Mission Bhagiratha Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 12,466Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
550511Tender No
22/SE/MB Nlgd/2024-25, Dt: 05-10-2024Tender Authority
Mission Bhagiratha Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Secondary grid line Construction, extension of PVC pipeline, HHC;Construction of pipelines for water supply with PVC 6kg/cm2 pipeline as per IS 4984:1995 with its amendments and revisions thereon and including supplying of pipes,necessary specials such as bends, Tees, etc as per site requirements, lowering, laying and jointing of pipes (with butt fusion welding) true to alignment and gradient, excavation of Pipeline trench (Earthwork excavation in all soils upto SDR using machine rate for 2/3rd and manual rate for 1/3rd of quantity) of pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils, boulders and BC Soils) with watering and tamping and removing surplus earth from site of work and filling pipeline with water and testing to the required pressure etc., complete., The rates are inclusive of cost and conveyance of all materials and labour charges and all incidental and operational charges for finished item of pipeline work, but excluding CED and other taxes. The work shall be executed based on the approved designs and drawings of the department. of 180mm dia
20
310
6212
Secondary grid line Construction, extension of PVC pipeline, HHC;Construction of pipelines for water supply with PVC 6kg/cm2 pipeline as per IS 4984:1995 with its amendments and revisions thereon and including supplying of pipes,necessary specials such as bends, Tees, etc as per site requirements, lowering, laying and jointing of pipes (with butt fusion welding) true to alignment and gradient, excavation of Pipeline trench (Earthwork excavation in all soils upto SDR using machine rate for 2/3rd and manual rate for 1/3rd of quantity) of pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils, boulders and BC Soils) with watering and tamping and removing surplus earth from site of work and filling pipeline with water and testing to the required pressure etc., complete., The rates are inclusive of cost and conveyance of all materials and labour charges and all incidental and operational charges for finished item of pipeline work, but excluding CED and other taxes. The work shall be executed based on the approved designs and drawings of the department. of 75 mm dia
30
228
6857
Secondary grid line Construction, extension of PVC pipeline, HHC;Construction of pipelines for water supply with PVC 6kg/cm2 pipeline as per IS 4984:1995 with its amendments and revisions thereon and including supplying of pipes,necessary specials such as bends, Tees, etc as per site requirements, lowering, laying and jointing of pipes (with butt fusion welding) true to alignment and gradient, excavation of Pipeline trench (Earthwork excavation in all soils upto SDR using machine rate for 2/3rd and manual rate for 1/3rd of quantity) of pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils, boulders and BC Soils) with watering and tamping and removing surplus earth from site of work and filling pipeline with water and testing to the required pressure etc., complete., The rates are inclusive of cost and conveyance of all materials and labour charges and all incidental and operational charges for finished item of pipeline work, but excluding CED and other taxes. The work shall be executed based on the approved designs and drawings of the department. of 160mm dia
260
304
79245
Secondary grid line Construction, extension of PVC pipeline, HHC;Fixing of DI D/F Air Valve and including DI Specials , jointing materials etc, Lowering and fixing of DI D/FDouble Air Valve arrangment suitable for working pressure upto 10 kg/cm2 (Kinetic air Valve with isolated valve for 200mm & above) on pipe line including fixing of MS Caze around the air valve but excluding supply of Air valve of 50mm dia on 110mm dia HDPE pipeline
1
28443
28444
Secondary grid line Construction, extension of PVC pipeline, HHC;Fixing of DI Sluice Valve and including DI Specials , jointing materials etc, Lowering and fixing of DI D/FDouble Sluice Valve arrangment suitable for working pressure upto 10 kg/cm2 on pipe line including construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc.complete of 250mm dia DI D/F sluice valve on 250mm dia DI pipeline
1
32447
32447
Secondary grid line Construction, extension of PVC pipeline, HHC;Fixing of DI Sluice Valve and including DI Specials , jointing materials etc, Lowering and fixing of DI D/FDouble Sluice Valve arrangment suitable for working pressure upto 10 kg/cm2 on pipe line including construction of RCC valve chambers as per requirement with RCC slab and RCC manhole cover with locking arrangements etc.complete of 100mm dia DI D/F sluice valve on 110mm dia HDPE pipeline
1
24796
24797
Secondary grid line Construction, extension of PVC pipeline, HHC;Construction of pipelines for water supply with HDPE PE-100 grade pipes 8 Kg/cm2 as per IS 4984:1995 with its amendments and revisions thereon and including supplying of pipes,necessary specials such as bends, Tees, etc as per site requirements, lowering, laying and jointing of pipes (with butt fusion welding) true to alignment and gradient, excavation of Pipeline trench (Earthwork excavation in all soils upto SDR using machine rate for 2/3rd and manual rate for 1/3rd of quantity) of pipelines in all soils except rock requiring blasting and refilling trenches with excavated earth (other than rocky soils, boulders and BC Soils) with watering and tamping and removing surplus earth from site of work and filling pipeline with water and testing to the required pressure etc., complete., The rates are inclusive of cost and conveyance of all materials and labour charges and all incidental and operational charges for finished item of pipeline work, but excluding CED and other taxes. The work shall be executed based on the approved designs and drawings of the department. of 110mm dia 6kg/cm2
1016
295
300706
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery of DI D/F Gate valves ( soft Seated ) valves conforming to IS 3896-part 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vacuum tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder caoting both insisde and outside pockets body passages.Drilled as per IS: 1538
1
23354
23355
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.
30
139
4192
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.
260
621
161583
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery of Pipe line as per IS:4984/1988,with its amendments and revisons thereon including supplying of pipes, specials as per equirements Excluding all Taxes.
20
798
15974
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG 50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the dept and including Cost and supply of DI D/F bewel geared Isolaated sluice valve confirming to IS 3986 part - 2 1985 etc, Transporattation charges @5%. On HDPE Pipeline.
1
36677
36677
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery and DI D/F Gate Valves (Soft Seated) valves conforming to IS 3896 part 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vaccume tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder coating both inside and outside pockets body passages. Drilled as per IS: 1538 on DI pipeline
1
53752
53752
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery and DI D/F Gate Valves (Soft Seated) valves conforming to IS 3896 part 2-1985 wedge fully rubber lined with EPDM food grade quality and the valve should be of vaccume tight and 100% leak proof with face to face dimensions. All the valves should be with Electrostatic powder coating both inside and outside pockets body passages. Drilled as per IS: 1538 on HDPE pipeline
1
14833
14833
Secondary grid line Construction, extension of PVC pipeline, HHC;Supply and Delivery of pipeline as per IS 4984/1988, with its amendments and revisions thereon including supplying of pipes, specials as per requirements excluding all taxes including contractors profit 13.65%
1016
403
409787