Irrigation And CAD Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 23,404Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
593719Tender No
NIT.No.04/SE/IC/Pochampad/2025-26 dt 03 05 2025Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete ( rubble stones : 0.2475 cum/sqm) (For Maintenance Works)
138.32
273
37817
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials, labour, laying, joining etc., complete with all leads and lifts. Using 750 micron thick LDPE sheet.
42.44
225
9587
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting,bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.
3000
80
242778
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm Before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.
145.9
199
29151
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres as per Technical Specification Clause 202-2.4-2.4(i)-B MORD / MORTH and 2024-25 SSR Standard Schedule of Rates
9.93
852
8461
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal (100 mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 300 kg / cum for use of super plasticiser (0.4% by wt. of cement), CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
5.4
6652
35923
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
276.57
124
34295
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.
3.18
6247
19885
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, gradedaggregates for sub-structure / superstructure works including cost of all materials, machinery, labour, formwork, scaffolding,cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
175.9
6551
1152427
... More
Emergency estimate for Reconstruction of Syphon cum superpassage at Km 4.398 of D 64 at Zabithapur;Dismantling of stone masonry
99.68
720
71802
Evaluation Notes How It Works ?