For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Mission Bhagiratha Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date17 Jan 2024
Closing Date22 Jan 2024
Tender Amount₹ 26,45,277 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, for M-30 grade (for Clariflocculator)

0.63

11333

7129

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Plastering with CM(1:5) prop 12mm thick to brick wall including cost&coveyance of all materials, lalbour charges,seign.charges etc.complete. (for Clariflocculator)

12.57

1546

1944

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108 (for Chemical House)

9

5079

45715

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Chipping and scarifying the existing DPC/ plum concrete surface or impervious surface up to 50 mm thick to expose the virgin surface of the concrete using low/ medium vibratory chipping machine as a part of structural repair/retrofitting including cost and conveyance of all materials and labour charges etc. complete. (for Filter Beds)

50

27

1383

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, for M-30 grade (for Filter Beds)

5.56

10963

60958

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Plastering with CM(1:5) prop 12mm thick to brick wall including cost&coveyance of all materials, lalbour charges,seign.charges etc.complete.(for Filter Beds)

18

1546

2784

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply, Transportation and Installation of 3 HP Three phase open well ISI submersible motor pumpset incl cost, conveyance of all materials labour Charges etc.. Complete for finished Item of Works (for Filter Beds)

2

32962

65924

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply, Transportation, laying, testing & commissioning of 'B' class heavy duty GI pipe conforming to IS 3589/IS 1239 including Welding, fittings like elbows,tees, flanges, tapers, nuts bolts, gaskets etc. and fixing the pipe on the wall/ceiling with suitable clamp/support frame and painting with two or more coats of synthetic enamel paint of required shade complete as required etc.c complete (for Filter Beds)

25

1107

27682

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);supply, erection of 3 core 2.5 Sqmm flat copper cable of ISI for submersible motors for dewatering motors (for Filter Beds)

60

123

7408

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, for M-30 grade

1.9

9054

17204

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Cutting of Cement concrete by grinding including cost and conveyance of all materials and labour charges etc. complete.(for Pump house)

4.19

2604

10915

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Manufacture and supply of Dewatering pump 5 HP Diesel including allmaterials etc.complete (for Pump house)

1

43969

43969

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Chipping and scarifying the existing DPC/ plum concrete surface or impervious surface up to 50 mm thick to expose the virgin surface of the concrete using low/ medium vibratory chipping machine as a part of structural repair/retrofitting including cost and conveyance of all materials and labour charges etc. complete. (for 1100KL Clear water sump)

13.45

27

372

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, for M-30 grade (for 1100KL Clear water sump)

26.89

7235

194560

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Providing and filling murum/ gravely soil (CNS soil) for foundation or above pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power roller to achieve density control of not less than 98 present etc.complete with lead upto 50 m and all lift (for 1100KL Clear water sump)

181.03

475

86068

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Cutting of Cement concrete by grinding including cost and conveyance of all materials and labour charges etc. complete. (for 40KL OHBR)

2.83

1470

4161

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Flooring with CM(1:3) prop 20 mm thick over bed of 100 mm thick,CC (1:4:8) prop using 40mm HG metal including cost and conveyance of all materials and seignorage charges etc., complete. (for 40KL OHBR)

28.29

7711

21812

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Painting with Synthetic Enamel paints - Two Coats - For new Iron Work over a primer coat of Red Oxide primer (for 40KL OHBR)

100

163

16381

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Cutting of Cement concrete by grinding including cost and conveyance of all materials and labour charges etc. complete. (for 150KL OHBR)

5.03

1470

7397

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Flooring with CM(1:3) prop 20 mm thick over bed of 100 mm thick,CC (1:4:8) prop using 40mm HG metal including cost and conveyance of all materials and seignorage charges etc., complete.(for 150KL OHBR)

50.29

7711

38776

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (for Security Room)

13.88

119

1660

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);CC(1:4:8)using 40 mm HBG metal icluding Cost and conveyance of the all materials etc complete.(for Security Room)

1.26

5123

6466

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);VRCC M-25 using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Columns footing(for Security Room)

2.03

10198

20683

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);VRCC M25 using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Columns Below GL and Above GL (for Security Room)

0.89

13138

11667

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);VRCC M25 using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Plinth Beams (for Security Room)

1.03

10962

11281

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);VCC M25 using 20 mm HBG metal including cost and conveyance of all the materials etc complete for Roof Beam (for Security Room)

0.7

12399

8643

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);VRCC M-25 using 20 mm HBG metal including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Roof Slab with125 mm Thick (for Security Room)

2.57

11903

30567

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.(for Security Room)

5

75636

378182

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Brick Msaonary with CM(1:6) using Second Class Bricks including cost and conveyance of all the materials etc complete (for Security Room)

7.78

8977

69870

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Cement plastering with CM(1:5),12mm thick including cost and conveyance of all the materials ect complete. (for Security Room)

103.54

1546

16013

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Flooring with CC(1:4:8) using 40mm HBG metal for 100mm thick and Top plastering with CM(1:3) ,20mm thick including cost and conveyance of all the materials ect complete.(for Security Room)

12

7711

9253

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Snowcem painting 2coats over primary coat including cost and conveyance of all the materials ect complete.(for Security Room)

97.81

1464

14326

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Providing and fixing 2 Track 2 glass shutter sliding Windows fabricated from roll formed sections made of Galvanized Steel Colour Coated/ Powder Coated (Base Steel as per IS 513 ?D? quality, Galvanized as per IS 277 with Zinc of 120 GM/Sq.mtr) with total coated thickness of 0.58 mm. Primer coat with epoxy primer of 5?7 micron thick, finish painted with polyester paint of 12-16 microns thick and back coated with alkyd backer of 5-7 microns or Powder Coated with pure Polyester Powderup to 50-60 microns thick. Section for external frame be of 35 x 49 mm Section for euro groove should be 25 x 24mm( Aluminium/Plastic)and Lap Strip should be of 30 x 41mm(Aluminium/Plastic).shutter should be provided with a glass of 5mm Plain Float Glass. Corner bracket for External frame made of Steel/Polypropylene, Corner Bracket for Internal frame made of Steel/Polypropylene Touch Lock, Rollers, wool pile for lap strip & euro groove, Bump Stop Base & Rubber for shutter stopper. Ethyl Propylene Diamine Monomer (EPDM) Gasket should be used all around glass in shutter. The Frame Section should be cut to length and mitre joined with Corner brackets & Shutter Sections should be cut to length and mitre joined with Corner Bracket. Window Frame should be fixed to brick/ concrete masonry by using Nylon self expanding caps and driving MS electroplated 80mm long screws into the caps through frames.10mm square guard bars with 6? pitch (152.4mm) max to be fixed wall to wall and all taxes complete for finished item of work (for Security Room)

4.5

8338

37522

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Construction of pipe line for water supply with HDPE pipes as per IS:4984:2016, with its amendments and revisions there on including supplying of pipes, specials as per requirements, lowering, laying and jointing of pipe lines true to alignment and gradient , trench excavation for pipe lines in all soils except Rock requiring blasting and refilling trenches with excavated earth(other than rocky soil and boulders) with watering, tamping and removing surplus earth from site of work and filling pipe line with water and testing etc., complete. The rates are inclusive of cost, conveyance of all materials and labour charges for finished item of pipe line work and excluding all Taxes. 75mm dia 6kg/cm2 (for Pipe Line)

700

373

261154

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538, including Cost of DI valve and Specials, dismantling joint to suit the pressure class of pipe, construction of RCC valve chambers as per requirement with R CC slab and RCC manhole cover with locking arrangements etc.complete. The rates are inclusive of cost and conveyance of all materials and labour charges Excluding all Taxes. 80mm dia Sluice Valve

1

43566

43567

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Manufacture, Supply and delivery of DI D/F Air Valves (Soft Seated) Resilient seated soft sealing Air valves (Air valves) with body bonnet of ductile cast iron of grade GGG40/ SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538, including Cost of DI valve and Specials, dismantling joint to suit the pressure class of pipe, construction of guageprotection to air valves as per requirement with ms sections with locking arrangements etc.complete. The rates are inclusive of cost and conveyance of all materials and labour charges Excluding all Taxes.50mm dia air valve

1

63391

63392

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Brick Msaonary with CM(1:6) using Second Class Bricks including cost and conveyance of all the materials etc complete (for Transformer Yard)

7.2

8977

64636

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply, placing of 40mm HBG metal including cost and conveyance charges of all materials and labour charges etc complete including CP(for Transformer Yard)

24

2065

49582

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);supply and Fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge including cost of material, labour, conveyance cost etc, complete for finished item of work. (for Transformer Yard)

60

667

40021

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Cost,Supply and Fabrication charges of MS channels incl cost, conveyance of all materials labour Charges etc.. Complete for finished Item of Works (for Transformer Yard)

308

871

268388

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply & Transportation of Split AC unit With high Wall Mounted 100% Copper indoor unit and out Door Condensing Unit hermetically sealed compressor suitable for Operation on 230v ,50Hz, 1 Phase AC Supply capable of Performing cooling dehumidifying air circulating & Filtering with Cooling And Condensing units With 3.0m Copper Pipe insulation Kit & 4m To 3core Copper flexible Chord V160-264 Range Remote Control With 2 years Warrenty 7 Annual Maintenance Maintenance contract. (for Furniture Items)

2

47689

95379

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Tables (large Size)

2

37000

74000

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Tables (Small Size)

2

12050

24100

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Plastic Chairs

20

2050

41000

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);PUMPING MACHINARY LT 415 Volts Horizontal Split casing centrifugal pumpFlood proof Pumps Design Manufacturing supply Installingtesting & commissoning of Horizontal Split casing PumpsSubmerged centrifugal pumpFlood proof Pumps of suitable rpm for following duty points as specified below conforming to IS IS 65951IS325IS5120 a. Duty point discharge 1320 LPM b. Duty point head suitable to provide combined discharge at rated head as mentioned below and pump efficiency shall be as per HIS curves and motor efficiency shall not be less than 90%. c. These pumps should be suitable for parallel operation to deliver the required flow of 1320 LPM for 22 HrsDay continuous operation by running 1 pumps and 1 standby pump at Combined Duty point head 40 m and as per relevant specifications for clear water applicationDesign Manufacturesupply erection testing and commissioning of 0.415 kv 15 kW rating 3 Phase 50 Hz Horizontal squirrel cage induction motor of ABB make suitable to the above pump. The motor shall be conforming to IS325IP55IP68Class of protectionTEFCCACATEWC type of enclosure Class F insulation with a temperature rise limited to ClassB and as per the standard specifications.

2

158201

316403

... More
Repairs and replacement works in 9 MLD WTP at Gollabuddaram in Bhupalpally (M);Supply and errecting cast iron foot wall ball type / Flat type of size 100dia with strainer for negetive suction etc complete

2

8304

16610



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.