Irrigation And CAD Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Opening Date19 Apr 2021
Closing Date3 May 2021
Tender Amount₹ 10,00,28,914 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Balance work of Palemvagu Project;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc.,complete with initial lead upto 1 km and all lifts with all standard specifications as directed by the Engineer-In-Charge.

82074.67

-

8847649.43

... More
Balance work of Palemvagu Project;Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts with all standard specifications as directed by the Engineer-In-Charge.

8.56

-

225.13

... More
Balance work of Palemvagu Project;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts with all standard specifications as directed by the Engineer-In-Charge.

36

-

7801.2

... More
Balance work of Palemvagu Project;Providing and filling of Gravel / murrum(CNS) for foundations or above pipes including braking clods and spreading in layers of 10 cm to 15cms,watering, compaction by power roller to achieve density control not less than 98 percent etc,.. Complete lead upto 50 mts and all lift with all standard specifications as directed by the Engineer-In-Charge.

70311.39

-

21634814.7

... More
Balance work of Palemvagu Project;Providing, fabricating and placing in position reinforcement steel bars for RCC works includingcleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc.,complete with initial lead upto 50 and all lifts with all standard specifications as directed by the Engineer-In-Charge.

7.04

-

541625.92

... More
Balance work of Palemvagu Project;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for wearing coat including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts with all standard specifications as directed by the Engineer-In-Charge.

68.31

-

445394.86

... More
Balance work of Palemvagu Project;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curingetc., complete with initial lead upto 50 m and all lifts. ( Cement content : 300 kg / cum ) with all standard specifications as directed by the Engineer-In-Charge.

89.14

-

935346.02

... More
Balance work of Palemvagu Project;Providing and constructing 60 cm thick hand packed rough stone revetment with 65 to 75cm long through stones at 1.50 m c/c over a backing of 60 cm thick graded filter media consisting of sand, 10 mm and 40 mm size approved graded aggregates laid in layers of 20 cm thick each including cost of all materials, machinery, labour, laying to required slopes, wedging with chips, finishing etc. complete with initial lead upto 50 m and all lifts with all standard specifications as directed by the Engineer-In-Charge.

1049.62

-

1815317.79

... More
Balance work of Palemvagu Project;Supplying, Laying and jointing 1200 mm dia. NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( including pipes and collars ), labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto machinery,50 m and all lifts.(Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint) with all standard specifications as directed by the Engineer-In-Charge.

585

-

9057906

... More
Balance work of Palemvagu Project;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90 cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) with all standard specifications as directed by the Engineer-In-Charge.

2659.74

-

18518705.72

... More
Balance work of Palemvagu Project;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10N/ sq mm ) grade cement concrete using 40 mm down size approved , clean , hard, graded aggregates for foundation including cost of all materials, machinery, labour, form work, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead up to 50 m and all lifts. ( cement content:220 kg/cum with use of super plasticiser(0.4% by wt. of cement), CA:0.9 cum, Blending Ratio- 50:30:20, FA:0.45 cum) with all standard specifications as directed by the Engineer-In-Charge.

1677.24

-

10244078.75

... More
Balance work of Palemvagu Project;Excavation for Structures- Mechanical Means Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material with all standard specifications as directed by the Engineer-In-Charge.

43282.77

-

4410514.26



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.