Irrigation And CAD Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
519871Tender No
N I T. No: 11/2023-24, Dated:24-08-2023Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
boq;Cleaning gates / hoists / embedded parts/lifting beams etc, to expose fresh metal surface for painting by sand blasting method as per specifications including cost of all materials, labour, machinery, scaffolding, etc., complete with initial lead for sand upto 1 km and all lifts.Consider 100 sqm area for cleaning by sand blasting:
433.47
741
321286
boq;Painting of embedded metal parts and all types of gates, stoplogs,etc, on sand blasted surfaces withone coat of inorganic zinc silicate (airless spray preferred)70+/- 5 and two super coats with a total thickness of 300 microns (each 150+/- 5) of solventless coaltar epoxy paint each coat 150 microns( total 300 microns) cost of all materials, labour, scaffolding etc., complete with all leads and all lifts
236.78
686
162428
boq;HOISTS:STRUCTURAL COMPONENTS--Painting structurals on sand blasted surfaces with two coats of zinc phosphate primer (airless spray preferred) 40microns/coatand one coat 65+/-5 of alkyd based micaccous iron oxide paint followed by two coats of synthetic enamel paint 25 microns/coat cost of all materials, labour, scaffolding etc., complete with all leads and all lifts
190.55
627
119571
boq;HOISTS:MACHENARY COMPONENTS--Painting hoist machinery, on sand blasted surfaces with one coats of zinc phosphate primer (airless spray preferred) 50microns/coatand three coats of aluminium paint or synthetic enamel , 25 microns/coatcost of all materials, labour, scaffolding etc., complete with all leads and all lifts
6
601
3610
boq;Building (Part-III)- U Section- Dismantling S.No.1048-TBSC-U.I-01- Stone Masonary-Dismantling of existing C.C. Lining / stone masonary including T&P, disposal of unserviceable material as per Technical Specification with all leads and lifts as per the instructions of the Engineer-in-Chief.
5.94
681
4049
boq;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, gradedaggregates for columns and beams including cost of all materials, labour, machinery,formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating,finishing, curing etc.,complete with initial lead upto 50 m and all lifts.(Cement content: 330 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
5.94
11252
66839
Evaluation Notes How It Works ?
Potential Partner