Irrigation And CAD Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
520653Bid Award Id
ViewTender No
08/2024-25, Dt:20.06.2024Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and fixing 100mm dia perforated PVC Pipes 40cm long for weep holes including cost of all materials,labour,driling 8mm dia holes etc., complete with all leads and lifts as directed by the Engineer-in-Charge.
8
241
1930
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Supplying & fixing of C.I Drainage spouts with 50mmX150 Geneting with 100mm dia G.I Pipe for drainage of water as per drawing enclosed. including cost and conveyance of all material and labour charges etc, complete for finished item of work as directed by the Engineer-in-Charge.
6
1155
6931
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and fixing 20 mm thick high performance expanion joint filler board confirming to M.OS.T (for Roads and Buildings ) including cost and conveyance charges of all materials, labour charges placing at site of work in postion etc., complete as directed by the Engineer-in-Charge.
17
1078
18329
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and laying insitu M-35 (28 days cube compressive strength not less than 35 N /sqmm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data (Cement content: 420 kg / cum as per Building Data CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) over Approach Slab as directed by the Engineer-in-Charge.
2.2
6956
15304
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and laying insitu M-30 (28 days cube compressive strength not less than 30 N /sqmm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting,finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 m and all lifts.If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data (Cement content: 400 kg / cum as per Building Data,CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (over Deck Slab) as directed by the Engineer-in-Charge.
5.4
6826
36865
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and laying insitu vibrated M- 30 ( 28 days cube compressive strength not less than 30 N /sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded for Approach Slab including cost of all materials, machinery, labour, formwork, s, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 400 kg / cum ) If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data (Cement content: 400 kg / cum as per Building Data , CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) for Approach Slab as directed by the Engineer-in-Charge.
4.5
6529
29382
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts as directed by the Engineer-in-Charge.
8610
75
649194
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and laying insitu vibrated M- 25 ( 28 days cube compressive strength not less than 25 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Deck Slab & Kerb , bed block including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. ( Cement content : 380 kg / cum ) If water is to be brought from other place add only lead charges @ 500 ltr / cum. to the data (Cement content: 380 kg / cum as per IRR-DAW-2-19, CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (for Deck Slab, kerbs, Parapet) as directed by the Engineer-in-Charge.
85.4
11636
993769
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super structure works including cost of all materials, machinery, labour, formwork,scaffolding, cleaning, batching, mixing,placing in position, levelling, vibrating, finishing, curing etc., complete with initiallead upto 50 m and all lifts.(Cement content: 280 kg / cum,CA :0.90cum, Blending Ratio of CA--50:30:20,FA : 0.40 cum) as directed by the Engineer-in-Charge.
109.5
6791
743680
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard,graded aggregates for foundation filling including cost of all materials, machinery, labour,formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum, CA : 0.90cum,Blending Ratio of CA--50:30:20, FA : 0.40 cum) as directed by the Engineer-in-Charge.
83.5
6419
535995
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Providing & constructing Sand filling below foudation including cost of all materials, machinery, labour, watering, ramming etc., complete with initial lead upto 50 m and all lifts as directed by the Engineer-in-Charge.
56
2456
137575
... More
Re Construction of Existing Damaged Single Lane Road Brige (SLRB) at Km.6.550 on Chintriyala Major;Excavation for Structures- Mechanical Means ( Data adopted from MORTH) Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.( depth upto 3 meters)as directed by the Engineer-in-Charge.
520.5
123
64126
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements