Kakatiya University Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
161641Bid Award Id
ViewTender No
05/6/KU/DB/19-20, Dated: 08-01-2020Tender Authority
Kakatiya University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. COLUMNS (GROUND FLOOR)
3.1
-
11512
V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. PLINTH BEAMS
3.35
-
11119
Providing high yeild strength deformed (HYSD) bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only).
1.02
-
61017
Brick masonry in C.M (1:6) prop: using fly ash brick of size 290x225x140mm having a crushing strength of not less than 50 Kgs/Sqm from approved source like cement, sand, fly ash bricks, water etc. site including all operational, incidental and labour charges such as mixing mortar, scaffolding, lift charges, curing etc. including cost and conveyance of all materials etc. . complete for finished item of work.
16.1
-
6626
Plastering 12mm thick in single coat cm (1:5) including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for finished item of work.
259
-
148
White washing in two coats with suryacem including cost and conveyance of all material to work site and all operational, incidental, labour charges such as scaffolding, lift charges cost of brushes etc.
268
-
35