Irrigation And CAD Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Electrical and Electronics
Electrical Works
Opening Date28 Feb 2025
Closing Date7 Mar 2025
Tender Amount₹ 23,44,246 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Sub estimate for Electrification of Tandur Guest House;Supply of single mode SC / LC to SC / LC patch card of 2 Mtr length complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : D Link / AMP / Molex / Legrand / Krone.

3

3431

10294

... More
Sub estimate for Electrification of Tandur Guest House;Supply of Subscriber connector (SC) to SC / LC patch card of 1 Mtr length complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : D Link / AMP / Molex / Legrand / Krone.

4

2465

9862

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of 300mm x 260mm x 140mm No.16 gauge CRCA sheet box control cubicle panel / boxes etc., with hinged door and locking arrangements and din channel for fixing 2 Nos MCBs duly powder coated with matching colour of poles including cutting, bending drilling, welding and reveting cleaning with 7 tank process and painting etc., complete with fixing with necessary arrangments etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

5

2294

11473

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of single phase Electronic energy Meter, 240V AC, 50 HZ as per IS13010 up to 40A range with 200% over load capacity complete with connections etc., complete on the existing board complete as directed by the Engineer-in-Charge of work for the finished item of work.. Makes : CONZERVE / ELMEASURE / MECO / HPL / HAVELLS.

1

1681

1682

... More
Sub estimate for Electrification of Tandur Guest House;Supply and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification complete as directed by the Engineer-in-Charge of work for the finished item of work.. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM / Arraystorm / GM / Goldmedal.

60

602

36132

... More
Sub estimate for Electrification of Tandur Guest House;Labour charges for run of 50 Sq.mm 3.5 Core Cable. U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for earth connections for the cables complete as directed by the Engineer-in-Charge of work for the finished item of work.

20

57

1146

... More
Sub estimate for Electrification of Tandur Guest House;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

180

177

32022

... More
Sub estimate for Electrification of Tandur Guest House;Supply of 50 sq. mm. 3-50 core XLPE insulated, 1100V grade armoured alluminium cable with ISI mark as per specification confirming to IS:7098 (Part - I) complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Payal / RR kable / Beljin /Ollvin / Finecab / RPG / V - Guard / Orbit / Fortune Arrt / Gemscab / Bonton / SPM / Unistar / Windsor/ Avocab / Pawancab / Nakoda / Suncab.

180

647

116568

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of CAT-6 RJ-45 information outlets including dual face plate with all connections etc., Duel face plate complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : D Link / AMP / Molex / Legrand / Krone.

15

619

9285

... More
Sub estimate for Electrification of Tandur Guest House;Supply and laying of LAN cable Cat-6 (A) UTP CABLE in the existing metallic/non metallic conduit pipe with connections etc., complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes:D Link / AMP / Molex / Legrand / Krone.

150

52

7875

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of telephone jack type modular socket with top on modular MS box and with 4" x 4" sunglass decolam board with all connections etc., complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes: Gold Medal Olive / Million zoom.

20

587

11750

... More
Sub estimate for Electrification of Tandur Guest House;Supply and laying of 5 pair telephone COPPER wire in the existing metallic/non metallic conduit pipe with connections etc., complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes: Finolex / Delton / Surabi / Polycab.

100

50

5090

... More
Sub estimate for Electrification of Tandur Guest House;Supply and laying of 2 pair telephone 0.50 mm COPPER wire in the existing metallic/non metallic conduit pipe with connections etc., complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes: Finolex / Delton / Surabi / Polycab.

150

27

4125

... More
Sub estimate for Electrification of Tandur Guest House;Supply of Modular co-Axial socket type TV Antenna outlet complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina/ Gold Medal GIFA / GMZenova/ LK (L&T) - Englaze / Million M-Vee.

15

159

2387

... More
Sub estimate for Electrification of Tandur Guest House;Supply and transportation of 200 W +/-10% (>=20000 Lumens) LED Flood light Luminaire made of pressure die cast aluminum housing with powder coated, having toughened glass cover, Suitable lens on LEDs, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66 )protected, wide operating voltage range , P.F > 0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Driver surge protection >10KV,THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty complete as directed by the Engineer-in-Charge of work for the finished item of work. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA./ Capart / Fortune Arrt / FIEM / Arraystorm / GM / Goldmedal / Panasonic / Silicon / Leksa / Orient / HPL LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

4

17110

68442

... More
Sub estimate for Electrification of Tandur Guest House;Labour charges for erection of storage water heater with 2Nos Nylon / PVC / Metalic hose pipe etc., on wall duly making necessary fixing arrangments including connections etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

8

1429

11439

... More
Sub estimate for Electrification of Tandur Guest House;Supply and Transportation of stove enamelled storage / pressure type vertical / Horizontal water heater with copper tank 25 / 35 / 50 Ltrs. Capacity with non return valve on inlet side and dead weight pressure reducing valve on outlet side 230/ 250V, single phase 2000 watts heating element, thermostat control, fusible plug, pilot lamp etc., erected and tested complete with ISI specifications etc., including all materials, transportation, and labour charges complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : Crompton Solarium BLX / Jaquar Elena / Venus Lyra / Racold Eterno Swift / Racold Andris Lux Plus / AO Smith HSE SDS / AO Smith HSE SES / Havells Puro Turbo.

8

14758

118066

... More
Sub estimate for Electrification of Tandur Guest House;Supply and erecting wall mounting fan 400mm (16") / 450 mm (18") sweep A.C. 50Hz.. 1350 r.p.m oscillating type with regulator complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : Makes : Atomberg / Crompton / Orient / Havells / Halonix.

36

3572

128621

... More
Sub estimate for Electrification of Tandur Guest House;Supply and erecting fully automatic line voltage stabilizer for operation on input voltage 200 to 250V. rated for 1 KVA maximum load and time delay model with Volt meter, selector switch, 6A / 16A flush type, 5 pin socket for out put and with 3 core flexible chord and 3 pin 6/16A plug top suitable for refrigerator for continuous operation including cost and conveyance of all mateials and all labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : V-Guard / Real Guard / Uni Stab/ / ITL.

24

2181

52356

... More
Sub estimate for Electrification of Tandur Guest House;Labour charges for Installation of copper tubing between indoor and outdoor unit for split Air-Conditioner including foaming etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

10

69

695

... More
Sub estimate for Electrification of Tandur Guest House;Supply, Fabrication and installation of 38 x 38 x 6 mm (1.5" x 1-1/2" x 1/4") M.S. angle Iron frame suitable for condensing Unit for Split A.C including 2 Coats of Red oxide the followed by 2 coats enamel paint etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

10

1869

18694

... More
Sub estimate for Electrification of Tandur Guest House;Installation Charges for 1.5 / 2.0 Ton Split Air-Conditioner with foam, insulation for copper pipings connected for the Indoor and outdoor unit including testing and commissioning etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

10

1999

19996

... More
Sub estimate for Electrification of Tandur Guest House;Supply and Transportation of Inverter model cool type 2 Tonne split AC unit with high wall mounted 100% copper indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1 Phase AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units with 3.0 mts of copper piping, insulation kit and 4 mts of 3 core copper flexible chord (Voltage range 160- 264 volts) and cordless remote control with 5 years warranty and annual maintenance contract. 2.0 / 1.8 TR 5 Star capable of delivering 21600 BTU/hr and above with operating on refrigerant R-32 / R-410 Makes Daikin / Thoshiba / O General /Carrier / Blue Star / Hitachi complete as directed by the Engineer-in-Charge of work for the finished item of work.

10

62579

625791

... More
Sub estimate for Electrification of Tandur Guest House;Supply and erecting Electronic 2 Module Modular type Electronic Fan regulator for ceiling fans 1200 / 1400 mm sweep complete erected on existing board complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze.

32

738

23632

... More
Sub estimate for Electrification of Tandur Guest House;Supply and Transportation of 32-36W (>=3240 Lumens) Edge lit, 2' x2' (600mm x 600mm) slim panel LED luminaire Square Housing Made of Aluminum alloy with corrosion resistant powder coat, with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >90 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% with non integrated driver etc., complete with 5 years warranty with BIS Certification complete as directed by the Engineer-in-Charge of work for the finished item of work. LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec / FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

32

3158

101072

... More
Sub estimate for Electrification of Tandur Guest House;Supply and transportation of 24 Watts +/- 10% (>= 2400 Lumens) back lit LED down lights Recessed / Surface mounting round /square with housing made of Powder coated Pressure die cast aluminium housing with extended heat sink, with Protruded high efficiency diffuser, IP20, THD is less than 15% etc., complete with 5 years warranty with BIS with 5 years warranty with BIS Certification complete as directed by the Engineer-in-Charge of work for the finished item of work.. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells /Jaquar / IB LED / Panasonic / Halonix /HPL / Syska / Eveready / Surya / Keselec/ FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs.

38

1920

72964

... More
Sub estimate for Electrification of Tandur Guest House;Supply of 18 Watts LED Lamp with input voltage 90 to 300V, Colour temparature 3000k - 6500k, Beam angle 170 - 220 degrees, B22 base complete as directed by the Engineer-in-Charge of work for the finished item of work. Makes: Phillips / OSRAM / Crompton /Eveready / Bajaj / Havells / Pharox / Halonix / Greenlites / IB LED/ Jaquar / C&S / GM /FIEM / Gold Medal / Million / Syska.

38

284

10792

... More
Sub estimate for Electrification of Tandur Guest House;S/F of Concealed box PVC / MS with hook for fan complete as directed by the Engineer-in-Charge of work for the finished item of work.

10

156

1568

... More
Sub estimate for Electrification of Tandur Guest House;Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan complete as directed by the Engineer-in-Charge of work for the finished item of work.

32

214

6848

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of Bulk head fitting with cast Aluminium enamel painted body with water tight, clear glass with wire guard hinged with lock and key arrangements etc., complete with 50W lamp with input voltage 90 to 300V, Colour temparature 3000k- 6500k, Beam angle 170 - 220 °C, B22 base complete as directed by the Engineer-in-Charge of work for the finished item of work. MAKE : PHILIPS / OSRAM / GE / CROMPTON / BAJAJ / Keselec / Fortune Arrt / HALONIX / HAVELLS /HPL / SYSKA / SURYA / Arraystorm / GM /Goldmedal / Jaquar / Panasonic / Leksa / Orient.

4

2081

8325

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of fresh air exhaust fan of light duty 250 V A.C. 50 Hz.. 300 mm size ( 12 ") 1350 R.P.M Metallic body plastic blades, wire mesh,,including labour charges for fixing of exhaust fan in wall if necessary connections and masonary work of making hole , finishing etc., complete as directed by the Engineer-in-Charge of work for the finished item of work Makes : Crompton / Havells Ventilair-DB / Orient hill air

12

2934

35215

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of fresh air exhaust fan of light duty 250 V A.C. 50 Hz. 225 mm size (9") 1350 R.P.M Metallic body plastic blades, wire mesh, ,including labour charges for fixing of exhaust fan in wall if necessary connections and masonary work of making hole , finishing etc., complete. Makes : Crompton / Havells Ventilair-DB / Orient hill air complete as directed by the Engineer-in-Charge of work for the finished item of work.

6

2733

16403

... More
Sub estimate for Electrification of Tandur Guest House;Supply, Transportation of energy efficient fan, 1400 mm sweep, aluminium body, consuming 32 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle? kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMM/W) greater than 7.8, Air delivery minimum 270 CMM, 275 RPM( tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient complete as directed by the Engineer-in-Charge of work for the finished item of work.

6

4422

26537

... More
Sub estimate for Electrification of Tandur Guest House;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC) motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMM/W) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%, remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise = 75 degree C (max), insulation resistance m ore than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., complete.Makes : Atomberg (Efficio + ) / Havells / Orient / RR / Halonix complete as directed by the Engineer-in-Charge of work for the finished item of work.

25

3820

95508

... More
Sub estimate for Electrification of Tandur Guest House;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete. (0.104Kgs/1Mtr) complete as directed by the Engineer-in-Charge of work for the finished item of work.

20

29

584

... More
Sub estimate for Electrification of Tandur Guest House;Supply and Run of 25 mm x 6 mm G.I Strip including cost of all accessories and labour charges etc., complete. (1.18Kgs/1Mtr) complete as directed by the Engineer-in-Charge of work for the finished item of work.

5

180

905

... More
Sub estimate for Electrification of Tandur Guest House;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II). NOTE : Whenever providing full length of electrode is not possible due to the obstruction of water tube / rock, the length of electrode may be reduced and additional earthing may be done to meet earth resistance complete as directed by the Engineer-in-Charge of work for the finished item of work.

1

6635

6635

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of 8 Way VTPN DB with IP 43 Protection as per IS:13032 with 63A FP Isolator - 1 No for incomer, 6-32A TP MCB's - 4 Nos, 10kA-6-32A SP MCBs - 8 Nos for outgoing including internal connections and labour charges for FLUSH Mounting etc., complete.DB Makes : Legrand / Schneider / Siemens / L&T / Cabtree Xpro.MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree.MCCB Makes : Makes : L&T- D sine / Schneider-NS NSX/Legrand -DP X3/ Siemens-3V / Hager-h3 / C&S -Winbreak. complete as directed by the Engineer-in-Charge of work for the finished item of work.

1

30447

30447

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of (8+12) 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No., of 63A FP MCB 10KA, C/D Curve ISI Mark as incomer and 12 Nos 6-32 A 10 KA SP MCBs 10KA, C/D Curve ISI Mark as out goings including internal connections and labour charges for FLUSH Mounting etc., complete. (For Power DBs) DB Makes : Legrand / Schneider / Siemens / L&T / Cabtree Xpro. MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree. complete as directed by the Engineer-in-Charge of work for the finished item of work.

2

11348

22697

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of 8 Way SPN DB with IP 43 Protection as per IS:13032 with 1 No 40A DP MCB as Incommer, and 8 Nos of 30A SP MCB 10KA, C/D Curve ISI Mark as out goings, concealing in wall including internal connection and labour charges etc complete. DB Makes : Legrand / Schneider / Siemens / L&T / Cabtree Xpro. MCB Makes : Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora / Cabtree. complete as directed by the Engineer-in-Charge of work for the finished item of work.

3

6188

18566

... More
Sub estimate for Electrification of Tandur Guest House;Supply and run of 5 of 140/0.3mm (10 Sq.mm) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specifications for Copper cable. Makes : Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR)/ SPM (HFFR) / Sudhakar (HFFR) / Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR).. in existing pipe for mains continuity inlcuding all labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

25

932

23310

... More
Sub estimate for Electrification of Tandur Guest House;Supply and run of 5 of 84/0.3 (6-0 sq. mm. ) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. Makes : Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) /Ollvin(HFFR) /Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (HFFR) / Bonton (HFFR) and Avocab (HFFR) / Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) /Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) in existing pipe for Run of mains inlcuding all labour charges etc.,complete as directed by the Engineer-in-Charge of work for the finished item of work.

55

606

33336

... More
Sub estimate for Electrification of Tandur Guest House;Supply and run of 5 of 56/0.3 ( 4-0 sq. mm.) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. Makes : Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) /Ollvin(HFFR) /Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (HFFR) / Bonton (HFFR) and Avocab (HFFR) / Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) /Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) in existing pipe for Run of mains inlcuding all labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

65

444

28906

... More
Sub estimate for Electrification of Tandur Guest House;Supply and run of 3 of 56 /0.3mm (4-0 sq. mm.) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. Makes : Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) /Ollvin(HFFR) /Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (HFFR) / Bonton (HFFR) and Avocab (HFFR) / Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) /Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) in existing pipe for Run of mains inlcuding all labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

80

266

21344

... More
Sub estimate for Electrification of Tandur Guest House;Supply and run of 3 of 36 /0.3 mm (2-50 sq. mm. ) FRLSH / HFFR PVC insulated 1100V grade as per IS:694/1990, IS 17048 specification for Copper cable. Makes : Finolex / RR kabel / Havells /Polycab / Beljin (HFFR) /Ollvin(HFFR) /Finecab Gold (HFFR) / GM (HFFR) / Gold Medal (HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (HFFR) / Bonton (HFFR) and Avocab (HFFR) / Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) /Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) in existing pipe for run of mains inlcuding all labour charges etc.,complete as directed by the Engineer-in-Charge of work for the finished item of work.

210

175

36918

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of buzzer / Calling bell on 100 x 100 mm (4" x 4") decolam block including giving connections, cost of all accessories and labour charges etc., complete.. Makes for buzzer:Legrand Lyncus / GM Four Five / Million / Goldmedal Curve / Anchor Roma Plus / Crabtree Verona / Panasonic Vision / Hager Insista / Benlo Vesta / Polycab Levana / Salzar Elite / Elleys E-Soft / Fybros Four-X complete as directed by the Engineer-in-Charge of work for the finished item of work.

8

266

2131

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of Electronic Musical bell Makes : GM / Million / Gold Medal / Anchor /Great white. On 150x200 mm( 6" x 8") decolam block including giving connections, cost of all accessories and labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

6

484

2907

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of night lamp fixed at 30 cms height from floor level with 100 x 178 x 20 mm (4"x7"x3/4") wooden deep box, acrylic cover and pendent holder including cost of all accessories and labour charges etc., complete with 0.5W Led bulb. Makes for holder and LED :GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL. complete as directed by the Engineer-in-Charge of work for the finished item of work.

25

212

5305

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing ISI mark lamp holder / pendent holder in lieu of ceiling rose and 18 Watts LED Lamp point complete with all connections and all labour charges MAKES: Phillips / OSRAM / Crompton / Eveready / Bajaj / Havells / Halonix / Jaquar /C&S / GM / / FIEM / Gold Medal / Million / Syska. complete as directed by the Engineer-in-Charge of work for the finished item of work.

40

539

21560

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing ISI mark lamp holder / pendent holder in lieu of ceiling rose and without LED Lamp including all connections etc., complete . MAKES: Phillips / OSRAM / Crompton / Eveready / Bajaj / Havells / Halonix / Jaquar /C&S / GM / / FIEM / Gold Medal / Million / Syska. complete as directed by the Engineer-in-Charge of work for the finished item of work.

40

118

4744

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of modular type 20A 2 Module Modular Socket with shutter with 16A / 20A 1 Way 1 Module Modular Switch on 3 module cover frame with 3 module metal box covered board including earth connection & all labour charges on wall with cover frame of Makes : Legrand Arteor / Schneider Zen celo /Honeywell Blenge Plus / Crabtree Amare / LogusPlatina / Gold Medal GIFA / GM-Zenova/ L&T Englaze complete as directed by the Engineer-in-Charge of work for the finished item of work.

48

913

43834

... More
Sub estimate for Electrification of Tandur Guest House;Supply and fixing of 10A 3/2 Pin 2 Module Modular Socket with shutter with 6 / 10A 1 Way 1 Module Modular Switch control on a common switch board with earth continuity including wire leads, earth connections including cost and conveyance of all materials and all labour charges etc., complete. Makes of switches : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze complete as directed by the Engineer-in-Charge of work for the finished item of work.

37

490

18134

... More
Sub estimate for Electrification of Tandur Guest House;Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLSH / HFFR PVCinsulated 1100V grade as per IS:694/1990, IS17048 specifications for Copper cable. Makes for flexible copper wire : Finolex / RR kabel / Havells / Polycab / Beljin(HFFR/Ollvin(HFFR) / Finecab Gold (HFFR) / GM(HFFR) / Gold Medal(HFFR) / Million (HFFR) / KEI (HFFR) / V-Guard (HFFR)./ DEC (HFFR) / Bonton(HFFR) and Avocab (HFFR) / Fortune Arrt (HFFR) / SPM (HFFR) / Sudhakar (HFFR) / Nakoda (HFFR) / HPL (HFFR) / GLOSTER (HFFR) in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way 1 module Modular switch with required 6 module box and 6 module cover frame. Makes for modular switches and accessories and modular cover frame and module box : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina / Gold Medal GIFA / GM-Zenova/ L&T- Englaze. Makes for jumbo ceiling rose :GM G Home / Gold Medal Olive /Million Zoom / Anchor Penta Cherry / Great white Omega / HPL / Vimal / CPL. in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light and bell points in Non residential buildings complete as directed by the Engineer-in-Charge of work for the finished item of work.

110

1045

114994

... More
Sub estimate for Electrification of Tandur Guest House;Supply and Fixing of 25mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in wall outer dia medium grade, FRLS with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro with all required accessories including masonry work for light, fan and separate plug point and including all labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

160

118

18976

... More
Sub estimate for Electrification of Tandur Guest House;Supply and Fixing of 25mm dia 2mm thick P.V.C. pipe (ISI MARK) concealed in roof slabs outer dia heavy grade, FRLS with IS:9537 part 3 rigid PVC pipe. Makes : Sudhakar / Finolex / Modi / VIP / Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro with all required accessories including masonary work for light, fan and separate plug point and including all labour charges etc., complete as directed by the Engineer-in-Charge of work for the finished item of work.

23

110

2530



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.