Irrigation And CAD Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Agriculture or Forestry Works
Opening Date16 May 2025
Closing Soon23 May 2025
Tender Amount₹ 17,21,321 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

52.42

6595

345715

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all initial leads upto 50m and all lifts. .as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

15.75

6745

106237

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50m and all lifts. ( Cement content : 260 kg / cum with use of super plasticiser, as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

3.2

7548

24154

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with all leads and all lifts.as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

11.12

72

807.31

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing hearting embankment using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.s.as per drawing or as directed by the Engineer-In-Charge complying with all standard specification

1995.08

188

375275

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Depth upto 3 m as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

33.72

124

4181

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down sizeapproved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing inposition, levelling, vibrating, finishing, curing etc., complete with initial leadupto 50 m and all lifts. (Cement content: 220 kg / cum with use of superplasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-- 50:30:20, FA : 0.40 cum)as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

8.82

6279

55380.78

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Benching old embankment slopes 0.45 X 0.45 M as per drawing or as directed by the Engineer-In-Charge complying with all standard specification

1041.3

9

9372

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Excavation in all kinds of soil including boulders upto 0.30 m dia for field channels, seating of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m. (Machinery excavation and manual conveyance) as per drawing or as directed by the Engineer-In-Charge complying with all standard specification

24.75

72

1782

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with all leads and all lifts.as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

234.73

72

17041.4

... More
RAT Restoration of Oora Cheruvu Ullithimmaipally V Chegunta M Medak Dist;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50m and all lifts. ( Cement content : 260 kg / cum with use of super plasticiser, as per approved drawing or as directed by the Engineer-In-charge complying with all standard specifications.

21.36

7548

161230



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.