Kakatiya University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Kakatiya University Tender

Civil Works Others
Opening Date5 Dec 2020
Closing Date21 Dec 2020
Tender Amount₹ 1,33,807 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civi works;Plain Cement Concrete (1:2:4) prop: using 20mm nominal size hard broken granite machine crushed metal brought from aproved quarry including cost and conveyance of materials and water to work site and all operational, incidental, labour charges such as centering, form work, concrete, laying, lift charges, curing etc. complete for finished item of work.

2.5

-

14185

... More
Civi works;Providing high yeild strength deformed (HYSD) bars of different diameters cutting and bending to required sizes and shapes placing in position with cover blocks, chairs, over labs, spacers, dowels, wastage of approved materials and size tying firmly with MS binding wire, forming grills for reinforcement work as per approved designs and drawing to be supplied at the time of execution of work including cost and conveyance of deformed bars, binding wire cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and and all operational, incidental, labour charges, such as cutting, bending placing in position and tying etc., complete for finished item of work(payment will be made on the basis of weight of fabricated deformed bars only).

0.25

-

15254

... More
Civi works;Painting to new walls with 2 coats of Plastic emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade-I making three coats to all to give an even shade after throughly brusing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and c onveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental, and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work.

10

-

1850

... More
Civi works;Plastering 20mm thick in two coats with base coat of 16mm thick in cm (1:5) prop. and top coat of 4mm thick in CM(1:4) prop. dubara sponge finish with neat finishing trime to the thread lining and straight edge and including cost and conveyance of all materials & water to site and all operational, incidental labour charges such as mixing mortar, curing scaffolding lift charges etc., complete for inside wall towards plumb side face complete finished item of work.

10

-

4140

... More
Civi works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work.PLINTH BEAMS

0.4

-

4447

... More
Civi works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work. Columns

1.25

-

14390

... More
Civi works;V.R.C.C M 20 grade concrete using 6mm to 20mm graded HBG machine crushed chips including cost, seigniorage charges and conveyance of all materials to site, all labour charges centering, machine mixing, laying, vibrating, curing & all water leads etc. complete but excluding cost of steel and its fabrication charges & Including hire charges of T&P & all other incidental and operational charges etc. complete for finished item of work For Column Footings

2

-

17808

... More
Civi works;Cement concrete (1:5:10) prop. (Cement, Sand, course aggregate) using 40mm gauge crushed granite metal from approved quarry including cost conveyance of all materials like cement, sand coarse aggregate, water etc., to site including cost of seigniorage charges on materials and all labour charges for mixing concrete, laying concrete in foundations, ramming in 15cms layer finishing top surface to required level including curing etc., complete for foundation?s

0.5

-

1760

... More
Civi works;Earth work excavation for foundation and depositing the earth on bank with an initial lead of 10 mts. and lift of 2 mts. in soils which do not require blasting like loamy, clayey black cotton, red earth, ordinary gravel, mixture of gravel and disintegrated rock, like shale stone earth, earth mixed with fair size boulder?s including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work

6.5

-

2197



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.