Irrigation And CAD Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Irrigation And CAD Department Tender

Works
Civil And Construction
Opening Date5 Sep 2023
Closing Date22 Sep 2023
Tender Amount₹ 14,68,371 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Provision to wards shuttring arrengement OT Sluice Shutters for Below 5Tone capacity (small gates) Asper Guidelines of Chief Engineer, Central Designs Organization, Hyderabad specification dwawing for Krisna delta system fabrication,supply ,erection,testing and commissioning of sluice shutters, consisting of skin plate, horizontal and vertical angles,stiffners rubber seal, clamps with all accessories for sluice shutters including cost of all materials, machinary,labour,seal fixing ect..complete as per specifications and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items as directed by the Engineer-in charge.

0.07

279283

19549.86

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;OT SLUICE SHUTTERS EM Parts for Below 5 Tons capacity (small gates) As per Guidelines of Chief Engineer, Central Designs Organization, Hyderabad Specification drawing for Krishna Della System, Fabrication, supply, erection, testing and commissioning of Embedded parts consisting of sill beam, side tracks, seal seats, Guide plates etc., with all accessories including cost of all materials, machinery, labour etc., complete as per specifications and approved drawings (without painting on mechanical cleaning surfaces which are added extra as per schedule of rates under items in this chapter and add as applicable seperately)

0.23

118012

27615.02

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;300mm Dia spigot & Socket Pipe cost of material & Conveyance

10

691

6914

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Laying and jointing 300 mm dia NP-2 class of IRC standard hume pipes in CM 1:2 proportion by volume including cost of all materials (excluding pipes and collars) machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50m and all lifts (Cement content 9.9 Kg/joint FA: 0.01 cum/joint Help Yam: 0.091kg/joint)

2

477

954

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as compacting to density control not less than 90 percent or as stipulated using 2T roller etc., complete with initial lead upto 1 Km and all lifts.

4036.5

9

37539.45

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as compacting to density control not less than 95 percent or as stipulated using 8T roller etc., complete with initial lead upto 1 Km and all lifts.

192

61

11712

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as transportation, spreading soil in layer of specified thickness, breaking clods, excavation, sorting out, sectioning etc., complete with initial lead upto 1 Km and all lifts.

4228.5

180

764512.8

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)

28.25

6320

178551.3

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Providing and laying insitu vibrated M-10 (28 days cube compressive strength not less than 10 N/ Sqmm) grade cement concrete using 40mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, leavelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts (Cement content 220 Kg/cum with use of super plasticiser (0.4% by wt. of cement) CA: 0.90 cum, Blending Ratio of CA-50:30:20, FA:0:40 cum)

10.23

5595

57253.64

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Excavation for structures - Machanical Means, Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

88.23

123

10870.18

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Dismantline of stone masonry in cement mortar (Disturbed and damaged condition) including conveyance of all materials and labour charges etc.,

28.56

600

17136

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Excavation in all kinds of soil including boulders upto 0.30 m dis for field channels, sealing of embankment for field channels etc., including dressing of bed and sides to required profile, cost of all materials, machinery, labour, placing the excavated stuff for formation of service road / embankment as directed etc., complete with lead upto 10 m and lift upto 3 m

2783.75

70

196254.38

... More
bund strengthening removal of silt construction of slab culvert at Km 1 470 on Feeder channel to;Clearing thick jungle growth (Less than 50 percent open space) including bushes upto 30cm/ Parthenium and other weeds including burning or disposing off the same as directed etc., complete.

19300

3

67550



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.