Irrigation And CAD Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 1,08,40,500Document Cost
Refer DocumentsTender Fee
₹ 29,500
Summary
Jcr - Dlis - Phase - Ii - Rfmc - Cc Lining To R.s.ghanpur Main Canal From Km.12.650 To Km.31.20 (t.e) &
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
561903Bid Award Id
ViewTender No
06/2024-25, Dated:07.12.2024Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, side tracks, seal seats, guide rails, with all accessories for vertical lift gate including cost of all materials,machinery, labour, etc., complete as per specifications and approved drawings (without painting) for finished item of work as directed by the Engineer in charge. (Section.7,Specifications) (IRR-GAW-2-1)
2
229540
459080
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Manufacture and supply and delivary of 600mm dia RCC Spun/Vibrated caste Reinforced socket and spigot of NP3 Class confirming to B.I.S 458/2003 at site as directed by the Engineer in charge(rate per metre of effective length adding transportation and charges Basic rate as per SOR TABLE 3-1/PH
7.5
5793
43451
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Laying and jointing 600 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with all leads and all lifts as directed by the Engineer in charge. (Cement content: 24.8 kg / joint, FA : 0.025cum/joint, Hemp Yarn : 0.22kg/joint) (IRR-CCDW-6-3)
2
847
1696
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and all .lifts as directed by the Engineer in charge.(IRR-CAW-7-24)
132
253
33462
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing semi-pervious / pervious casing hearting embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with all leads for water as directed by the Engineer in charge.(IRR-CAW-4-3)
29876
89
2664939
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with all leads and all lifts as directed by the Engineer in charge.(IRR-CCDW-2-1)
158653
85
13580697
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching,mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with all leads and all lifts as directed by the Engineer in charge. (Cement content: 330 kg / cum,CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) If water is to be brought from other place add only lead charges @ 500 ltr / cum. (IRR-DAW-2-29)
1662
6865
11409630
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and all lifts as directed by the Engineer in charge. (Cement content : 330 kg / cum, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (IRR-CCDW-2-25)
550
12106
6658520
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and all lifts as directed by the Engineer in charge.(Cement content: 320 kg / cum,CA :0.90cum, Blending Ratio of CA--50:30:20, FA :0.40 cum) (IRR-CCDW-2-8)
17028
8163
139006375
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and all lifts as directed by the Engineer in charge. (Cement content: 310 kg / cum,CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) (IRR-CCDW-2-7)
11525
7550
87019513
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Excavation for Structures- Mechanical Means( Data adopted from MORTH) Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.Depth upto 3 m as directed by the Engineer in charge. (IRR-CCDW-1-2)
45482
124
5639768
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Excavation for foundation in all kinds of soil including boulders upto 0.30 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil neatly in dump area or disposing off the same as directed etc., complete with initial lead upto 1 km and all lifts.(IRR-CAW-1-1)
59371
132
7872595
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts as directed by the Engineer in charge.(IRR-CAW-7-36)
9284
126
1174426
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts as directed by the Engineer in charge.(IRR-CAW-7-37)
405845
35
14326329
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including Excavation of drains and Cost of procuring of all materials including all leads and for all lifts as directed by the Engineer in charge.(IRR-CAW-5-9)
32677
1001
32716212
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including Excavation of drains and Cost of procuring of all materials including all leads and for all lifts as directed by the Engineer in charge.(IRR-CAW-5-8)
22296
1443
32186506
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere side of canal etc., complete with all leads and all lifts. ( 43 Gr Cement content: (300kg /cum) 22.5 kg / sqm,CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum, equivalent concrete volume:88 cum including the extra quantity of concrete for curvatures and bends etc.,) (IRR-CAW-7-8)
375247
711
267052032
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining(of thickness 75 mm) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and all lifts as directed by the Engineer in charge. (Cement content: 300 kg / cum, CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (IRR-CAW-7-15 modified) Manual Lining
21846
7381
161258434
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for plain concrete model sections including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and all lifts as directed by the Engineer in charge. (Cement content: 220 kg /cum CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) (IRR-CCDW-2-5)
3618
5804
21001043
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing semi-pervious / pervious casing embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning and compacting each layer without cm before compaction, breaking clods, sectioning and compacting each layer without watering to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete for finished item of work as directed by the Engineer in charge. (DOWEL BANK) (IRR-CAW-4-5)
24115
67
1634997
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour,all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with all leads all lifts for finished item of work as directed by the Engineer in charge.(IRR-CAW-2-3)
668229
302
202406564
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment etc., complete with initial lead upto 1 km and all lifts for finished item of work as directed by the Engineer in charge.(IRR-CAW-1-1)
526500
132
69813900
... More
JCRDLIS Phase II RFMC CC Lining to R.S.Ghanpur Main Canal from Km.12.650 to Km.31.20;Clearing thin jungle growth ( more than 50 percent open space ) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same for finished item of work as directed by the Engineer in charge.(IRR-PMW-1-1)
1038800
2
2493120
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements