Irrigation And CAD Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Irrigation And CAD Department Tender
Excavation
Irrigation Work
Opening Date27 Jan 2025
Closing Soon16 Feb 2025
Tender Amount₹ 81,09,66,138
Costs
EMD
₹ 81,09,662Document Cost
Refer DocumentsTender Fee
₹ 29,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
571800Tender No
08 SE/IC MALL/2024-25,Dt:24.01.2025Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dharmareddy canal;SCREW GEAR HOISTS INCLUDING PLATFORM ( UPTO 10 TON CAP) Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw gear type hoist consisting of supporting structure, platform, ladder etc., with all accessories for operating canal escape / regulator gate including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,finishing etc.,complete with all leads and lifts for finished item of work as directed by the Engineer-in-Chief. (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately).
16
44659
714546
... More
Dharmareddy canal;VERTICAL LIFT GATES-EM PARTS Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elements etc., with all accessories for spillway stop log gates and other vertical lift elements including cost of all materials, machinery, labour, etc., complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately) for finished item of item and as directed by Engineer-in-Charge.
3.86
227059
876450
... More
Dharmareddy canal;Providing 40 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge.
405
12204
4942742
... More
Dharmareddy canal;Providing 60 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 1 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.2% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge.
607.5
11963
7267644
... More
Dharmareddy canal;Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per MoRT&H Specification 503 (5th revision) for finished item of workand as directed by the Engineer-in-Charge..
10125
14
147825
... More
Dharmareddy canal;Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor as per MoRT&H specification 502 (5th Revision) for finished item of work and as directed by the Engineer - in charge.
10125
50
510300
... More
Dharmareddy canal;Providing, Laying, Spreading and compacting graded HBG/HBT crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as per MoRT&H specification.406 (5th revision) for finished item of work and as directed by the Engineer-in-Charge.
2595
2218
5758046
... More
Dharmareddy canal;Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) for finished item of work and as directed by the Engineer-in-charge.
2160
1997
4314816
... More
Dharmareddy canal;Supplying & fixing of R,C.C.M15 Guard stones of size 900mm X 200mm X 200mm and painting including cost & conveyance of all materials, labour charges etc.,complete for finished item of work as directed by the Engineer-in-charge.
1032
1098
1133239
... More
Dharmareddy canal;Providing and fixing one line dressed 65x15x10 cm thick IRC standard hectometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 50x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts for finished item of work as directed by the Engineer-in-charge.
207
1498
310190
... More
Dharmareddy canal;Providing and fixing one line dressed 111x35x25 cm thick IRC standard kilometre stone in cement concrete M-10 grade with 40 mm down size aggregates including excavating pit of size 70x45x40 cm, embedding the stone by 30 cm in concrete, providing 2 coats synthetic enamel paint of approved quality and colour to exposed surfaces and lettering as directed, cost of all materials, labour, finishing, curing etc., complete with initial lead upto 50 m and all lifts for finished item of work as directed by the Engineer-in-charge.
51
1885
96181
... More
Dharmareddy canal;Supply of 310mm PVC Water stopper as directed by the Engineer- in- Charge.
639.9
545
349001
... More
Dharmareddy canal;Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint) for finished item of work as directed by the Engineer-in-charge.
40
713
28532
... More
Dharmareddy canal;Manufacturing, Supplying & delivery of 600mm dia RCC NP2 Plain ended Hume pipes of including cost of conveyance of all materials and laying & fixing of in position etc., complete as directed by the Engineer-in-charge.
150
1822
273345
... More
Dharmareddy canal;Laying and jointing 900mm dia NP- 3 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with all lead upto 50mt and all lifts ( Cement content: 44.60 kg/joint, FA: 0.01 cum/joint, Hemp yarn:0.34 kg/joint) for finished of work as directed by the engineer-in-charge.
35
1051
36785
... More
Dharmareddy canal;Manufacturing, Supplying & delivery of 900mm dia RCC NP3 Plain ended Hume pipes of including cost of all materials and laying & fixing of in position etc., complete as directed by the Engineer-in-charge.
280
7446
2085020
... More
Dharmareddy canal;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with intital lead upto 50m and all lifts for finished item of work as directed by the Engineer-in-charge.
726840.25
72
52768602
... More
Dharmareddy canal;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts the finished item of work as directed by the Engineer-in-charge.
2102.2
633
1332374
... More
Dharmareddy canal;Supply of expansion joint filler board conforming t IS: 1838 for buildings,colomns, beams, and slabs 20mm THICK etc., complete including all leads and lifts for the finished item of work as directed by the Engineer-in-charge.
1897.82
386
733128
... More
Dharmareddy canal;Providing and laying 75 mm thick in-situ M-15 ( 28 days cube compressive strength not less than 15 N / sqmm ) grade cement concrete with 20 mm down size approved, clean, hard,graded aggregates for canal lining using vibrating cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to other side of canal etc., complete with initial lead upto 1 km and all lifts. (43 Gr Cement content: 300 kg /cum (22.5 kg/ sqm) for use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum equivalent concrete volume:79.2 cum including the extra quantity of concrete for curvatures and bends etc.,) for finished item of work as directed by Engineer-in-Charge.
2372.5
510
1211161
... More
Dharmareddy canal;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & slab for including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) complete with intital lead upto 50m and all lifts for the finished item of work as directed the Engineer-in-charge..(DLRB).
172.64
6136
1059423
... More
Dharmareddy canal;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & slab for including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) complete with intital lead upto 50m and all lifts for the finished item of work as directed the Engineer-in-charge.(DLRB)
1682.52
11369
19129916
... More
Dharmareddy canal;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) for finished item of work as directed the Engineer-in-charge.(SLRB)
1638.77
6136
10056476
... More
Dharmareddy canal;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, etc., complete with initial lead upto 50 m and all lifts for finished item of work. (Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) as directed the Engineer-in-charge.(SLRB)
5782.06
11369
65740866
... More
Dharmareddy canal;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) for finished item of work, as directed the Engineer-in-charge.
30923.48
6464
199914114
... More
Dharmareddy canal;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) as directed the Engineer-in-charge.
20639.08
6101
125935538
... More
Dharmareddy canal;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) as directed the Engineer-in-charge (For Guidewalls)
2922.67
5756
16824350
... More
Dharmareddy canal;Dismantling stone masonry, clearing away and carefully stacking materials for reuse of, including labour charges and all incidential charges etc., complete as per specifications and as directed by he Engineer in charge for finished item of work as directed by the engineer-in-charge.
4197
720
3023099
... More
Dharmareddy canal;Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts, as directed by Engineer-in-Chagre.
108842.98
303
32979423
... More
Dharmareddy canal;Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc., complete with initial lead upto 1 km and all lifts as directed the Engineer-in-charge.
111791.52
697
77985764
... More
Dharmareddy canal;Excavation in hard rock (including F&F rock) requiring blasting including boulders above 0.6 m upto 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated rock in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts, as directed the Engineer-in-charge.
227668.19
280
63792627
... More
Dharmareddy canal;Excavation in ordinary rock (including HDR) without blasting including boulders above 0.30 m upto 0.6 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including dressing of bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soft rock neatly in dump area or for formation of service road as directed etc., complete with lead upto 1 km and all lifts as directed the Engineer-in-charge.
262857.21
180
47340584
... More
Dharmareddy canal;Excavation for Structures- Mechanical Means ( Data adopted from MORTH) Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ( depth upto 3 meters) as directed by the Engineer-in-charge.
34847.34
124
4321070
... More
Dharmareddy canal;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road [embankment as directed etc.; complete with initial lead upto 1 km and all lifts as directed by the Engineer-in-charge.
424150.41
132
56242344
... More
Dharmareddy canal;Clearing thin jungle growth ( Less than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete as directed by Engineer-in-charge.
227799
3
842856
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%