Irrigation And CAD Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date9 Jan 2024
Closing Date16 Jan 2024
Tender Amount₹ 1,02,42,116 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ReConstruction of switch gear control panel room;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to the work site and all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

546.8

490

268151

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

58.29

9964

580802

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

13.58

12714

172657

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

12.2

12111

147754

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

12.13

13200

160116

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

21.9

11211

245521

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. .to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

21.9

12030

263457

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

282.33

1537

433946

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

282.33

1779

502270

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

7.04

12126

85367

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

16.3

12992

211770

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

13.5

933

12600

... More
ReConstruction of switch gear control panel room;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

13.5

1187

16025

... More
ReConstruction of switch gear control panel room;Brick Masonry 9" in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

76.28

9538

727597

... More
ReConstruction of switch gear control panel room;Brick Masonry 9" in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc.,to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

76.86

9995

768216

... More
ReConstruction of switch gear control panel room;plastering to ceiling 12mm thick in two coats base coat of 8mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finish including cost and conveyance of all materials like cement , sand , water etc. to site , including seigniorage charges,sales & other axes on all materials , all operational,incidental and labour charges such as mixing motor , finishing, scafolding, lift charges, including cutting of grooves where ever necessary to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

182.88

479

87764

... More
ReConstruction of switch gear control panel room;plastering to ceiling 12mm thick in two coats base coat of 8mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finish including cost and conveyance of all materials like cement , sand , water etc. to site , including seigniorage charges,sales & other axes on all materials , all operational,incidental and labour charges such as mixing motor , finishing, scafolding, lift charges, including cutting of grooves where ever necessary as directed by Engineer - in - Charge curing etc. complete for finished item of work to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

180

874

157446

... More
ReConstruction of switch gear control panel room;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

644

476

306737

... More
ReConstruction of switch gear control panel room;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

610

864

527589

... More
ReConstruction of switch gear control panel room;Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

13.6

894

12168

... More
ReConstruction of switch gear control panel room;Flooring with polished shahabad stones ... mm thick set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc.,complete, including seigniorage charges, labour charges for dressing of flooring stones etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

90

745

67104

... More
ReConstruction of switch gear control panel room;Flooring with polished shahabad stones ... mm thick set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc.,complete, including seigniorage charges, labour charges for dressing of flooring stones etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

90

779

70164

... More
ReConstruction of switch gear control panel room;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2.88

1176

3387

... More
ReConstruction of switch gear control panel room;Painting to New walls with single coat of Snowcem cement paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

652.8

220

143877

... More
ReConstruction of switch gear control panel room;Painting to New walls with single coat of Plastic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

652.8

72

47459

... More
ReConstruction of switch gear control panel room;Providing and fixing of Two shutter Sliding Windows made of Galvanized Steel as per IS 513, D quality, galvanized as per IS 277 with powder coated with Pure polyester powder up to 50-60 microns thick with total coated thickness of 0.8 mm for Outer Frame and 0.58 mm thickness for Sliding Shutter Section, the Outer Frame for Two Tracks with Grill provision size of 90 mm x 50 mm and the Window Shutter section of 58 mm x 36 mm and the outer Frame with two integrated guide tracks of 12mm width and 24mm deep for provision to slide the Shutter / sash frame and facilitates with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of Aluminium 1 No. per each shutter including installation of window system at site using anchor fasteners, Silicon sealant applied at the Outer frame corners inclusive of conveyance of all materials accessories, labour charges, and erection at site with complete finished item of work.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

29.28

7127

208693

... More
ReConstruction of switch gear control panel room;S&F in position of fully panal doors with best seasoned MT wood frame of size 63.50mm x 101.60mm with single leaf shuuters flush type 35mm thick core black board type with commercially on both faces fixed doors frames fabricates cold rolled steel including all labour charges and supplying and fixtures as per standard drawing etc to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2

19879

39758

... More
ReConstruction of switch gear control panel room;S&F in position of fully panal doors with best seasoned MT wood frame of size 63.50mm x 101.60mm with single leaf shuuters flush type 35mm thick core black board type with commercially on both faces fixed doors frames fabricates cold rolled steel including all labour charges and supplying and fixtures as per standard drawing etc to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2

17644

35288

... More
ReConstruction of switch gear control panel room;Providing M.S. Grills to the windows with ISA 25 x25x4mm as window frame and 10 x 10mm sqr rods placed as per to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

0.16

112308

17969

... More
ReConstruction of switch gear control panel room;Painting to New/Old Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

19.2

123

2373

... More
ReConstruction of switch gear control panel room;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

376.56

427

160829

... More
ReConstruction of switch gear control panel room;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc.,to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

30.16

74150

2236364

... More
ReConstruction of switch gear control panel room;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

80

5217

417360

... More
ReConstruction of switch gear control panel room;Supply and Fixing of 25mm dia 1.50 mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned TW box including all labour charges etc., complete. Make : Sudhakar/ Maco Plast / Modi

370

87

32338

... More
ReConstruction of switch gear control panel room;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes : Finolex / L&T/ to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

106

594

63017

... More
ReConstruction of switch gear control panel room;Wiring with 2 of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in existing pipe with 6A switch control and 3/2 pin sockets fixing on separate board including all labour charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

250

368

92050

... More
ReConstruction of switch gear control panel room;Supply and run of 2 of 22/0.3mm (1.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

550

53

29370

... More
ReConstruction of switch gear control panel room;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

600

96

58140

... More
ReConstruction of switch gear control panel room;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

150

148

22245

... More
ReConstruction of switch gear control panel room;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2

4171

8342

... More
ReConstruction of switch gear control panel room;Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 10/16/20A SP MCB including internal connection and labour charges for surface / flush mounting etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

4

1710

6840

... More
ReConstruction of switch gear control panel room;Supply,Transportation and Fiaxing of 4'-40Watt box type flourpscent single Tubulight fiiting with Energy saving electronic ballast suitable for 40watt tube on varnished teak wood roundblaocks with flexible 3core wireetc,. to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

10

486

4868

... More
ReConstruction of switch gear control panel room;Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

8

3914

31312

... More
ReConstruction of switch gear control panel room;Supply of fresh air exhaust fan of Heavy duty 250V A.C.50Hz.. 300mm size (12") / 375 mm (15") 900 R.P.M etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

4

4626

18504

... More
ReConstruction of switch gear control panel room;Supply and Run of 2 of 10 Sq.mm WPTC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

120

132

15948

... More
ReConstruction of switch gear control panel room;Supply and installation of 800VA, 12VDC home UPS system pure sine wave out put, single phase input / Single phase output. Makes: Servomax / Top Power / Amar Raja / Samhitha / Microtech / Excide / Sucom.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2

8883

17766

... More
ReConstruction of switch gear control panel room;Supply and fixing of 12V, 150 AH MF battery including wire leads. Makes : Amar Raja (Power Zone) or Equivalent model of Exide / Panasonic / Gotech.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2

14548

29096

... More
ReConstruction of switch gear control panel room;2.0 / 1.8 TR 2-3 Star capable of delivering 21600 BTU/hr and above of makes Daikin / Thoshiba / O General / Carrier / Blue Star / Hitachi orequivalent to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

1

37935

37935

... More
ReConstruction of switch gear control panel room;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping.

50

949

47490

... More
ReConstruction of switch gear control panel room;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & Cost. Brick masonry in CM 1:6 prop. Intermediate chamber and fitted with 304.8 mm x 288.6mm (12"x9") C.I Frame and hinged cover

15

902

13532

... More
ReConstruction of switch gear control panel room;4"(101.6mm) Nahany Trap with Jali UPVC/SWR Pipe fittinfs

20

279

5590

... More
ReConstruction of switch gear control panel room;Supplying and Fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap

1

2780

2780

... More
ReConstruction of switch gear control panel room;Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996

1

2061

2061

... More
ReConstruction of switch gear control panel room;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cock

1

4015

4015

... More
ReConstruction of switch gear control panel room;Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-51994 on cantilever brackets with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 750 x 450 x 250

1

6908

6908

... More
ReConstruction of switch gear control panel room;Supply & fixing of PVC low level system parry ware, slim line with internal components & short bend: 10 Litres capacity Single Flush

1

2088

2088

... More
ReConstruction of switch gear control panel room;Supplying and fixing of Angle stop cock with wall flange jaquar continental series crome finished with 7years warrenty each

6

1447

8682

... More
ReConstruction of switch gear control panel room;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007(28.60MM dia)

100

267

26700

... More
ReConstruction of switch gear control panel room;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007(34.90mm dia)

25

363

9090

... More
ReConstruction of switch gear control panel room;Providing & Placing on Terrace (at all floor levels)polyethylene water storage tank with Double layerapproved brand & manufacture with cover and suitablelocking arrangement & making necessary holes for inlet &outlets and over flow pipes but without fittings & base support for tanks

1000

11

11400

... More
ReConstruction of switch gear control panel room;Supplying & fixing Bronze Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size

4

2966

11864

... More
ReConstruction of switch gear control panel room;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm

1

640

641

... More
ReConstruction of switch gear control panel room;110mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme or any ISI Brand TBSP-H.I-03

3

569

1707

... More
ReConstruction of switch gear control panel room;S&F 75mm dia CI cowl over septic tank

1

331

331

... More
ReConstruction of switch gear control panel room;S&F CP finish brass towel rod 600 mm long and 20 mm dia with brackets

1

496

497

... More
ReConstruction of switch gear control panel room;Supplying fixing of 4" dia 90 bend

2

220

441



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.