Irrigation And CAD Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date7 Nov 2024
Closing Date18 Nov 2024
Tender Amount₹ 20,91,289 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Nalla Cheruvu Yerrupalem;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials,machinery, labour, formwork, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.4.0cum)

9.95

6834

68007

... More
Nalla Cheruvu Yerrupalem;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for Super Structure filling including cost of all materials,machinery, labour, formwork, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.4.0 cum)

15.99

6702

107177

... More
Nalla Cheruvu Yerrupalem;Manufacturing, Supply and Delivery of 300 mm R.C.C. Np3 Socket & Spigot pipes conforrming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) including transportation, taxes & duties including.

45

1760

79200

... More
Nalla Cheruvu Yerrupalem;Laying anf jointing 300 mm dia class or IRC standard hume pipes in CM 1:2 proportion by value including cost of all materials (excluding pipes and collars), machinery, labour, aligning, packing joints with hemp, finishing curing etc., complete with initial lead up to 50 m and all lifts of all materials, machinery , labour, seal fixing etc., complete as per specifications and approved drawings.

17

548

9330

... More
Nalla Cheruvu Yerrupalem;OT sluice Shutters EM Parts: Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sil beam, slide tracks, seal seats, Guide plates etc., with all accessories including cost of all materials, machienery, labour etc., complete as per specifications and approved drawings.

0.19

115961

22177

... More
Nalla Cheruvu Yerrupalem;(OT sluice Shutters) Design, Fabrication,Erection and commissioning of Skin parts, Horizontaland vertical angles, stiffners, rubber seals, comps with all accessories for spill way stop log Gates and other Vertical Lift Elements including cost of all materials, machienery, labour etc., complete as per specifications of drawings.

0.03

297090

8934

... More
Nalla Cheruvu Yerrupalem;OT SLUICE SHUTTERS Fabrication,supply erection, testing and commissioning of Embedded parts,consisting of supporting structure, platform etc., with all accessaries for operating canal escape/regulator gate with all accessories including cost of all materials, machienery, labour, cutting bending, aligning, anchoring, welding, finishing etc., complete as per specifications and approved drawings.

0.17

166012

28229

... More
Nalla Cheruvu Yerrupalem;EM PARTS and SHUTTERS: Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protextive mastic to a thickness of 70+5 microns,followed by finishing two coats with soventless coat tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.

3.17

724

2298

... More
Nalla Cheruvu Yerrupalem;HOIST: Painting of sluice for maintenance works: Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with two coat of Zinc chromite Red oxide primer followed by finishing three coats with synthetic enamel paint with material labour and all accessaries with all leads and lifts. Where surface cleaning by sand blasting is not feasible and based on specific recommendations of designers, it is t o adopt surface preparation done by manual and power tool after cleaning by chemical treatment to remove grease, rust, scaling and to form phosphate coating to prevent further rusting, before applying primer painting.

2.27

593

1348



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.