Irrigation And CAD Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Irrigation And CAD Department Tender
Civil And Construction
Bridge Construction
Opening Date20 Dec 2024
Closing Date27 Dec 2024
Tender Amount₹ 75,600
Costs
EMD
₹ 756Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
563588Tender No
55/EE/ID-1/SRD/2024-25 Dt: 16.12.2024Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
all materials ,labour,watering for minimum 15 days etc.,,complete.
-
-
-
... More
Providing pervious /semi-pervious casing for breached /damaged portion of embankment
-
-
-
... More
with soil from approved dump areas in layers of 10 to 15 cm before compaction including
-
-
-
... More
cost of all materials, machinery, labour, all operations such as collection of soil, sorting out,
-
-
-
... More
spreading soil to specified thickness, breaking clods, sectioning, watering, compacting each
-
-
-
... More
layer to density control of not less than 98 percent or as stipulated by rolling or by using
-
-
-
... More
mechanical tampers etc., complete with initial lead upto 1 km and all lifts.
-
-
-
... More
Providing and constructing contraction joints by fixing 23 cm wide central bulb type PVC water stop in single line supported by 10 mm dia steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, valcunising joints etc., complete with all leads and lifts.
-
-
-