Ministry Of Road Transport And Highways Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Ministry Of Road Transport And Highways - MORTH Tender
Civil And Construction
Road Construction
Eprocure
Opening Date21 Jul 2022
Closing Date28 Jul 2022
Tender Amount₹ 23,40,65,214
Costs
EMD
₹ 23,40,652Document Cost
₹ 11,800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MoRTH_702002_1Bid Award Id
ViewTender No
07/SE/TS/R and B/MBNR/2022-23/CRF/04, Dt.20.07.202Tender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Construction of embankment with approved material deposited at site from roadway cutting and excavation from drain etc including pre-watering of soil, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of work as per MoRT&H specification 305 (5th revision).( payment will be made based on level for finished item of work) excluding seigiorage charges and GST.
8898
-
152
... More
Construction of embankment with material obtained from borrowed useful earth from outside road boundary with a lead of 5km and soil having MDD of 18 KN/Cum , CBR ≥ 12%, PI 12%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision).excluding seigiorage charges and GST
35640
-
301
... More
Construction of subgrade & earthen shoulders with material obtained from borrowed useful earth from outside road boundary with a lead of 5km and soil having MDD of 18 KN/Cum , CBR ≥ 12%, PI 12%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 408 (5th revision).excluding seignorage charges and GST
18996
-
308
... More
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3 excluding GST.
61056
-
9.4
... More
Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge. excluding seigiorage charges and GST.
14421
-
1854
... More
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work. excluding seigiorage charges and GST.
30952
-
2096
... More
Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.excluding GST.
118720
-
43.3
... More
Providing and applying tack coat with bitumenemulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.excluding GST
118720
-
12.5
... More
Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH batch mix plant using HBG crushed aggregates of Grading – 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, transporting the hot mix to work site, laying with Hydro Static Sensor Paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge (excluding seigniorage charges and GST ).
3562
-
10784
... More
Conducting survey using Network Survey Vehicle to record the minimum parameter in each lane of the road but not limited to the following parameters : (i) Inventory of the road : GPS Coordinates, Pavement Type, Pavement Width, Terrain, Land use, Shoulder type and width, Drain type and width, Median Type and width, Wayside amenities, Crash barrier, Signages etc., (Note: All inventory items shall be recorded on both sides of the road and geo tagged with images) (ii) Condition of the road : Roughness, Rutting, Distress (Cracking, Potholes, Bleeding, Surface failure etc.,) (Note: All inventory items shall be recorded for each lane and Geo tagged). The pavement data collection equipment should (i) automatically measure various pavement defects through 3D profiling at normal highway speeds of up to 100 kmph. The system should have Laser Crack measurement System with geometry and IRI sensors. The system should have DGPS receiver with sub-meter accuracy equipped with inertial navigation system. It should have high resolution Odometer with at least 10000 pulses per revolution of the Tire have Class 3 Roughness device which can be operated at 10 kmph to 100 kmph and capable of measuring 8+ IRI values in very rough, unpaved and wet conditions. System should have at least 3 ROW cameras and /or 360 degree camera. World Bank class 1 portable reference profiler or its equivalent should be available to setup roughness calibration or validation sites. Software should have in-built calibration feature. The system should have office post-processing software for analysis and mobile mapping. The software should be capable of completing preliminary analysis of a day’s data (at least 50 km) in a day by one person. Post processing software integrated with the equipment should give the data output as per user defined Tabular formats covering all the pavement condition/ Road data items expected of a standard Network Survey Vehicle (iii) be able to operate during day and night. It should measure full 4 m width of the road. It should identify lane markings and should automatically adjust position to the user defined locations. The system should use lane tracking feature to remove driver influence. It must include validation tool. Distance resolution should not be more than 1 mm. Distance accuracy should be 0.01% or better. DGPS should have minimum 5 Hz update rate. Geometry unit should have inertial navigation system (gyroscope), 3 axis accelerometer and proximity sensor to give position information from the GPS and should have a built-in test (BIT) feature (iv) System should use at least 2 high accuracy 3D lasers with Inertial Measurement Unit. The lasers should be high speed lasers with speeds of 32 kHz and with 3 axis accelerometers with operating range of 20-100 kmph. 3D Lasers should be capable of measuring transverse profiles with high resolution at a frequency of at least 28000 profiles per second. Data Acquisition System (DAS) should include coordinate conversion feature which allows operators to automatically convert GPS data into any local datum. The system should display Real-time elevation measurements and IRI values during surveys and should be able to automatically calculate IRI over user defined intervals. The data output should be in generic file formats like .MDB, .CSV etc. Data acquisition system should display real-time data and status for all sensors. The system should accurately measure longitudinal and transverse slope. It should detect cracks down to 1mm. Data output should include cracking (longitudinal, transverse, alligator, multiple, sealed cracks, potholes, Rut depth/width/cross-sectional area for each wheel path, Macro texture across whole lane width in 5 AASHTO bands, Raveling, Bleeding, shoving, Curb edge, Concrete joint faulting, water pooling, Geotagged pavement images (in .JPEG format). Output should include Cross fall / slope, Radius of curvature and gradient. Raw data should be supplied in a suitable long lasting storage medium for cross checking at any time.
84
-
4500
... More
Providing Plain Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation (excluding GST and Seignorage charges)
163
-
4833
... More
Vibrated cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100,2702&602 (5th revision) excluding Seignorage Charges, GST, Slip form paver and as directed by the Engineer-in-Charge for C.C Pavement.
616
-
5798
... More
Contraction sawn joint groove (using diamond studded blades) 2 mm wide and 1/3 depth of the Cement Concrete pavement (slab). These grooves shall be cut when the concrete is greenish for finished item of work and as directed by Engineer-in-Charge (Excluding GST)
13123
-
21
... More
Pipe culverts
-
-
-
... More
Dismantling of existing structures like culverts , bridges, retaining walls and other structures comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of unserviceable materials and stacking the materials with all lifts and lead of 1000 m ( By manual means in Cement concrete grade M-15 & M-20) (excludingn GST).
184.1
-
706
... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge. (excluding GST and Seignorage charges)
1942.62
-
116
... More
Providing Plain Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation (excluding GST and Seignorage charges)
160.36
-
4833
... More
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) (excluding GST and Seignorage charges).
1000.27
-
5887
... More
Providing, laying Reinforced cement concrete Hume pipes of 900 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 900mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work. (excluding GST)
145
-
9912
... More
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-4 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work . (excluding GST)
200
-
13170
... More
Filling in between bodywalls with gravel including cost and conveyance of materials to site etc., complete as per drawing and MoRT&H Specification 2900 ( 5th Revision) and as directed by the Engineer-in-Charge excluding seigiorage charges and GST.
528.13
-
650
... More
RSI items
-
-
-
... More
Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORTH Section 803.4 and IRC: 35-2015, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35-2015 and MORTH Section 803.4 (excluding GST)
1800
-
663
... More
Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(HIImpact Polysterene) or ABS or ASA ( Acrylic Strene Acrylonitrite and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 – DO III Dt 11.06. 1997. The height and width shall not exceed 20 mm and 130 mm with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer. (excluding GST)
1684
-
361
... More
Supplying and installation of Hazard Marker using M.S. angle of size 55x55x6mm and 120cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand,colour, with 30cm x 90cm Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium skin on both sides with standard supports consisting of alternately black and Yellow with black stripes in screen printing sloping downward at an angle of 45 degrees towards the side of the obstruction on which the traffic is to pass and buried into the ground in a trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all materials, equipment, machinery and labour with all leads and lifts, loading and un-loading charges necessary for successfull completion of the work on any road in division as directed by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805 and approved drawings etc., complete for finished item of work. (excluding GST)
106
-
4550
... More
Providing and fixing Cautionary/Warning sign boards size 900 mm equilateral triangle made out of Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge. (excluding GST)
82
-
7174
... More
Providing and fixing junction boards of size 1500 x1200mm made of of Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge. (excluding GST)
28
-
30196
... More
Providing & fixing Facility Informatory boards of size 600 x 800 mm made out of Type – IV of ASTMD 4956-09 High Intensity Prismatic Retro reflective sheeting and confirming to IRC 67:2012 for full background of Green Colour & White Letters and fixed over 4MM Aluminium Composite Material sheet having minimum 0.4 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge (excluding GST)
16
-
8460
... More
Supplying, Fixing, painting & figuring of Reinforced cement concrete M15 grade Oridinary Kilometre stone of standard design as per IRC:8-1980, etc including cost and conveyance of all materials and labour charges etc,m complete for finished item of work. (excluding GST)
18
-
2368
... More
Supplying , Fixing, painting & figuring of Reinforced cement concrete M15 grade 5th Kilometre stone of standard design as per IRC:8-1980, etc including cost and conveyance of all materials and labour charges etc,m complete for finished item of work. (excluding GST)
5
-
4033
... More
Supplying, Fixing , painting & figuring of Reinforced cement concrete M15 grade Hectometre stone of standard design as per IRC:8-1980, including cost and conveyance of all materials and labour charges etc,m complete for finished item of work. (excluding GST)
84
-
731
... More
Providing W-Beam metal crash barrier on high embankments
1600
-
2857
... More
Box culverts
-
-
-
... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge ( excluding seigiorage charges and GST )
802.7
-
116
... More
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for levelling course footings (excluding GST and Seignorage charges)
67.7
-
5352
... More
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for foundations ( excluding seigiorage charges and GST.)
289.2
-
5705
... More
Vibrated reinfored cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for substructure( excluding seigiorage charges and GST.)
313.6
-
6049
... More
Vibrated reinfored cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for superstructure( excluding seigiorage charges and GST.)
106.08
-
6571
... More
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified( excluding seigiorage charges and GST.)
153.6
-
4491
... More
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2100 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items ( excluding GST).
21.44
-
98680
... More
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for substructure RCC items (excluding GST).
30.24
-
98927
... More
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2300 (5th revision) and as per I.S.1786 of 1985 for super structure RCC items (excluding GST).
5.4
-
100591
... More
Back filling behind abutments with gravel including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work (excluding seigiorage charges and GST).
406.5
-
650
... More
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.(excluding seigiorage charges and GST)
338
-
1440
... More
Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)
64
-
399
... More
Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes( excluding seigiorage charges and GST.)
67.5
-
1371
... More
Providing and laying boulders apron for bed protection against scour with stone boulders weighing not less than 40kg with 300mm thick each complete as per drawing and specification. complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and as directed by the Engineer-in-Charge (Excluding Seigniarage charges and GST).
256.5
-
1371
... More
Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705 MORTH and as directed by the Engineer-in-Charge (excluding GST )
16
-
1373
... More
Vibrated cement concrete M 15 grade using 40mm, 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for PCC curtain walls
71.3
-
5352
... More
Vibrated cement concrete M 15 grade using 40mm, 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Rigid apron bed
206.2
-
5352
... More
Minor Bridges
-
-
-
... More
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.(Box, Shear key, Return Wall,Curtain walls and Stone appron) ( excluding seigiorage charges and GST )
3532.64
-
127
... More
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for levelling course footings (excluding GST and Seignorage charges)
263.31
-
5862
... More
Vibrated reinforced cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for foundations ( excluding seigiorage charges and GST.)
824.88
-
6351
... More
Vibrated reinfored cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for substructure( excluding seigiorage charges and GST.)
392.16
-
6782
... More
Vibrated reinfored cement concrete M 35 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for superstructure( excluding seigiorage charges and GST.)
771
-
7282
... More
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified( excluding seigiorage charges and GST.)
218.1
-
4919
... More
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2100 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items ( excluding GST).
66
-
108078
... More
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for substructure RCC items (excluding GST).
29.61
-
108349
... More
Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2300 (5th revision) and as per I.S.1786 of 1985 for super structure RCC items (excluding GST).
61.68
-
110172
... More
Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) (Excluding Seigniarage charges and GST) for levelling course.approach slab
37.8
-
5862
... More
Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2704 (5th Revision) and as directed by the Engineer-in-Charge(Excluding Seigniarage charges and GST) for Approach slab
75.6
-
6170
... More
Back filling behind abutments with gravel including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work (excluding seigiorage charges and GST).
731.25
-
712
... More
Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.(excluding seigiorage charges and GST)
219.72
-
1577
... More
Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)
187.2
-
437
... More
Providing and applying 2 coats of synthetic enamel paint to concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm as per Tech Specification 800 MORTH.
6
-
84
... More
Providing and laying boulders apron for bed protection against scour with stone boulders weighing not less than 40kg with 300mm thick each complete as per drawing and specification. complete for finished item of work as per MoRT&H specification 2503 ( 5th revision ) and as directed by the Engineer-in-Charge (Excluding Seigniarage charges and GST).
736.08
-
1501
... More
Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705 MORTH and as directed by the Engineer-in-Charge (excluding GST )
30
-
1498
... More
PCC filling bed protection with Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) (Excluding Seigniarage charges and GST) as directed by the Engineer-in-Charge
97.17
-
5862
... More
Vibrated cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Sub structure
366.96
-
5822