipe line for water supply with PVC pipes as per IS:4984/1988,with its amendments and revisons thereon including lowering, laying and jointing of pipe lines true to alighnment and gradient, trench excavtion for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removeing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost,conveyance of all materials and labour charges for finished item of pipe line work and Excluding all Taxes.

232

-

47390.64

... More
implementation of rr scheme;Construction of pipe line for water supply with PVC pipes as per IS:4984/1988,with its amendments and revisons thereon including lowering, laying and jointing of pipe lines true to alighnment and gradient, trench excavtion for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removeing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost,conveyance of all materials and labour charges for finished item of pipe line work and Excluding all Taxes.

1325

-

268060.75

... More
implementation of rr scheme;Supply and delivery and DI D/F Gate valves ( soft Seated ) valves conforming to IS 3896-oart 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vacuum tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder caoting both insisde and outside pockets body passages.Drilled as per IS: 1538

6

-

67083.9

... More
implementation of rr scheme;Supply and Deleviery of Pipe line as per IS:4985/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.

2000

-

287740

... More
implementation of rr scheme;Supply and Deleviery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.

20

-

6829.8

... More
implementation of rr scheme;Supply and Deleviery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.

43

-

11470.25

... More
implementation of rr scheme;Supply and Deleviery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.

248

-

45909.76

... More
implementation of rr scheme;Supply and Deleviery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.

232

-

29610.16

... More
implementation of rr scheme;Supply and Deleviery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.

1325

-

123397.25

... More
implementation of rr scheme;DI D/F Gate valves ( soft Seated ) valves conforming to IS 3896-oart 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vacuum tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder caoting both insisde and outside pockets body passages.Drilled as per IS: 1538

1

-

23221.26

... More
implementation of rr scheme;DI D/F Gate valves ( soft Seated ) valves conforming to IS 3896-oart 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vacuum tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder caoting both insisde and outside pockets body passages.Drilled as per IS: 1538

2

-

29497.18

... More
implementation of rr scheme;Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) ( ex-works) Excluding Transportation and Taxes.

1

-

3697.81

... More
implementation of rr scheme;Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) ( ex-works) Excluding Transportation and Taxes.

1

-

1231.21

... More
implementation of rr scheme;Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) ( ex-works) Excluding Transportation and Taxes.

2

-

1765.5

... More
implementation of rr scheme;Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) ( ex-works) Excluding Transportation and Taxes.

1

-

4181.46

... More
implementation of rr scheme;Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) ( ex-works) Excluding Transportation and Taxes.

4

-

9338.6

... More
implementation of rr scheme;Centrifugally cast (Spun) Ductile Iron pressure pipes with flanged (welded) ends for water, gas, sewage conforming to IS: 8329/2000 in standard working lengths of 1,2,3, 4, 5 mts for classification K9 with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, excluding transportation & taxes

1

-

5244.71

... More
implementation of rr scheme;Centrifugally cast (Spun) Ductile Iron pressure pipes with flanged (welded) ends for water, gas, sewage conforming to IS: 8329/2000 in standard working lengths of 1,2,3, 4, 5 mts for classification K9 with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, excluding transportation & taxes

10

-

37177.8

... More
implementation of rr scheme;Centrifugally cast (Spun) Ductile Iron pressure pipes with flanged (welded) ends for water, gas, sewage conforming to IS: 8329/2000 in standard working lengths of 1,2,3, 4, 5 mts for classification K9 with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, excluding transportation & taxes

6

-

43346.52

... More
implementation of rr scheme;Centrifugally cast (Spun) Ductile Iron pressure pipes with flanged (welded) ends for water, gas, sewage conforming to IS: 8329/2000 in standard working lengths of 1,2,3, 4, 5 mts for classification K9 with cement mortar lining inside the pipes with outside zinc coating. Rates are ex-factory, excluding transportation & taxes

20

-

101951.4

... More
implementation of rr scheme;Supply and Delivery of 5/8" dia. And 3" long Nuts and Bolts and rubber gasket including loading , unloading and transportation to site etc., complete. Including contractors profit-dia 150mm

9

-

2524.95

... More
implementation of rr scheme;Supply and Delivery of 5/8" dia. And 3" long Nuts and Bolts and rubber gasket including loading , unloading and transportation to site etc., complete. Including contractors profit-dia 100mm

35

-

5609.8

... More
implementation of rr scheme;Constuction of RCC valve chambers as per requirement with VRCC side walls,slab and RCC manhole cover with locking arrangements including cost conveyence of all materials for construction of valve chamber and Jointing materials, and labour charges etc. complete for finished item of work but excluding cost of DI D/F Gate valves(soft Seated) its CED, as specified in Technical specifications.but including seignoarge charges ,cost of specials & Contractors profit but excluding VAT, labour cess , NAC income tax , QC etc

3

-

43119

... More
implementation of rr scheme;Construction of RCC OHSR of Capacity with 12 metre staging with raft foundation using M 30 grade of concrete and Fe 500/500D/550D grade steel as per approved designs and drawings.Side walls of OHSR shall be plastered with CM(1:1.5) prop. 12mm thick and shall be painted with epoxy paint in three coats including roof.Out side of the structure shall be painted with snowcem paint two coats of approved quality paint over primary coat. The rate including cost, conveyance of cement conforming to IS 269 1976 and steel confirming to IS 1786-1979 to site and fabrication charges of steel etc,fixing of following items.NOTE: -1) For intermediate ranges proportional rates may be adopted. All VRCC shall be in M30 grade design mix.2) Rate inclusive of three coates of food grade epoxy paint to inner surface of the reservoir including roof dome.3) The above rates be adopted for estimate purposes for construction of ELSR for a finished work including 2 coats of wheather proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends, valves etc., for pipe connections but excluding cost of pipes,bends and valves as per departmental designs and drawings.4) Fixtures include :a) RCC or Aluminium ladder inside 0.60 m wide.b) spiral staircase on the outside shall be provided upto 200KL ELSR. Above 200KL ELSR Capacity dog legged staircase shall be provided with staircase flight width of 1.0mts and landing width of 1.20mts with S.S railing upto 1.0 height.c) Lightening arrestor, including conductor and earthing etc with relevant IS codes.d) RCC ventilators with copper or stainless steel fly proof mesh.e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications (light duty) - 2 Nos.f) Water level indicator of good quality with ebonite/ copper float approved pattern - 1 No.g) The ladder shall be with Aluminium and Verticals with HDPE of 10kg/Sqcm shall be provided for single column OHSRs only. h) Minimum staging for all ELSR/OHSR shall be 12.0mts.i) The increase in staging shall be at 1.0mt interval.j) The railing provided to the gallery and staircase shall be with stainless steel of grade 304 for a height of 1mtsk)The railing provided to the gallery and stair case shall be with stainless steel of grade 304 for a height of 1.20mts.l)The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side with PVC door of standard maker up to 1st brace level from ground level to prevent unauthorized entry.m) D.I swan neck ventilators shall be provided in top dome and slab.n) The above rates are exclusive of all inlet, outlet connection and valves. All valves near inlet, out let and for scour of ELSRs shall be D.I valves.

40000

-

1916400



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.