Mission Bhagiratha Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Works
Civil And Construction
Building Construction
Opening Date3 Oct 2023
Closing Date9 Oct 2023
Tender Amount₹ 27,23,799 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Gas Chlorination System;Earth work excavation in all type of soils 'with intial lead and lift etc., completeEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ordianry gravelly soils for foundations.

35.93

219

7883

... More
Gas Chlorination System;Cement concrete (1:4:8) prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete.

4.11

5763

23693

... More
Gas Chlorination System;Construction of Randam rubble stone masonry in CM(1:6) 2nd sort including cost and conveyance of all materials and labour charges ,seigniorage charges etc complete.

12.15

5412

65765

... More
Gas Chlorination System;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement but excluding steel, for M-30 grade. Footing

-

10351

55897

... More
Gas Chlorination System;For Columns upto Plinth Beam

0.81

13310

10781

... More
Gas Chlorination System;Plinth beam Long walls

1.44

14472

20840

... More
Gas Chlorination System;Plinth beam Short walls

1.44

14472

20840

... More
Gas Chlorination System;Columns upto slab level

3.32

13310

44203

... More
Gas Chlorination System;Allthrogh beam at Lintel Level long walls

1.08

14472

15630

... More
Gas Chlorination System;Allthrogh beam at Lintel Level short walls

1.08

14472

15630

... More
Gas Chlorination System;Deduction of column area

-2.16

14472

-31260

... More
Gas Chlorination System;Top beams Long walls

0.9

14472

13025

... More
Gas Chlorination System;Top beams Short walls

0.9

14472

13025

... More
Gas Chlorination System;Slab 150mm thick

29.25

19118

55922

... More
Gas Chlorination System;Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete.

18

7865

141548

... More
Gas Chlorination System;Plastering with 12mm thick with sponge finish first coat in CM(1:5) Prop 8mm thick and second coat in CM(1:3) prop 4mm thick including cost and conveyance of all materials and labour charges etc., complete

135

4240

57086

... More
Gas Chlorination System;Supply and placing of Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance of all materials and labour charges ,seign. charges etc.complete. For Flooring

0.58

2080

1200

... More
Gas Chlorination System;Supply and Placing of HYSD bars, fabrication including cost and conveyance of all materials and labour charges etc completed.

2

75558

15112

... More
Gas Chlorination System;Snowcem paint two coats including cost and conveyence of all materials and labour charges etc.comp

53

1519

8053

... More
Gas Chlorination System;White washing with white cement two coats including cost and conveyance of all materials and labour charges etc complete.

96.9

443

4295

... More
Gas Chlorination System;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108 DOOR SHUTTER

4

5079

20318

... More
Gas Chlorination System;Providing MS arrangement for Mono rail Single Girder Crane including Supplying & cost of structural steel including fabrication charges, erection & fixing in position including C/C of all material, labour charges etc complete. ISMB 200 -Single joist with additional plates (160 x 10 mm) for both flanges (Girders), ISMB 200 @ supports @ at 0.5 m spacing

486

151

73630

... More
Gas Chlorination System;Earth work excavation in all type of soils 'with intial lead and lift etc., completeEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ordianry gravelly soils for foundations.

62.51

219

13716

... More
Gas Chlorination System;Cement concrete (1:4:8) prop using 40 mm gauge HG metal including cost &conveyance of all materials and labour charges ,seigniorage charges using concret mixer etc complete.

9.14

5763

52704

... More
Gas Chlorination System;Construction of Randam rubble stone masonry in CM(1:6) 2nd sort including cost and conveyance of all materials and labour charges ,seigniorage charges etc complete.

9.85

5412

53294

... More
Gas Chlorination System;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement but excluding steel, for M-30 grade. Footing

3.4

10351

35215

... More
Gas Chlorination System;For Columns upto Plinth Beam

0.94

13310

12578

... More
Gas Chlorination System;RCC Plinth beam

5.49

14472

79454

... More
Gas Chlorination System;Deduction of Columns

-0.57

14472

-8206

... More
Gas Chlorination System;Columns above Plinth Beam

3.4

13310

45281

... More
Gas Chlorination System;Construction of super stucture with brick masonary in (1:6) using 2nd class bricks including cost and conveyance of all materials,labour charges and seign. charges etc. complete.

17.8

7865

140299

... More
Gas Chlorination System;Plastering with 12mm thick with sponge finish first coat in CM(1:5) Prop 8mm thick and second coat in CM(1:3) prop 4mm thick including cost and conveyance of all materials and labour charges etc., complete

183

4240

77568

... More
Gas Chlorination System;Supply and Placing of HYSD bars, fabrication including cost and conveyance of all materials and labour charges etc completed.

2

75558

15112

... More
Gas Chlorination System;Snowcem paint two coats including cost and conveyence of all materials and labour charges etc.comp

234

1519

35622

... More
Gas Chlorination System;Supply & Fixing of MS Gate with all fixtures, fasteners including cost and conveyance of all materials and labour charges etc., complete

1

13018

13018



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.