For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 10,00,500Document Cost
Refer DocumentsTender Fee
₹ 11,800
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
236071Bid Award Id
ViewTender No
01/2021-22 dated 01.04.2021Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Balance work of Palemvagu Project;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc.,complete with initial lead upto 1 km and all lifts with all standard specifications as directed by the Engineer-In-Charge.
82074.67
-
8847649.43
Balance work of Palemvagu Project;Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts with all standard specifications as directed by the Engineer-In-Charge.
8.56
-
225.13
Balance work of Palemvagu Project;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts with all standard specifications as directed by the Engineer-In-Charge.
36
-
7801.2
Balance work of Palemvagu Project;Providing and filling of Gravel / murrum(CNS) for foundations or above pipes including braking clods and spreading in layers of 10 cm to 15cms,watering, compaction by power roller to achieve density control not less than 98 percent etc,.. Complete lead upto 50 mts and all lift with all standard specifications as directed by the Engineer-In-Charge.
70311.39
-
21634814.7
Balance work of Palemvagu Project;Providing, fabricating and placing in position reinforcement steel bars for RCC works includingcleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,complete with initial lead upto 50 and all lifts with all standard specifications as directed by the Engineer-In-Charge.
7.04
-
541625.92
Balance work of Palemvagu Project;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for wearing coat including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts with all standard specifications as directed by the Engineer-In-Charge.
68.31
-
445394.86
Balance work of Palemvagu Project;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum ) with all standard specifications as directed by the Engineer-In-Charge.
89.14
-
935346.02
Balance work of Palemvagu Project;Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75cm long through stones at 1.50 m c/c over a backing of 60 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts with all standard specifications as directed by the Engineer-In-Charge.
1049.62
-
1815317.79
Balance work of Palemvagu Project;Supplying, Laying and jointing 1200 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( including pipes and collars ), labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto machinery,50 m and all lifts.(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint) with all standard specifications as directed by the Engineer-In-Charge.
585
-
9057906
Balance work of Palemvagu Project;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90 cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) with all standard specifications as directed by the Engineer-In-Charge.
2659.74
-
18518705.72
Balance work of Palemvagu Project;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10N/ sq mm ) grade cement concrete using 40 mm down size approved , clean , hard, graded aggregates for foundation including cost of all materials, machinery, labour, form work, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts. ( cement content:220 kg/cum with use of super plasticiser(0.4% by wt. of cement), CA:0.9 cum, Blending Ratio- 50:30:20, FA:0.45 cum) with all standard specifications as directed by the Engineer-In-Charge.
1677.24
-
10244078.75
Balance work of Palemvagu Project;Excavation for Structures- Mechanical Means Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material with all standard specifications as directed by the Engineer-In-Charge.
43282.77
-
4410514.26