For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date24 Jan 2025
Closing Date7 Feb 2025
Tender Amount₹ 44,88,920 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
O and M;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates foraggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

11.76

7612

89525

... More
O and M;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 90 percent or as stipulated using Sheep foot roller / Vibratory roller/ 2 tonne power roller etc.,to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

416.25

133

55611

... More
O and M;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal(100 mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (manual lining)to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

87.39

6572

574406

... More
O and M;Providing and laying insitu M- 30 ( 28 days cube compressive strength not less than 25 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Wearingcoat including cost of all materials,machinery, labour, formwork,, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

12.45

7188

89498

... More
O and M;Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 25 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork,, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

71.4

12316

879384

... More
O and M;Supplying & Fixing of High Performance Expansion Joint Filler board Confirming to IS:1838-20 MM THICK etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

11.46

1078

12356

... More
O and M;Providing and fixing LDPE sheet for bed and sides of canal including cost of all materials,labour, laying, joining etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

94

164

15472

... More
O and M;Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts.to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

6583

72

477926

... More
O and M;Providing and laying insitu M- 25 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates foraggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

1.53

8171

12502

... More
O and M;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

173.3

6997

1212736

... More
O and M;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge.

69.25

6038

418145

... More
O and M;Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material., .to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

515.46

124

63917

... More
O and M;Dismantling of Damaged stone masonry with cement motar/ cc lining

319.82

720

230366



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.