Irrigation And CAD Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Civil Works Water Works
Transportation and Logistics
Opening Date3 Apr 2020
Closing Date28 Apr 2020
Tender Amount₹ 33,52,17,22,627 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. for canals, seating of embankment, filter drain / catch water drains etc., including levelling the bed by removing all projections by hammering / chiselling, cost of all materials, machinery, labour, placing the excavated rock neatly in approved dump area and levelling the same as directed etc., complete with initial lead upto 1 km and all lifts. (IRR-CAW-1-9a)

1640457.85

540038724

329.2

... More
Excavation in hard rock of all toughness including boulders above 1.2 m dia. by approved controlled blasting methods for canals, cut-off trench ofembankment, filter / catch-water drains etc., including controlling fly-rock by muffling arrangements such as placing 50 x 50 mm opening chain link mesh or waste tyres and sand bags, monitoring ground vibrations at specified locations,costof all materials, machinery, labour, placing excavated rock neatly in approved dump area or other place as directed etc., complete with lead upto 1 km and alllifts..(IRR-caw-1-10(b))

881450.2

421597630

478.3

... More
Excavation of Already excavated soil (i.e Rehandling of already excavted soil) including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto 1 km and all lifts. (IRR-CAW-1-1 X 50%)

791956

53179845

67.15

... More
Providing Semi-Pervoius/Pervois casing embankment using soil from approved borrow area in layers of 25 CM before compaction including cost of all materials, mcahinery, labour, all operaions such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compaction to denstiy control of not less than 98 percent as stipulated by sheep foot roller / vibratory roller/8 to 10 tonne power roller etc., complete with lead upto 1 Km and all lifts as directed by the Engineer-In Cheif (IRR-CAW-2-3)

29005.5

8156346

281.2

... More
Providing semi-pervious / pervious casing hearting embankment using soil collected in heaps in embankment area as part of disposal of excavated soil from canal including cost of all materials, machinery, labour, all operations such as sorting-out, spreading in layers of 25 cm before compaction, breaking clods, sectioning, watering and compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., as directed by the Engineer in charge complete with lead upto 1 km for water. (IRR-CAW-4-3)

29005.5

2134804

73.6

... More
Earth work excavation for tunneling with all associated works like roof bolts, shotcrete, permanent supports, ventilation, lighting etc., wherever required to complete the section up to Payline ( B-Line) including EGO at 2% extra. IRR-TAW-1-5

184620

393092904

2129.2

... More
Providing and laying 100mm thick insitu vibrated M-15 (28 days cube compressive strength-not less than 15.00 N / sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal lining using vibrating cylindertype mechanical paver including cost of all materials mechinery labour batching mixing placing in position forming contractiom joints fixing pvc joint seiling strips shifting of paver from one side of canal to other side etc.complete with all leads & lifts. (Cement content: 300 kg/cum for use of super plasticiser(0.4% by wt. of cement),CA : 0.80 cum, Blending Ratio of CA--65:35, FA : 0.44 cum) (IRR-CAW-7-8)

143283.76

115887905

808.8

... More
Laying and fixing of 100 mm Dia 300 mm long precast porus CC plugs in bed and sides using 1.181 Kgs of cement per each using 20 mm HG metal and placing in local filters of size 600x600x750 mm in size including Excavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts. IRR-CAW-5-7

2673.75

1675906

626.8

... More
Laying Longitudinal Drains and Transverse drains of Size 600 x600 x750 mm in Bed and filling with 12 mm to 40 mm HG machine Crushed metal and sand in bed including Excavation of drains and Cost of procuring of all materials including 50 m lead and for all lifts. IRR-CAW-5-6

3000

2508000

836

... More
Providing and forming 35 mm wide and 10 mm thick construction / contraction joints for concrete lining by mastic filler including cost of all materials, labour etc., complete with all leads and lifts. IRR-CAW-7-36

99087.9

2487106

25.1

... More
Providing and fixing 20 mm thick 150 mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts. IRR-CAW-7-35

9047.34

1006064

111.2

... More
Providing and fixing 50 mm dia perforated GI pressure relief pipes 45 cm long with one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes etc., as directed by the Engineer in charge complete with all leads and lifts. (IRR-CAW-7-21)

701

165436

236

... More
Excavation for Structures- Mechanical Means ( Data adopted from MORTH) Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Depth upto 3 m (IRR-CCDW-1-2)

546211.71

56095942

102.7

... More
Excavation in ordnary rock without blasting for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. IRR-CCDW-1-4

644700.22

84455728

131

... More
Excavation in ordnary rock (including HDR) without blasting including boulders above 0.3 m upto 0.60 m dia. for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. IRR-CCDW-1-3

984654.26

446639172

453.6

... More
Excavation in hard rock of all toughness by blasting including boulders above 1.2 m dia. For foundations of canal cross drainage and other appurtenant structures and placing the excavated rock neatly in specified dump area or stack yard as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m. IRR-CCDW-1-6

922405.63

604175687

655

... More
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., IRR-CCDW-2-3

130532.64

711376781

5449.8

... More
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. IRR-CCDW-2-8

38375.57

241363147

6289.5

... More
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., as directed by the Engineer in charge complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) (IRR-CCDW-2-8A)

9913.74

59016494

5953

... More
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. IRR-CCDW-2-9

79756.96

509463533

6387.7

... More
Providing and laying insitu vibrated Reinforced (M20) ( 28 days cube compressive strength not less than 20N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for backfilling works including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content:320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) (IRR-CCDW-2-7)

200319.4

1170606477

5843.7

... More
Providing and laying insitu vibrated M-25 ( 28 days cube compressive strength not less than 25 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. IRR-CCDW-2-24

426.03

4137134

9710.9

... More
Providing and laying insitu vibrated M-30 ( 28 days cube compressive strength not less than 30 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for deck slab & kerb including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. IRR-CCDW-2-24

139826.88

1391081698

9948.6

... More
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial lead upto 50 and all lifts. IRR-CCDW-2-1

11799.64

690278940

58500

... More
Providing and filling murum / gravely soil for foundation or above pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by power roller to achieve density control of not less than 98 percent etc., complete with lead upto 50 m and all lifts. (IRR-CCDW-7-3)

283400.68

134955403

476.2

... More
Providing and laying insitu M- 30 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat for deck slab including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., as directed by the Engineer in charge complete with initial lead upto 50 m and all lifts. (Cement content: 420 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (IRR-CCDW-2-26)

131.23

803350

6121.7

... More
Providing and laying insitu M- 35 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat for approach slab including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc.,as directed by the Engineer in charge complete with initial lead upto 50 m and all lifts. (Cement content: 470 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (IRR-CCDW-2-26)

61.89

397265

6418.9

... More
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., as directed by the Engineer in charge complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) (IRR-CCDW-2-10)

2022.51

12322546

6092.7

... More
VERTICAL LIFT GATES-EM PARTS Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elements etc., with all accessories for spillway stop log gates and other vertical lift elements including cost of all materials, machinery, labour, etc., as directed by the Engineer in charge complete as per specifications and approved drawings. (IRR-GAW-2-1) (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as per scedule of rates under items in this chapter and add as applicable separately)

460

80619370

175259.5

... More
vertical lift gates and stop log gate elements ( SLIDING GATES) Design, fabrication, supply, erection, testing and commissioning of vertical lift gates and stoplog gate elements, consisting of skin plate,horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks/bearings, guide shoes, rubber seals, clamps etc., with all accessories including cost of all materials, machinery, labour, seal fixing etc.,complete as per specifications and approved drawings (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately) IRR-GAW-2-2

704

102057683

144968.3

... More
VERTICAL LIFT GATES-ROPE DRUM HOIST UPTO 30 TON CAP. POWER OPERATED Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electro-magnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc.,with all accessories for operating river sluice / canal sluice service gate including cost of all materials, machinery, labour, , complete as per specifications and drawings with all leads and lifts (without painting on sand-blasted or mechanical cleaning surfaces which are added extra as perscedule of rates under items in this chapter and add as applicable separately)

460

31756192

69035.2

... More
Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts. IRR-CAW-7-23

66

13919

210.9

... More
Conveying and fixing elastomeric bearing for spillway bridge including cleaning and preparing surface, mixing and applying adhesive, fixing bearing in correct position etc., including cost of all materials except bearings, machinery, labour etc., complete with all leads and lifts.IRR-DAW-2-15

224

97350

434.6

... More
Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, machinery, labour, watering, ramming etc., as directed by the Engineer in charge complete with initial lead upto 50 m and initial lift upto 3 m. (IRR-CCDW-7-1)

289118.53

496271956

1716.5

... More
Dewatering

260950

3548920

13.6

... More
Dewatering

260950

5140715

19.7

... More
Dewatering

31219.07

9318892

298.5

... More
Providing, fabricating and fixing in position permanent structural steel supports as per details including cost of all materials, machinery, labour, cutting, bending, welding, grinding, lighting,ventilation, drainage and all other ancillary operations etc., complete with initial lead upto 1 km and all lifts. IRR-TAW-3-3

300

27616410

92054.7

... More
Supply and Erection of Semiportal crane for lifting emergency stoplog gate - 80T Capacity

1

25000000

25000000

... More
Supply and Erection of Semiportal crane for lifting emergency stoplog gate - 45T Capacity

1

15000000

15000000

... More
Supply and Fixing of PVC Rubber Water stoppers 310mm wide

418

944680

2260

... More
Providing and fixing 20mm thick depth tarfelt expansion joint at 35m interval boards forcement concrete lining of canal including cost of all materials, labours etc., complete (IRR-CAW-7-34)

98

7477

76.3

... More
Proving Fabrication and Erection at site secondary structural steel MS sections consisting of Purlins, Girts, eave struts, wind bracings, flange bracings, base angles, clips and other miscellaneous structural parts. Purlins, Girts and eave struts shall be cold formed pre-galvanized (275 GSM) steel which has a minimum yield strength of 345 Mpa and will confirm to the physical specification of ASTM A -607 (Grade 50 or equivalent) and all other miscellaneous secondary members shall have a minimum yield strength of 250 Mpa, including cost & conveyance of all materials , erection , fixing in position wastage all labour charges, all incidental, hire and operational charges of equipments, tools and plants, getting temporary power supply, design and drawing preperation charges, etc., complete for finished item of work

869.37

79760524

91745.2

... More
Supply and Erection of Bolts, Nuts, self drilling screws etc for PEB Shed as per SSR Sl.No. 55

12

900000

75000

... More
Manufacture, Supply, installation & Transportation to to the site of 0.5mm colour coated galvalume sheeting material for profiled for roofs as per the technical specifications including including all fasteners, sealants, etc complete. The supply shall also include all required flashings, trims, gutters and down spouts to ensure a weather tight building. Roof sheets and wall cladding shall confirm to the specifications of ASTM A 792 with AZ- 150 with 25 micron silicone modified pain coating and having minimum yield strength of 550 Mpa. Standard fasteners shall be No. 14, Type A, self tapping sheet metal screws with metal and neoprene washers. All screws shall have hexagonal heads, be color coated to match roof and wall sheeting and made of zinc plated steel. Sealant tape shall be applied at all side laps and end laps of roof panels and around self flashing windows. Sealer shall be 6 mm wide x 5 mm thick, non-asbestos fiber filled pressure sensitive Butyl tape. The sealer shall be non-asphalted, non-shrinking nondrying and nontoxic and shall have superior adhesion to metals, plastics and painted surfaces at temperatures from – 51 deg. `C’ to + 104 deg.`C’. Solid or closed cell E.T.P. (Ethylene Polypropylene Terpolymer) closures matching the profile of the panel shall be installed along the eaves, rake and other locations as specified including cost and conveyance of all materials to site, erection, fixing in position wastage and all labour charges, all incidental, hire and operational charges of equipments, tools and plants, getting temporary power supply, design and drawing preperation charges, etc., complete for finished item of work . For Roof & Wall panel skin wall panels with 0.5 mm thick colour coated galvalume material (As per SOR TSBC-R.1-39)

14375

10421875

725

... More
Providing and fixing of wind driven turbo ventilators, throat dia 600 mm and shaft made out of stainless steel (grade of SS 304), with tandum ball bearing system etc., inclusive of all taxes except GST etc., including all operational, incidental and labour charges, over head charges and contractor profit, complete as directed by the Engineer -in -charge for finished item of work.(As per SOR ELEC-5.1.8)

80

529600

6620

... More
Providing and fixing of Polycarbonate of 2mm thick sky lighting at roofing for natural lighting inclusive of all taxes except GST etc., including all operational, incidental and labour charges, over head charges and contractor profit, complete as directed by the Engineer -in -charge for finished item of work,. (As per SOR TBSC-D.VI-1)

120

153120

1276

... More
Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections for two or more openable shutters 75 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding.The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC and accessories for casement window – friction hinges of stainless steel grade 304/430- 2 Nos., per sash, handle with zamak alloy casting 1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site , overhead charges & contractor profit all taxes except GST etc., complete for finished item of work. (As per SOR TBSCM.1-02)

100

669700

6697

... More
Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40mm with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm.,including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overhead charges & contractor profit, all taxes except GST etc., complete for finished item of work (As per SOR TBSC-MIII-01)

25

173550

6942

... More
Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track–2 Panel Sliding Doors duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 45 mm x 2.20 mm with reinforcement of 1.2 mm thickness, super sash with overall size of 39 mm x 75 mm x 2.20 mm with for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of bent handle espagulate .the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site, overhead charges & contractor profit including all taxes except GST. etc., complete for finished item of work (AS per SOR TBSC-LIII-09)

42

239274

5697

... More
Supplying and fixing of stainless steel ( grade 304 ) hand railing of height as per approved drawing with top rail of 50mm dia pipe and 2mm thick medium class and vertical posts of 25mm dia and 1.6mm thick medium class 2 Nos for each step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 20mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly , lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges , overheads & contractors profit, all taxes except GST etc., complete for finished item of work. (As per SOR TBSC-EIII-01)

1568.51

607013

387

... More
Supply , manufacture, making to specified design including Labour charges for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position, all incidental, operational, labour charges all taxes except GST etc., complete for finished item of work (As per SOR TBSC-T.1-16= Rs.26 +steel charges as per 62 (a)=41 (total=26+41=67))

4650

306900

66

... More
Supply and fixing of galvalume sheet for rain water down take pipes of 150 mm square, including bends, inspection lid,clamps,fiitings in all heights and the cost and conveyance of all materials, leads and labour charges etc, inclusive of all taxes except GST etc., including all operational, incidental and labour charges, over head charges and contractor profit, complete as directed by the Engineer -in -charge for finished item of work. (AS per SOR TBSC-D.VI-05)

1323.75

512291

387

... More
Providing and fixing of aluminum Louvers of size 2440 X 610 mm including all necessary fittings to side cladding sheet/members etc., inclusive of all taxes except GST etc., including all operational, incidental and labour charges, over head charges and contractor profit, complete as directed by the Engineer -in -charge for finished item of work. (As per SOR TBSC-M.III-01)

50

347100

6942

... More
Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity porcelain flushing tank with lid, internal components and fixed using required size of nails and screws, 2nos of teak wood blocks of size 76.2x101.60m, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, all labour charges, overheads & contractors profit etc., all taxes, except GST, complete for finished item of work for all floors. (As per SOR TBSC-M.II-05)

30

351900

11730

... More
S&F S&F CP finish steel towel rod of 600 mm long and 20mm dia with brackets including cost and conveyance of all materials to site, all opertaional and incidental charges, all labour charges, overheads & contractors profit etc., all taxes, except GST, complete for finished item of work. (AS per SOR TBSP-F-VII-10)

60

21720

362

... More
Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar 550x400mmTap of 1st quality Indian make 400gms of Seiko/Senior/nice/ESSO or any approved brand heavy duty complete with standard CI brackets including wooden blocks ,1 No.15mm PVC connection with brass union nuts CP coated, 15 mm brass CP finish angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 40 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges, overheads & contractors profit, all taxes except GST for finished item of work

20

58340

2917

... More
Supplying and fixing white glazed flat back half stall urinals of size 590 mm x 375 mm x 390 mm 1st quality conforming to IS:2556-1995 with standard C.P. Spreader fixed with screws complete Indian make (HSW/Parry/Neycer) as approved by Engineer-in-charge, including supply and fixing 15 mm nominal size PVC connection with brass union nut C.P coated, 15 mm brass body CP finish self closing tap push type conforming to IS 1711, 40 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges overheads & contractors profit etc., all taxes, except GST complete for finished item of work for all floors.

30

77040

2568

... More
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes pressure rating 10 kg/cm2 for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in TG excluding Taxes etc. including cost and conveyance of all materials to site, all opertaional and incidental, all labour charges, overheads & contractors profit etc., all taxes, except GST, complete for finished item of work. Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice.SHAFT / TERRACE / BASEMENT CEILING (150*3+40*3+6*3)

588

148176

252

... More
S & F Bronze Ball valve with SS Ball and SS Spindle as per IS - Class -I, Indian make heavy type including cost and conveyance of all materials to site, all opertaional and incidental charges, all labour charges, overheads & contractors profit etc., all taxes, except GST, complete for finished item of work

50

34200

684

... More
Formation of Wet mix Macadam (WMM) 250mm thick compraising of 2 layers of each 125mm thick as per the technical specification complete for the finished item of work

5210

10572653

2029.3

... More
Prime Coat with bitumen emulsion of 0.6 Kg/Sqm including mchinery, material etc., complete for finished item of work

17000

639200

37.6

... More
Tack Coat with bitumen emulsion of 0.2 Kg/Sqm including mchinery, material etc., complete for finished item of work

17000

164900

9.7

... More
Dense bituminous macadam (DBM) of 90mm thick over the WMM layer as per the technical specification and drawings complete for finished item of work

1530

10758807

7031.9

... More
Bituminous concrete of 40mm thick over the DMM layer as per the technical specification and drawings complete for finished item of work

680

5423748

7976.1

... More
Providing and constructing 25cm thick dry rubble stone piching including cost of all materials, labour, hand packing,finishing etc., complete IRR-CAW- 8-4

64.5

28309

438.9

... More
Shortcreting in two layers (each layer+38 mm thickness) for slabs duly fixing chain weld wire mesh 100 x 100x5 mm in between the two layers including cost and conveyance of all materials, labour charges, all heads, lifts, centering, scaffolding, machine mixing, laying concrete with shortcrete machine etc. complete as per specification and as directed by Engineer-in-Charge

7972.2

12150430

1524.1

... More
Providing and fixing 25 mm diameter steel rock bolts with mechanical / wedge type anchorage including drilling 35 mm dia holes, providing 15 cm long 20 mm thick steel tapered wedge, 10 mm thick plate washers and nuts, tightening bolt by torque wrench, cost of all materials, machinery, labour, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts.

23003.33

26877090

1168.4

... More
Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 40 mm and down size approved clean, hard, graded aggregates crushed from tunnel muck for sides and arch lining including cost of all materials, machinery, labour, formwork, batching, mixing, conveying upto placing point in agitator cars, placing in position, levelling, vibrating, finishing, curing, ventilation, lighting, drainage and all other ancillary operations etc., complete with lead upto 1 km and all lifts. IRR-TAW-5-4

72192.56

542079494

7508.8

... More
Dewatering tunnel by pumping out water collected by natural drainage inside tunnel including providing sump wherever necessary, cost of all materials, machinery, labour, drainage, lighting, ventilation and all other ancillary operations etc., complete as directed by the Engineer in charge. (IRR-TAW-2-1)

184620

5261670

28.5

... More
Cost of pipe of 3.8 m dia with 28 mm thick Design,fabrication,supply,erection and commissioning of delivery mains with all accessories including cost of all materials, machinery, labour etc.,as directed by the Engineer in charge complete as per specifications and approved drawings.

53200

12795743800

240521.5

... More
Laying, Jointing and commissioning of M.S.Pipe of 3.8M Dia of 28mm Thick as Per Approved drawing, Hydraulic felid Test pressure including cost of lowering ,Site welding ,Jointing materials and cost of transportation of water including Emptying pipe line after completion of Field testing etc.,including cost of conveyance of all material to the site for complete item of work as per specification and drawings and as directed by Engineer-in-Charge

51200

545228800

10649

... More
Providing and fixing 25 mm dia 2.50 m long cold twisted deformed steel anchor rods with 1.25 m length driven into 32 mm dia hole drilled in bed rock and remaining length embedded in concrete / masonry including cost of all materials, machinery, labour, drilling and cleaning hole, driving anchor rod, grouting hole with thick cement slurry etc., as directed by the Engineer in charge complete with initial lead upto 50 m and all lifts. (IRR-CCDW-1-8)

722

675214

935.2

... More
Supply ,Erection and Commisioning of Pump and Motors With Required Discharge with all Associated works for Electro Mechanical & Hydro Mechanical

500

9920443000

19840886

... More
O&M for Electro Mechanical @ 1.00% per year for 13 years after 2 years of DLP

13

1289657590

99204430

... More
O & M for civil works and Pipe line works@ 0.10% per year for (3) years after 2 years of DLP

3

68841639

22947213.12

... More
Francis turbine pump with associated auxiliaries suitable to connect to 125 MW Motor (Synchronous Motor) Including B/F Valve

4

3400000000

850000000

... More
Synchronous Motor with exicitation system and associated auxiliaries (125 MW).

4

3000000000

750000000

... More
a) Microprocessor based control monitoring system for pump-motors

5

75000000

15000000

... More
b) Microprocessor based Control, Protection and Monitoring system for all other common equipment

1

15000000

15000000

... More
Protection Panels & Auxilaries Panels.

5

40000000

8000000

... More
Segregated Phase Busduct and other associated equiment of busduct

4

160000000

40000000

... More
Unit Auxiliary Boards (A.C distribution Boards)

5

25000000

5000000

... More
D.C Distribution Board

5

25000000

5000000

... More
a) 11 KV Cables (XLPE)

1

250000000

250000000

... More
b) L.T. Power Cables

1

120000000

120000000

... More
c) Control Cables including cable trays laying of cables etc.

1

100000000

100000000

... More
d) Instrumentation Cables

1

80000000

80000000

... More
SFC Starting Isolators for 4 pumps, one spare including SFC Interconnecting system cables between SFC system and SFC Isolators

6

90000000

15000000

... More
Miscellaneous items

1

30000000

30000000

... More
Spares @ 10% of Total value equipment cost

1

741000000

741000000

... More
T&P @ 1% of Total value equipment cost

1

74100000

74100000

... More
Frieght & Insurance @1% of Equipment cost including Spares and T & P

1

82251000

82251000

... More
Erection, Testing and Commissioning @14 % of Total value equipment cost

1

1037400000

1037400000

... More
11 KV Cubicle, One Board with a) 2 Nos. 2000A Incoming feeder from 10/15 MVA Transformer. i) 1 No. 2000A Buscoupler b) Out going feeders i) 3 Nos. 2000A Outgoing Feeders for SFC system ii) 5 Nos. 150A feeders UATs and SATs iii) 2 Nos. 2000A feeders for capacitors along with capacitor banks

1

25000000

25000000

... More
a) 220V, 800AH D.C Battery with Battery Charger

1

10000000

10000000

... More
b) Common D.C D.B

1

7500000

7500000

... More
415V Boards with following SABs (SAB-1, SAB-2 & SAB-3)

1

8000000

8000000

... More
415V Boards with following Emergency Board

1

5000000

5000000

... More
Compressor Equipment .,OPU system compressors one sets each with main & standby

2

10000000

5000000

... More
Compressor Equipment , Compresser system for water depression system one set with main & stadnd by

2

15000000

7500000

... More
Drainage & Dewatering Equipment (4 Nos. Dewatering pump-motors and 2 Nos. Drainage Pump-motors and 2 Nos. Submersible pumps for emergency dewatering in case of flooding)

1

25000000

25000000

... More
SFC Starting equipment (One main & other as standby)

2

110000000

55000000

... More
Lighting

1

10000000

10000000

... More
Air Conditioning & Ventilation System

1

20000000

20000000

... More
Communication System Panels

1

7500000

7500000

... More
E.O.T Crane 120/25 Tons

1

45000000

45000000

... More
Pump House Earthing including material supply

1

12500000

12500000

... More
415V D.G. Set 500 KVA with AMF Panel (1 Set)

1

6000000

6000000

... More
Fire Protection System

1

10000000

10000000

... More
Station Transformers 20/25 mva 400kv/11kv with on load tap charger

1

35000000

35000000

... More
Auxiliary Transformers Two Nos. Unit Auxiliary Transformer, dry type 2000 KVA, 11KV/415V (Indoor type)

2

40000000

20000000

... More
Auxiliary Transformers One No. Unit Auxiliary Transformer, oil filled type 500 KVA, 11KV/415V (outdoor type)

1

5000000

5000000

2

10000000

5000000

... More
Mobile crane (80 Tons capacity, Tyre mounted)

1

30000000

30000000

... More
Miscellaneous items

1

10000000

10000000

... More
Spares @ 10% of Total value equipment cost

1

45650000

45650000

... More
T&P @ 1% of Total value equipment cost

1

4565000

4565000

... More
Frieght & Insurance @1% of Equipment cost including Spares and T & P

1

5067000

5067000

... More
Erection, Testing and Commissioning @14 % of Total value equipment cost

1

63910000

63910000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.