Kakatiya University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Kakatiya University Tender

Works
Civil And Construction
Building Construction
Opening Date22 Jul 2024
Closing Date6 Aug 2024
Tender Amount₹ 83,56,801 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building Works;Wiring with run of 2 of 1.5 Sqmm FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light, Fan, Exhaust fan and bell points in N.R.B. Makes of wires : Finolex / RR kabel / Havells / Polycab / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (HFFR). Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

140

886

124040

... More
Building Works;Supply and laying of ISI 25mm outer dia medium grade, with IS:9537 part 3 rigid PVC concealed in wall with all required PVC / Metallic Junction Boxes including masonary work and labour charges etc., Makes:- Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

300

94

28200

... More
Building Works;Supply and Laying of ISI 25mm outer dia heavy grade with IS:9537 part 3 rigid PVC pipe concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

400

90

36000

... More
Building Works;Supplying & Fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with internal flushing rim fixed with screws complete Indian make conforming to IS:2556-1995 (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

30

1155

34650

... More
Building Works;S & F 25 mm nominal size copper body float valve with PVC ball Indian make ISI mark Indian make heavy type with ISI mark including cost and conveyance of all materials and labour charges etc., complete for finished item of work (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

515

20600

... More
Building Works;Providing Brick masonry seat for Orissa pan/ Indian W.C. using traditional common burnt clay bricks as per standard practice (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

333

13320

... More
Building Works;S&F Stainless steel liquid soap container wall mounted and bottle type including the cost of pipe & its fittings &labour charges complete (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

20

507

10140

... More
Building Works;Supply & Fixing of 75 mm dia - Plain Bend 87.5 Degree -UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme or any ISI Brand) (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

100

61

6100

... More
Building Works;Supply & Fixing of 110 mm dia - Plain Bend 87.5 Degree -UPVC/SWR Pipe fittings (Prince/Sudhakar/Kisan/Supreme or any ISI Brand) (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

100

100

10000

... More
Building Works;Providing and Placing on Terrace(at all floor levels) plyethelene water storage tank with Double layer approved brand and Manufuture with cover and suitable locking arrangements and making necessary holes for inlet and out lets and over flow pipes but whithout fitting and base support for tanks inculding cost and conveyance of all materils, lead and lift and transpotations to work site etc. complete (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

10000

10

102500

... More
Building Works;Cutting holes in RR Masonary and all labour charges etc complete (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

110

121

13310

... More
Building Works;Supplying, Laying, jointing and testing152.4 mm CC bed 1:2:4 Prop: using 19.05 mm gauge graded granite metal chips and cradling 152.4 mm SWG pipe line all round to have 75 mm nominal size thick cover over the sockets. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

120

307

36840

... More
Building Works;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtightcement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

120

866

103920

... More
Building Works;Supply and fixing 15.90mm Od pipe - SDR 13.5 of Ashirvad/Ajay/Astral Flowgtuarde or equivalent CPVC pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTC (Copper Tube Sizes 1/2" ton 2"" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from indential CPVC compounds having the same physical propertioes for Hot and Cold Water (IS 15778:2007) (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

120

155

18600

... More
Building Works;Supply and fixing 22.20mm Od pipe - SDR 13.5 of Ashirvad/Ajay/Astral Flowgtuarde or equivalent CPVC pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTC (Copper Tube Sizes 1/2" ton 2"" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from indential CPVC compounds having the same physical propertioes for Hot and Cold Water (IS 15778:2007) (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

100

178

17800

... More
Building Works;Supply and fixing 28.60mm Od pipe - SDR 13.5 of Ashirvad/Ajay/Astral Flowgtuarde or equivalent CPVC pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTC (Copper Tube Sizes 1/2" ton 2"" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from indential CPVC compounds having the same physical propertioes for Hot and Cold Water (IS 15778:2007) (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

100

235

23500

... More
Building Works;Supply and fixing of 110mm dia 3 M Single Socket PVC/SWR pipe - 4Kg/sq.cm. (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. Complete (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

80

595

47600

... More
Building Works;Supply and fixing of110mm 4? 45 degree bend, UPVC/SWR pipe fittings (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. Complete (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

120

128

15360

... More
Building Works;Supplying & Fixing 75mm dia 3 M Single Socket PVC/SWR pipe - 4Kg/sq.cm. - Prince/Sudhakar/Kisan/Supreme or any ISI Brand including cost and conveyance of all materials and labour charges etc., complete. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

80

327

26160

... More
Building Works;Supply and fixing of 75mm 3? door bend 87.50 degree, UPVC/SWR pipe fittings (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. Complete (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

120

81

9720

... More
Building Works;Supply and fixing of round jali UPVC/SWR pipe fitting (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

120

31

3720

... More
Building Works;Supply & fixing of 15 mm brass body CP finish self closing tap push cock of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

302

12080

... More
Building Works;S&F of 15 mm brass body CP finish pillar tap of not less than 500 grams weight quarter turn spindle conforming to IS 8931 including cost and conveyance of all materials and labour charges etc., complete for finished item of work (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

122

4880

... More
Building Works;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parry Ware/Neycer)1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock including cost and conveycance of all materials to site, labour charges etc., complete for finished item of work (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

2478

99120

... More
Building Works;Supply and fixing of 15.00mm PVC connection with brass Union nut CP coated first quality to Kohinoor make including cost and conveyance of all materials and labour charges, etc. complete.(Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

80

124

9920

... More
Building Works;Supply and fixing 76.20 mm dia. C.I. Nahani traps (with out jaly with out inlet) UPVC/SWR pipe fitting (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete.(Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

110

104

11440

... More
Building Works;Supply and fixing 38.10 mm dia. PVC solid waste pipe outlet for wash hand basin of Kohinoor make including cost and conveyance of all materials and labour charges, etc. complete.(Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

80

108

8640

... More
Building Works;Supplying and fixing of TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm including all labour charges etc., (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

564

22560

... More
Building Works;Supply and fixing of PVC low level system parry ware,slim line with internal components & short bend: 10 litres capacity single flush including cost and conveyance of all materials, incidental, labour charges etc. complete for finished item of work (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

2238

89520

... More
Building Works;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 &4217 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6 mm (12"x9") C.I Frame and hinged over including cost and conveyance all materials and labour charges etc., ..(Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

761

30440

... More
Building Works;Supply and fixing 580x440 mm orissa pan white glazed W.C with S or P trap Hindustan/Parry/Neycer make confirming to ISS no. 2556 including cost and conveyance of all materials, incidental, labour charges etc. complete for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

30

2345

70350

... More
Building Works;Supply & fixing European Water Closet of 1st quality conforming to IS: 2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with'S' trap including cost and conveyance of all material and labour charges etc complete (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

10

2199

21990

... More
Building Works;Painting to new walls with acrylic emulsion paint weather proof water-based paint to exterior faces of new walls with 3 coats of approved make shade and colour including self prime coat including cost and conveyance of all materials like plastic emulsion paint of Grade-I to site including cost of brushes scaffolding charges, lifting charges and labour charges such as preparing three coats of plastic emulsion etc., complete for finished item of work for External Walls (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

761.2

218

165942

... More
Building Works;Painiting to new wall with 3 coats of synthetic polymer luxury plastic emulsion paint of approved brand over base coat of cement grade-I making three coats to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose provided materials including all taxes cost and conveyance of all materials and labour charges etc. complete for finished item of work for Internal Walls (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

1443

212

305916

... More
Building Works;Dadooing to walls with first quality coloured glazed tiles of approved brand colour set 12mm thick base coat in CM (1:5) prop. and neat grey cement slurry of honey like consistency spread at the rate of 3.3 Kg of cement per sq.m. and jointed with neat white cement paste mixed with pigment of matching shade including the cost and conveyance of all materials like cement, sand, water, glazed tiles etc., to site and cost of seigniorage charges on materials and all operational, incidental labour charges such as mixing mortar, laying, lift charges, curing, fixing tiles in position and including all taxes etc., complete for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

262.8

767

201568

... More
Building Works;Flooring with ceramic tiles of 7.3mm thick 1st quality of any shade as approved by Engineer-In Charge set over a base coat of cement mortar (1:8), 12mm thick laid over flooring bed / VRCC slaab with neat cement slurry of honey like consistency spread @3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

171.2

1132

193798

... More
Building Works;Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

761.2

545

414854

... More
Building Works;Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

1443

517

746031

... More
Building Works;Supplying and fixing Aluminium Anodised Two Track Slinding Windows as per approved drawings with aluminium anodised sections of Series C Jindal sections and outer frame top horizontals & both verticals of size 62 x 29.5 x 1.50 mm and bottom horizontal - two track frame of size 62 x 29.5 x 1.50 mm shutter frame top, bottom and verticals of size 50 x 20 x 1.50 mm and weather interlocking frame of size 50 x 20 mm with plain clear float glass 5 mm thick fixed including supply and fixing Aluminium handles of 100mm for each shutter nylon rollers assembly and all labour charges for fixing the fixtures with requried No. of screws, bolts and nuts and including labour charges for fixing the frame in position, fixing shutter to frame etc., complete for finished item of work ( Aluminum Section weights taken as per Jindal catlog -2008) (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

45

3621

162945

... More
Building Works;Supply and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM.The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and fixing 30mm thick Solid panel PVC door shutter consisting of frame made from M.S. tubes of 19-gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded /sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work including cost of fixture like Al.Handles 100mm-1No. Al.Latches-250mm 1-No., Al. Aldrops-200mm -1 No. including screws and all labour charges etc., complete (Size: 1.20 x 2.10 mt) (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

10

11669

116690

... More
Building Works;Supply and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM.The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and fixing 30mm thick Solid panel PVC door shutter consisting of frame made from M.S. tubes of 19-gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded /sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work including cost of fixture like Al.Handles 100mm-1No. Al.Latches-250mm 1-No., Al. Aldrops-200mm -1 No. including screws and all labour charges etc., complete (Size: 0.75 x 2.10 mt)(Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

40

8539

341560

... More
Building Works;Reinforced Brick masonry in CM (1:4) prop. Using traditional second class bricks having crushing strength of 35 Kg/sq.cm and placing 2 nos. of 6 mm dia M.S. bars embedded in every third layer with free ends of reinforcement keyed to mortar joints of the main brick work where applicable including cost and conveyance of all materials like cement, sand bricks and water to work site cost of seigniorage charges on materials, and all operational incidental labour charges such as scaffolding, mixing mortar, constructing masonry wall, lift charges etc., complete for finished item of work but excluding cost of steel and its fabrication charges, for 0.115m thick wall etc., complete for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

225

1011

227475

... More
Building Works;Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 50 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

117

8145

952965

... More
Building Works;RCC (1:1 ½: 3) nominal mix for Sunshades/chajja?s 0.60m wide with 7.50cms. thickness at fixed end and 5cm thick at free end with an average thickness of 6.25cm using 6mm to 20mm. S.S-5 gauge graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, course aggregate water to work site including cost of seigniorage charges on materials, cost of centering charges, shuttering, machine mixing concrete, laying concrete, lifting charges, finishing smooth plastering, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

34.5

1194

41193

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work For Lintels (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

3.1

15033

46602

... More
Building Works;Providing high yeild strength deformed (HYSD) bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only). (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

12.01

70586

847738

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work For Roof Slab 0.115mm Thick (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

380

1571

596980

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work For Roof Beams (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

19.1

13746

262549

... More
Building Works;Filling basement with good carted gravel from approved quarry in layers not exceeding 15cms consolidating each deposited layer by watering and ramming including cost and conveyance of gravel and water to work site and all operational, incidental labour charges and seigniorage charges etc. complete for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

149.5

511

76395

... More
Building Works;Filling with useful available excavated earth (excluding rock) intrenches, sides of foundation sand basement with initial leading layer stone exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to worksite and all operational, incidental, labor charges, hirecharges of T&P etc., complete for finished item of work. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

220

37

8140

... More
Building Works;Random Rubble stone masonary, in CM (1:8) prop: (Cement Sand) using HBG stones from approved quarry including cost and conveyance of all materials like HBG stones, cement, sand water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement. (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

57.8

4227

244321

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work For Plinth Beams (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

19.2

14476

277939

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work For Columns (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

13.2

15060

198792

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work For Footings (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

29.1

11560

336396

... More
Building Works;Cement concrete (1:5:10) prop. (Cement, Sand, course aggregate) using 40mm gauge crushed granite metal from approved quarry including cost conveyance of all materials like cement, sand coarse aggregate, water etc., to site including cost of seigniorage charges on materials and all labour charges for mixing concrete, laying concrete in foundations, ramming in 15cms layer finishing top surface to required level including curing etc., complete for foundation?s and flooring bed.` (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

38.4

4584

176026

... More
Building Works;Earth work excavation for foundation of building and depositing the earth on bank with an initial lead of 10 mts. and lift of 2 mts. in soils which do not require blasting like loamy, clayey black cotton, red earth, ordinary gravel, mixture of gravel and disintegrated rock, like shale stone earth, earth mixed with fair size boulder?s including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work (Blocks- Administrative Building-2, Univ. Library-3, Ladies Hostel-1, Univ. Sports Board-2, Univ. Arts & Science College-2)

163.9

458

75066



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.