For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Irrigation And CAD Department Tender
Civil And Construction
Excavation
Water Storage And Supply
Opening Date7 Feb 2025
Closing Date14 Feb 2025
Tender Amount₹ 4,39,27,840
Costs
EMD
₹ 4,40,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574245Tender No
02/2024-25, Dated: 13-08-2024Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Formation of New Tank;Manufacture, Supply and Delivery of R.C.C. Socket and Spigot 900mm dia NP3 Class (SSP) type pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) including transportation, taxes & duties and as per drawing or as directed by the Engineer - in -charge.
28
8812
246747
... More
Formation of New Tank;Manufacture, Supply and Delivery of R.C.C. Socket and Spigot 600mm dia NP3 Class (SSP) type pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) including transportation, taxes & duties and as per drawing or as directed by the Engineer - in -charge.
30
4172
125170
... More
Formation of New Tank;Providing impervious hearting embankment with selected soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
1968
265
522307
... More
Formation of New Tank;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
10576.7
132
1402470
... More
Formation of New Tank;Providing, fabricating and placing in position,reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, ooking, lapping, welding wherever required,tying with 1.25mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
1698
74
127282
... More
Formation of New Tank;Providing and constructing rockfill embankment with 300 mm down graded stones and quarry spalls from approved source including cost of all materials, machinery, labour, spreading stones and spalls in layers, hand packing, wedging, finishing the surface to required slopes etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
850
676
575195
... More
Formation of New Tank;Providing and constructing 150 mm dia hume pipe weep holes for concrete / masonry walls including providing 20 x 20 x 20 cm size porous concrete block made of cement and 20 mm down coarse aggregate in 1 : 4 proportion including 10 cm thick sand backing at the junction of wall and soil back fill, cost of all materials, machinery, labour etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
21
553
11629
... More
Formation of New Tank;Providing and laying insitu M- 20 ( 28 days cube compressive strength not less than 20 N / sqmm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
30.7
6163
189208
... More
Formation of New Tank;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
563.3
7249
4083902
... More
Formation of New Tank;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
820.62
6095
5001679
... More
Formation of New Tank;Providing and constructing graded filter media below and behind rock-toe consisting of 30 cm thick, 80 -20 mm size graded coarse aggregates satisfying filter creteria as per specifications including cost of all materials, labour, machinery, laying to required slope,compaction etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
266
1303
346784
... More
Formation of New Tank;Providing and laying sand blanket below embankment including cost of all materials, machinery, labour, spreading to specified thickness etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
3598
1404
5052599
... More
Formation of New Tank;Providing and constructing 225 mm thick dry rubble stone pitching including cost of all materials, labour, hand packing, finishing etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
16354
302
4942506
... More
Formation of New Tank;Providing and constructing dry rubble rock-toe using rubble and stone chips from approved source including cost of all materials, machinery, labour, hand packing rubble and stone chips, finishing top and sides to required slopes etc., complete complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
1848
806
1490042
... More
Formation of New Tank;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent or as stipulated using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
12970.4
214
2780854
... More
Formation of New Tank;Providing casing embankment using semi-pervious soil available from excavation in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all other operations such as re-excavation, sorting out, transportation, spreading in layers of specified thickness, breaking clods, sectioning, watering, compacting to specified density control of not less than 98 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
60987.5
177
10794788
... More
Formation of New Tank;Providing cut-off trench filling using selected impervious soil from approved borrow areas in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil to specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent using Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller as stipulated etc., complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
3975
225
895568
... More
Formation of New Tank;Excavation for foundation in ordinary rock (including HDR) without blasting including boulders above 0.3 m upto 0.6 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil/material neatly in dump area or disposing off the same including cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc.,complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
4155
218
907452
... More
Formation of New Tank;Excavation for foundation in all kinds of soil including boulders upto 0.3 m diameter for dam, spillway, intake structure and other appurtenant works and placing the excavated soil/material neatly in dump area or disposing off the same including cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc.,complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
21937.48
165
3639428
... More
Formation of New Tank;Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all leads and all lifts including cost of all materials, machinery, labour as directed etc.,complete with all leads and lifts and as per drawing or as directed by the Engineer - in -charge.
50400
8
438480