Irrigation And CAD Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 40,724Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
571721Tender No
14SE/2024-25 Dt 23.01.2025Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Site Surveys booklets of Major, Minor and Sub Minors/CM&CD structures: For CD works Super passages/Under Tunnel/Inleta/Outlets/Aqueducts/Syphons etc., containing Net level Plan (100m x 100m Grid); LS & Site Plan of the stream ; Catchment Area Plan; LS of the Main Canal/Branch Canal/Minor etc.,; Alignment map showing the structure location; Typical Canal section at structure ; Typical Cross Section of streams at 100m interval; Trial pit Particulars; Report & other necessary documents; Preparation of Booklet
150
830
124500
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Site Surveys booklets of Major, Minor and Sub Minors/CM&CD structures: For Drops, Regulators & Off Take sluices etc., containing Net level Plan (50m x 50m Grid); LS of the Main Canal/Branch Canal/Minor etc.,; Alignment map showing the structure location; Typical Canal section at structure ; Trial pit Particulars; Report & other necessary documents viz. approved Hp's, Inspection notes etc.,Preparation of booklet
207
150
31050
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;HP Booklets of Field Channels inclusive of LS & Site Plan in A1 Size; Km wise LS in A3 Size; HPs report and other related documents; Binding of booklet, etc in finished shape
3
10000
30000
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;HP Booklets of Main Canal/ Branch Canals/ Minors/ SubMinors inclusive of LS & Site plan in A1 Size; Km wise LS in A3 Size, HPs report and other related documents; Binding of booklet, etc in finished shape
3
4198
12594
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Cost of Stationery, Computer typing, Printing and binding for the following items including labour charges, cost of materials, stationery, and all materials and operations, required to complete finished item of work etc. complete: Index Maps, Approved Alignment of Main Canals in A0 Size
5
600
3000
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Ayacut registers pipe wise on major, minor and sub-minor by asertaining the details such as the Sy.Nos, total Extent, Extent of irrigation, particulars of cultivation etc. from concerned revenue authorities and verifying the same in field marking suitable necessary corrections in command plans for each block including labour charges and all other materials and operations, required to complete finished item of work.
1255
143
180607
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Earth work estimates of Field channel by adopting current SoR and Standard Data including labour charges, cost of drawing materials and all other materials and operations, required to complete finished item of work.
62
1457
90390
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Hydraulic particulars of Field channel including all operations required to complete finished item of work and as directed by Engineer-in-Charge
62
1943
120520
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting survey for Logitudinal Sections on field channels at an interval of 25 m, supply of plans neatly drawn on computer, including cost of materials, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records.
62
3160
195920
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting preliminary investigation of minors/sub-minors including alternatives for finalizing the Alignment as directed by the Engineer - in - Incharge including cost of all materials , labour and supply of field records.
1255
18
23531
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting peg marking for land aquisition of Main canals/Branch canal/Distributories for finalised Alignment including cost and conveyance of all materials, stationery, hire charges of survey equipments, labour and hire charges of jeep etc and supply of field records as directed by Engineer-in-Charge .
58
3030
175792
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Land Plan Schedules for Main canals/Branch canal/Distributories as per the standards duly marking the boundary of land widths both on village maps showing the widths required Survey Number wise and holding wise for acquisition including labour charges, cost of materials and all materials and operations, required to complete finished item of work including obtaining approval from competent authority.
243
185
45094
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting Geophysical investigation studies by Electrical Resistivity Method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete including cost of transportation arrangements:Along MINORS
90
479
43133
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting Geophysical investigation studies by Electrical Resistivity Method in stages of 5m for sub-surface details such as depth of formations, shear zones, classification of strata, depth of water table etc., including cost of all materials, equipments, labour, analysing and reporting the details of field studies conducted etc., complete including cost of transportation arrangements:Along Main Canal
200
479
95850
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Earth work estimates of Branch Canal/Distributory/Minors/ SubMinors by adopting current SoR and Standard Data including labour charges, cost of drawing materials and all other materials and operations, required to complete finished item of work.:Minors & Sub Minors: Minors & SubMinors
8.7
1458
12685
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Earth work estimates of Branch Canal/Distributory/Minors/ SubMinors by adopting current SoR and Standard Data including labour charges, cost of drawing materials and all other materials and operations, required to complete finished item of work.: Main Canal
15
5831
87475
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Estimates of CM&CD structures on Main Canal/ Branch canal / Distributory with a discharge below 3 cumecs as per departmental guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by the Engineer-in-Charge .
39
2332
90973
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Estimates of CM&CD structures on Main Canal/ Branch canal / Distributory with a discharge from 3 to 10 cumecs as per departmental guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by the Engineer-in-Charge .
61
9330
569168
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Design of CM & CD structures on Main Canal/Branch canals /Distributory with a discharge less than 3cumecs and preparation of drawings as per CE/CDO guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by Engineer-in-Charge
39
2332
90973
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Design of CM & CD structures on Main Canal/Branch canals /Distributory with a dischargefrom 3 to 10 cumecs and preparation of drawings as per CE/CDO guide lines including all labour charges, cost of materials etc. all materials, operations required to complete the finished item of work as directed by Engineer-in-Charge
37
9330
345233
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting net level survey using DGPS and Terrestrial Laser scanner @ 5m interval for CM & CD works on Branch canal /Distributory as per CE, CDO guide lines including labour charges, cost of materials, paints, all materials and operations required for finished item of work as directed by the Engineer-in-charge duly marking contour lines @1.0 m interval and all other features etc.
72.25
1973
142596
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting survey for Cross Sections at an interval of 25 m with levels taken at 3 m intervals along cross section , supply of cross section book neatly drawn on computer, including cost of materials, Stationery, hire charges of survey equipment, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records. For Site survey of CM & CD works.
66
3163
208821
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting survey for Cross Section at every 25m on LS with levels taken at 3m interval on that cross section for a length of 30m on either side i.e, L/S and R/s of canal alignment, supply of cross section plan neatly drawn on computer, including cost of materials, Stationery, hire charges of survey equipment, labour charges and all incidental and operational charges required to complete finished item of work including obtaining approval from competent authority and supply of field records as directed by the Engineer-in-charge. For site survey of maincanal and distributaries
31
3163
98082
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting survey for Logitudinal Sections at an interval of 25 m, supply of plans neatly drawn on computer, including cost of materials, labour charges and all incidental and operational charges required to complete finished item of work as directed by the Engineer-in-charge and supply of field records. For Site survey of CM & CD works.
55
3163
174017
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting survey for Logitudinal Sections at an interval of 25 m, supply of plans neatly drawn on computer, including cost of materials, labour charges and all incidental and operational charges required to complete finished item of work including obtaining approval from competent authority and supply of field records as directed by the Engineer-in-charge.For site survey of maincanal and distributaries
23.7
3163
74986
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Preparation of Hydraulic particulars of Main Canal/ Branch Canal/Minors/ Sub Minors including all operations required to complete finished item of work including obtaining approval from competent authority as directed by Engineer-in-Charge
23.7
7775
184280
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Providing and fixing granite cuddy stones of size 20 x 20 x 75 cm for Centre Line including cost of all materials, labour, engraving marks etc.,complete with a lead upto 50 m and all lifts as directed by the Engineer-in-Charge.
332
267
88910
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Providing and fixing granite cuddy stones of size 20 x 20 x 75 cm for Land Acquisition boundary for main canal/ distributory/ minors/Sub Minors including cost of all materials, labour, engraving marks etc., complete with a lead upto 50 m and all lifts as directed by the Engineer-in-Charge. IRR PMW 2-7 at 100 m int. Both sides.
290
267
77662
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Providing and fixing 20 x 20 x 75 cm size (DCBM Stones) bench mark stone in CC 1 : 4 : 8 using 40 mm down size graded coarse aggregate including cost of all materials, labour,dressing top surface, engraving BM data etc.,complete with lead upto 50 m and all lifts.
47
761
35767
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Carrying of DCBM value from G.T.S Bench mark to project site along the Main Canal/Branch Canal/Distributary at an interval of 500m and at structure locations by conducting levelling and writing the values on RCC stone including cost and conveyance of materials, painting and all other materials, LF books and all operations required to carryout the finished item of work as directed by the Engineer in Charge and supply of recorded LF books.
23.7
5265
124791
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting Chain and Prismatic survey for alternative alignment of Main Canal/Branch Canal/Distributary including alternatives for finalizing the Alignment as directed by the Engineer - in - Incharge including cost and conveyance of all materials, labour etc and supply of field records.
7
4443
31102
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Conducting Chain and Prismatic survey of Main Canal/Branch Canal/Distributary including alternatives for finalizing the Alignment as directed by the Engineer - in - Incharge including cost and conveyance of all materials, labour etc and supply of field records.
23.7
2636
62481
... More
Conducting detailed survey including Preliminary investigation, Net Level survey, taking Longitudi;Investigation, Conducting block leveling along the forest using DGPS and Terrestrial Laser scanner for contours at an intervel of 0.5M meter of distributory network system consisting of Minors/Sub-Minors up to field channel including perperation of Block command area maps and obtaining approval from competent authority.
1255.06
290
364658
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements