Kakatiya University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Kakatiya University Tender

Works
Civil And Construction
Building Construction
Opening Date22 Jul 2024
Closing Date6 Aug 2024
Tender Amount₹ 3,24,468 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building Works;Painting to External New walls with two coats Synthetic polymer luxury platic emulsion of superior quality of approved brand and shade over base coat of cement Primer Grade-I making three coats in all to give an even shade after throughly brushing the surface to remove all loose powdered materials including cost & conveyance of all materials cost of brushed water ti site etc., sales & other taxes all operational incidental and labour charges such as scaffolding charges lift charges curing etc., complete for finished item of work (First Floor)

23

203

4669

... More
Building Works;Painting to External New walls with two coats Synthetic polymer luxury platic emulsion of superior quality of approved brand and shade over base coat of cement Primer Grade-I making three coats in all to give an even shade after throughly brushing the surface to remove all loose powdered materials including cost & conveyance of all materials cost of brushed water ti site etc., sales & other taxes all operational incidental and labour charges such as scaffolding charges lift charges curing etc., complete for finished item of work (Ground Floor)

26

203

5278

... More
Building Works;Painting to Internal New walls with two coats Synthetic polymer luxury platic emulsion of superior quality of approved brand and shade over base coat of cement Primer Grade-I making three coats in all to give an even shade after throughly brushing the surface to remove all loose powdered materials including cost & conveyance of all materials cost of brushed water ti site etc., sales & other taxes all operational incidental and labour charges such as scaffolding charges lift charges curing etc., complete for finished item of work (Second Floor)

84

154

12936

... More
Building Works;Painting to Internal New walls with two coats Synthetic polymer luxury platic emulsion of superior quality of approved brand and shade over base coat of cement Primer Grade-I making three coats in all to give an even shade after throughly brushing the surface to remove all loose powdered materials including cost & conveyance of all materials cost of brushed water ti site etc., sales & other taxes all operational incidental and labour charges such as scaffolding charges lift charges curing etc., complete for finished item of work (First Floor)

84

154

12936

... More
Building Works;Painting to Internal New walls with two coats Synthetic polymer luxury platic emulsion of superior quality of approved brand and shade over base coat of cement Primer Grade-I making three coats in all to give an even shade after throughly brushing the surface to remove all loose powdered materials including cost & conveyance of all materials cost of brushed water ti site etc., sales & other taxes all operational incidental and labour charges such as scaffolding charges lift charges curing etc., complete for finished item of work (Ground Floor)

90

154

13860

... More
Building Works;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work

6

6396

38376

... More
Building Works;Supply and fixing of pre-cost of RCC frame or door of sectional area not less than 60 Sgm iin ready to assemble members with mortices tenon dove tailed joint members cost with controlled concrete controlled to M40 grade and having reinforcement not less than 120 Kgs/Cm of conrete including providing and fixing the required umbers of MS oxidized butt hinges, hold fast and other fittings for fixing sliding door bot tower botle and cleats etc by means of machinable plymer wonder blocks or MS galvanized plates complete as directed by department.and supplying and fixing of flush type door shutter 30mm thick solid core type not pressed bonded with water proof phenol format dehydroxe synthetic resin IS 2202(part-I) 1983 4mm thick paint grade commercial plywood on both sides with initial lipping including cost and conveyance of all materials including all taxes all labour charges for making fixing of door furniture in position as Directed by the department and fix the Jyothi make door fixtures to the shutters with 1 No, Aluminium aldrop 16X300mm, 1 No. Aluminium latches 300X16X9.5mm, 1 no. Aluminium Tower Bolts 12X300mm 2 Nos. Aluminium Door Handle 12X17X125 mm, 1No. Aluminium door stopper cup type, 1 no. door rubber solid bushed, 19X6mm sheet metal screws, 25X8mm, sheet metal screws, 50X8mm wood screws, 50X6mm machine screws including cost and conveyance all materials all operational incidental labour charges for fixing door fixtures and frame in to masonry etc. complete for finished item of work as Directed by the department DOOR SIZE: 1.05mt x 2.10mt . (GF,FF,SF)

3

8498

25494

... More
Building Works;Providing Mild Steel bars of 6mm dia meter bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only). Second floor

0.01

81040

1054

... More
Building Works;Providing Mild Steel bars of 6mm dia meter bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only). First floor

0.01

79602

1035

... More
Building Works;Providing Mild Steel bars of 6mm dia meter bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only). Ground floor

0.01

78165

1016

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work.Lintels (Second Floor)

0.2

14842

2968

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work.Lintels (First Floor)

0.2

14586

2917

... More
Building Works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work.Lintels (Ground Floor)

0.2

14331

2866

... More
Building Works;Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Second Floor.

24

586

14064

... More
Building Works;Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. First Floor.

24

539

12936

... More
Building Works;Plastering 12mm thick in two coats with base coat of 8mm thick in cm (1:6) and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Ground Floor.

24

491

11784

... More
Building Works;Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5)prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Second Floor

24

614

14736

... More
Building Works;Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5)prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. First Floor

24

567

13608

... More
Building Works;Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5)prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work. Ground Floor

24

519

12456

... More
Building Works;Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 40 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. Second Floor

4.5

8163

36734

... More
Building Works;Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 40 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. First Floor

4.5

7775

34988

... More
Building Works;Brick masonry in C.M (1:8) prop: using 2nd class bricks having a crushing strength of not less than 40 Kgs/sq. cm including cost & conveyance of all materials and water to work site and all operational, incidental, labour charges such as scaffolding, mixing mortar, constructing masonry, lift charges curing etc. complete for finished item of work. Ground Floor

4.5

7388

33246



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.