Irrigation And CAD Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Irrigation And CAD Department Tender
Civil And Construction
Irrigation Work
Opening Date26 Mar 2025
Closing Soon4 Apr 2025
Tender Amount₹ 5,20,306
Costs
EMD
₹ 5,203Document Cost
Refer DocumentsTender Fee
₹ 185
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
584433Tender No
04/2024-25, Dt:10.03.2025Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Repairs to abutment of Check dam on Nerella Vagu, Raigudem Village,Dharmasagar Mandal, Hanumakonda D;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)(Levelling Course)
6.47
4947
32027
... More
Repairs to abutment of Check dam on Nerella Vagu, Raigudem Village,Dharmasagar Mandal, Hanumakonda D;Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion with reusing of stones from dismantled structure including cost of all machinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3m.
7.2
2803
20184
... More
Repairs to abutment of Check dam on Nerella Vagu, Raigudem Village,Dharmasagar Mandal, Hanumakonda D;Providing and constructing coursed rubble masonry second sort in CM 1:4 proportion with from approved source including cost of all materialsmachinery, labour, scaffolding, ramps, cleaning, packing mortar, wedging stone chips, finishing, curing etc., complete with initial lead upto 50 m and initial lift upto 3m.
10.8
4212
45493
... More
Repairs to abutment of Check dam on Nerella Vagu, Raigudem Village,Dharmasagar Mandal, Hanumakonda D;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm Before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning,etc., complete with initial lead upto 1 km and all lifts.
2863.75
127
363696
... More
Repairs to abutment of Check dam on Nerella Vagu, Raigudem Village,Dharmasagar Mandal, Hanumakonda D;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm Before compaction including cost of all materials, machinery, labour, all operations such as compacting to density control of not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 km and all lifts.
2863.75
9
26919
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%