Irrigation And CAD Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Civil And Construction
Irrigation Work
Opening Date1 Aug 2024
Closing Date16 Aug 2024
Tender Amount₹ 65,03,293 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Revival of Siddulakunta;Providing, fabricating and placing in position reinforcement steel for RCC,below 36 dia rods overlaps and wastages wherever required, tying with 1.25 mm diameter soft annealed steel wire, including cost of all materials, machinery, labour etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2.6

69078

179603

... More
Revival of Siddulakunta;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for well kerb including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

57.14

9179

524485

... More
Revival of Siddulakunta;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

6.45

7010

45200

... More
Revival of Siddulakunta;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

60.75

6355

386066

... More
Revival of Siddulakunta;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

60.45

5452

329562

... More
Revival of Siddulakunta;Manufacturing , supply ,erection of MS pipes and pipe specials with MS sheet of required thickness including cost of MS sheet for pipes, MS plate for flanges as per ISI, cutting,bending, rolling, welding, fabrication including, transportation to site ,laying in position aligning, jointing,welding if necessary at site including cost of jointing materials like bolts and nuts rubber packing, painting with one coat of red oxide and including cost and conveyance of all materials, labour charges etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

152.49

130

19870

... More
Revival of Siddulakunta;Manufacture, supply, delivery and fixing of Single Chamber 100mm dia PN-10 DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the dept.Including packing and transportation charges to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2

57128

114256

... More
Revival of Siddulakunta;Lowering, laying, jointing and testing to hydralic test pressure including cost of water with minimum water lead of 500m for UPVC pressure pipes in ready made trenches true to alignment and gradient including all sundries but including cost & conveyance of pipes from source of supply and jointing materials to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

1310

2945

3857950

... More
Revival of Siddulakunta;Providing & constructing Sand filling below foudation including cost of all materials, machinery, labour, watering, ramming etc., to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

176.85

1246

220444

... More
Revival of Siddulakunta;Excavation for Structures- Mechanical Means Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete with all leads and lifts and all other operations necessary to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

2122.2

272

578936

... More
Revival of Siddulakunta;Excavation for Structures- Mechanical Means Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material etc., complete with all leads and lifts and all other operations necessary to complete the finished item of work as per drawing or as directed by the Engineer-in-Charge

86.24

124

10694



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.