Kakatiya University Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
277380Bid Award Id
ViewTender No
01/KU/DB/2020-21, dated:09-11-2021Tender Authority
Kakatiya University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Civi works;Supply and Transportation of 20W, 2000 Luminor 1200mm length LED retro tube light, housing made with PC body, wide operating voltae with single/double side connection, PF=0.90 surge protection >2kv, THOL 15% with in built driver and prosted colour CCT: 3000k-6500 k as desired by the department and as per IS specifications, minimum CRI=80, etc.,complete with 50,000 buring hours with BIS certification LUMINAIRE MAKE: Phillips/OSRAM/GE Ventro/Wipro/Cromton/Bajaj/Havells/Jaquer/Syska/Eveerady/Surya/Panasonic LED MAKE: Phillips/Lecmileds/Cree/Nichia/Osram
14
-
10738
Civi works;Supply and fixing of Goldmedal / Million / Vimal / Maru / Millitec / Anchor make ISI mark Mini Modular type 6A 3pin / 6A 3pin plug socket with indicator lamp, 16Amps fuse unit and 16 Amps switch control (5 in one) with cover frame on 6?x8? sunglass deluxe board including earth connection and all labour charges etc., complete on wall.
24
-
9384
Civi works;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) FRLS / HFFR / EBXL PVC insulated flexible ISI mark copper cable of Finolex / RR kabel / Fortune Art EBXL make in existing surface pipe with Anchor / Gold Medal Olive / Million Zoom. Make ISI mark 6A Flush type switch, Ceiling rose fixing on 8?x10? sunglass deluxe board including all labour charges etc., complete for light and bell points
36
-
20304
Civi works;Supply and laying of 25mm dia 2.0mm thick PVC pipe (ISI mark) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc. complete. Make: Sudhakar / Maco Plast / Modi
113
-
8249
Civi works;Supply, laying, jointing and testing 152.40mm SWG SP-1 pipes of ISI make confirming to ISI 651&4127 with airtight cement joints in CM 1:5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping including all labour charges
30
-
21330
Civi works;Supply and fixing 22.20mm Od pipe - SDR 13.5 of Ashirvad/Ajay/Astral Flowgtuarde or equivalent CPVC pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTC (Copper Tube Sizes 1/2" ton 2"" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from indential CPVC compounds having the same physical propertioes for Hot and Cold Water (IS 15778:2007)
50
-
7450
Civi works;Supply and fixing of TV shape mirror with plastic make size 609.60x457.20mm including cost and conveyance lf all materials and labour charges each
5
-
2370
Civi works;Supply and fixing 15.90mm Od pipe - SDR 13.5 of Ashirvad/Ajay/Astral Flowgtuarde or equivalent CPVC pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTC (Copper Tube Sizes 1/2" ton 2"" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from indential CPVC compounds having the same physical propertioes for Hot and Cold Water (IS 15778:2007)
50
-
6500
Civi works;Supply and fixing 76.20 mm dia. C.I. Nahani traps (with out jaly with out inlet) UPVC/SWR pipe fitting (Prince/Sudhakar or any ISI brand) including cost and conveyance of all materials and labour charges, etc. complete.
5
-
435
Civi works;Supply and fixing of 550x400xmm single CP pillar cock Indian make flat back wash hand basin 15mm dia PVC connection with bross union nut and CP coated and 15mm dia brass angle stop value of quarter term spindle type 1st quality Indian make 400gms. and 38.10mm CP waste coupling half or full thread 1st quality indian make paryware equilent and 38.10mm dia PVC flexible waste pipe of 914.40mm length of fir quality (HSW/Parryware/Neycer) 1st quality conforming to IS 2556-Part-4-1972 with waste fittings like rubber plug, chain, 32mm nominal size CP fitting with parallel pipe thread conforming to IS-2963-1979 and fitted with 15mm nominal lbore chromium plated pillar tap of 1st quality Indian make 300 grams Seiko/Esso or equivalent complete with standard CI brackets including wooden block , including cost and conveyance of all materials, incidental, labour charges etc. complete for finished item of work.
5
-
12995
Civi works;Painting to new walls with 2 coats of acrylic emulsion paint weather proof water based emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade-I making three coats to all to give an even shade after throughly brusing the surface to remove all loose powdered materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental, and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work. External Walls
35
-
6370
Civi works;Painting to new walls with 2 coats of synthetic polymer luxury Plastic emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade-I making three coats to all to give an even shade after throughly brusing the surface to remove all loose powdered materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental, and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work.
329
-
56917
Civi works;Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5) prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. First floor.
35
-
17255
Civi works;Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5) prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Ground floor.
147
-
66591
Civi works;Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. First Floor.
35
-
16275
Civi works;Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Ground Floor.
147
-
62328
Civi works;Fabrication, supply and fixing of MS tubular pipe 60.80mm OD MS tubular pipe and with MS cleats of size 150x100x6mm MS purlin cleats welding to both sides of pipe with nuts and bolts and one coat of red oxide paint and two coats of best synthetic anamil paint including cost and convayance of all materials and labour chages like cutting, bending, welding and lead, lift and transportation to work site for finished item of work
320
-
303680
Civi works;Roofing with pre-painted Galvanlume Trapezoidal profile Roofing sheets with 0.5mm thickness, coating Alu-Zinc Coating AZ 15 GSM. Tensile strength 550 MPA, paint coating with regular modified polyster painting thickness top 18 to 20 microns, bottom 5 to 7 microns an using suitable size of 1.020m x upto 12.00m with regular range colours fixing with G.I. 'J' bolts & nuts 8mm dia GI / bitumen and limpet washers filled with white lead etc complete for finished item of work but excluding the cost of purlins, rafters etc complete
393
-
258987
Civi works;Supply, Fabrication & Fixing of Truss main MS Pipe 75.30mm OD 15.60m length MS medium weight confirming to ISI standard make tubeler pipe main struss frame and intermediate support like vertical and inclained support by using 48.80mm OD MS tubler pipe medium weight and MS baseplates of 0.32x0.23m 6mm guage welded @ column fixing in position foundation bolts, 16mm Ø each 0.60m length 4nos. welded with 12mm bars 4 nos. top and bottom of the foundation bolts essential in VRCC Columns and circular MS plates welded to MS 90MM dia pipe two sides weled and purlin cleats with a size of 150x100x6mm on top of the stuss on equal distance and middle joint plate 4 Nos. with size of 200x200x6mm welded at top and bottom (middle of struss) complete including one coat of redoxide paint, loading and unloading, transportation fixing in position at site.etc complete for finished item of work as directed by the dept.
4
-
188464
Civi works;Flooring with polished shabad/Tandur blue slab 15 to 18 mm thick (0.457Mx0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or RCC roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at 3.3 kgs of cement for 1 sqm, and joined with near cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work
333
-
202464
Civi works;Filling basement with good carted gravel from approved quarry in layers not exceeding 15cms consolidating each deposited layer by watering and ramming including cost and conveyance of gravel and water to work site and all operational, incidental labour charges and seigniorage charges etc. complete for finished item of work. ground floor
50
-
20950
Civi works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Columns for first floor
1
-
13106
Civi works;Cement concrete (1:5:10) prop. (Cement, Sand, course aggregate) using 40mm gauge crushed granite metal from approved quarry including cost conveyance of all materials like cement, sand coarse aggregate, water etc., to site including cost of seigniorage charges on materials and all labour charges for mixing concrete, laying concrete in foundations, ramming in 15cms layer finishing top surface to required level including curing etc., complete for foundation?s and flooring bed.`
25
-
93200
Civi works;Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 40 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. First Floor
8.5
-
56100
Civi works;Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 40 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. Ground Floor
29
-
180699
Civi works;Dismantling of VRCC slab clearing away and carefully stacking materials useful for reuse including cost and conveyance of all materials to site, lead, lift and labour charges etc.,
5
-
12555
Civi works;Dismantling of brick masonary in cement mortar clearing away and carefully stacking materials useful for reuse including cost and conveyance of all materials to site, lead, lift and labour charges etc.,
26
-
6188
Civi works;Clean removal of clearing away and carefully stacking materials useful for reuse old AC sheets from exisiting AC sheet roofing including cost and conveyance of all materials to site, lead, lift and labour charges etc.,
21
-
588
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements