Irrigation And CAD Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Irrigation And CAD Department Tender
Civil And Construction
Opening Date20 Jun 2024
Closing Date4 Jul 2024
Tender Amount₹ 1,08,09,552
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
485289Tender No
NIT 06/2023-24Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork/Scaffolding/gova, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc., complete with all leads and lifts.
256
4982
1275601.92
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, form work, scaffolding, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc.,complete with all leads and lifts.
30
5672
170183.1
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, form work, scaffolding, cleaning, batching, mixing, placing in position, leveling, vibrating, finishing, curing etc.,complete with all leads and lifts.
44
5672
249601.88
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial all leads and lifts.
281
7551
2121982.74
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 30 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for piers and abutments including cost of all materials, labour, machinery, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and lifts.
5
7116
35582.7
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for troughs including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with all leads and lifts.
74
11539
853952.6
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M-20 (28 days cube compressive strength not less than 20 N/sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for slabs for small culverts span upto 2 mts including cost of all materials,machinery, labour, formwork,scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all lead and lifts.
2
6251
12502.34
Construction of Super Passage at Km1.740;Providing and laying insitu vibrated M- 30 (28 days cube compressive strength not less than 30 N/sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, form work, cleaning, batching, mixing, placing in position in alternate panels, leveling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with all lead and lifts.
8
5762
46099.28
Construction of Super Passage at Km1.740;Supply & laying of thick kraft paper over bed blocks and piers
20
380
7600
Construction of Super Passage at Km1.740;Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm diameter steel dowel rods on either side at 1m interval, forming 125 x 125 mm size groove in between two water stops, providing & fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulation steam at interval, forming 150 mm diameter formed drain behind water seals including filling groove with asphalt, circulation of steam at intervals, cost of all materials, machinery, labour etc, Complete with all leads and lifts
25
2687
67190
Construction of Super Passage at Km1.740;Providing and filling murum / gravely soil ( CNS soil ) for foundation or above pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power roller to achieve density control of not less than 98 percent etc., complete with all leads and lifts.
177
543
96146.4
Construction of Super Passage at Km1.740;Providing and constructing 25 cm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with all leads and lifts.
38
243
9248.82
Construction of Super Passage at Km1.740;Supply & laying of mastic pads of 20 mm thick for expansion joints of deck slabs
6
955
5730
Construction of Super Passage at Km1.740;Providing and constructing protective railing consisting of in-situ railing posts of size 15 x 15 cm at bottom, 10 x 10 cm at top and 75 cm height at 2 m centre to centre in M-20 grade concrete using 20 mm down size graded aggregates and with each post reinforced by 4 Nos of 8 mm dia main bars embedded in kerb concrete for a depth of 40 cm and 5 Nos. of 6 mm dia. stirrups including fixing 3 rows of 40 mm dia. GI pipes with one coat of red oxide primer and two coats of synthetic enamel paint, cost of all materials, machinery, labour, formwork,
24
1498
35974.56
Construction of Super Passage at Km1.740;HYSD BARS - Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with all leads and lifts.
24
104538
2508919.2
Construction of Super Passage at Km1.740;Providing semi-previous / previous casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, compacting each layer without watering to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
1357
235
319166.4
Construction of Super Passage at Km1.740;Dewatering in Coffer Dam using 20 hp diesel pump
212
739
156838
Construction of Super Passage at Km1.740;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with all lead and lifts.
1357
128
173831.7
Construction of Super Passage at Km1.740;Earth work in excavation in soils for Ramps
23.5
128
3010.35
Construction of Super Passage at Km1.740;Earth work in excavation in HDR for Ramps
94
111
10518.6
Construction of Super Passage at Km1.740;Earth work in excavation in F&F for Ramps
187.5
265
49781.25
Construction of Super Passage at Km1.740;Earth work in excavation in HR for Ramps
3255
665
2166853.5
Evaluation Notes How It Works ?