Irrigation And CAD Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Civil And Construction
Irrigation Work
Opening Date31 May 2024
Closing Date7 Jun 2024
Tender Amount₹ 20,47,372 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairs to damaged intake well;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser (0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum).

4

5888

91859

... More
Repairs to damaged intake well;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Depth upto 3 m (For casing to the PSC pipe)

4

123

3597.4

... More
Repairs to damaged intake well;Dismantling of damaged Stone masonry in cement mortar in circular shape including cost of all materials,machinery, labour, finishing, etc., complete with lead upto 100 m and all lifts.

3

681

77099

... More
Repairs to damaged intake well;Dismantling of damaged Stone masonry in cement mortar in circular shape including cost of all materials,machinery, labour, finishing, etc., complete with lead upto 100 m and all lifts.

3

600

-

... More
Repairs to damaged intake well;HOIST BRIDGES ,HOISTING EQUIPMENT AND CRANES, Etc, Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning,applying primary coat with two coats of Zinc chromite red oxide primer , followed by finishing coats 3 coats with synthetic enamel paint with material, labour and all accessories with all leads and lifts where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is to adopt surface preperation done manually by hand and power tool after cleaning by chemical treatment to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting, before applying primer painting.

3

551

18699.2

... More
Repairs to damaged intake well;Supply & Fixing of 300 MM dia. MS Pipe for suction pipe including cost of all materials, machinery, labour, placing in position, welding, transportation etc., complete.

1

207

226012.6

... More
Repairs to damaged intake well;Complete dismantling, Overhauling & Servicing to 150mm dia Air Cushion valves / Quick Released damped Air Valves (QRDA) including replacement of all defective items and assembling of valve, erection on base plate, testing, trail run at site and all other incidental charges etc, Complete for finished item of work.

3

13600

27200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.