For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Civil And Construction
Pipe Line Project
Opening Date19 Dec 2022
Closing Date26 Dec 2022
Tender Amount₹ 3,65,743 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BOQ;Providing and laying insitu vibrated M15 (28 days cube compressive strenth not less than 15 N/sqmm) grade cement concrete using 40mm down size approved clean, hard, graded aggregates for Plain Concrete works including cost of all materials, machinary, labour, form work, cleaning, batching, mixing, placing in position, lavelling, vibrating, finishing , curing etc., complete complete for Plain concrete works with initial lead upto1km and all lifts.(For CC Profile walls& Cutoff walls)

0.44

-

2711.05

... More
BOQ;Providing and laying insitu vibrated M15 (28 days cube compressive strenth not less than 15 N/sqmm) grade cement concrete using 40mm down size approved clean, hard, graded aggregates for Plain Concrete works(For CC Bed) including cost of all materials, machinary, labour, form work, cleaning, batching, mixing, placing in position, lavelling, vibrating, finishing , curing etc., complete complete for Plain concrete works with initial lead upto1km and all lifts.

12.92

-

79512.87

... More
BOQ;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc.,complete with initial lead upto 1 km and all lifts.(For Gravel Filling)

21.4

-

3996.19

... More
BOQ;Dismantling of Stone masonry in cement mortar (Direct rate from Sl.No.959 in Pg.No.182 of SSR 2021-22.)

14

-

7140

... More
BOQ;Providing and laying insitu vibrated M15 (28 days cube compressive strenth not less than 15 N/sqmm) grade cement concrete using 20 mm down size approved clean, hard, graded aggregates for sub structure/super structure works including cost of all materials, machinary, labour, form work, cleaning, batching, mixing, placing in position, lavelling, vibrating, finishing , curing etc., complete with initial lead upto 50m and all lifts.

11.3

-

84147.71

... More
BOQ;Providing and laying insitu vibrated M15 (28 days cube compressive strenth not less than 15 N/sqmm) grade cement concrete using 40mm down size approved clean, hard, graded aggregates for Plain Concrete works including cost of all materials, machinary, labour, form work, cleaning, batching, mixing, placing in position, lavelling, vibrating, finishing , curing etc., complete with initial lead upto 50m and all lifts.(For Cusion concrete over pipes )

5.88

-

36192.58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.