Irrigation And CAD Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 320
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
415229Bid Award Id
ViewTender No
03/2023-24 Dt 08.05.2023Tender Authority
Irrigation And CAD Department ViewPurchaser Address
-Website
http://https://irrigation.telangana.gov.in/icad/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 44.6 kg / joint, FA : 0.045cum/joint, Hemp Yarn : 0.34kg/joint)
4
456
1826.8
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Manufacture, Supply and delivery of 300 mm dia NP2 class RCC socket and spigot and spigot pipes including transportaion charges etc and as directed by the Engineer in charge
12.5
572
7155
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
12.28
5437
66766.36
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Excavation for Structers- Mechanical Means (Data adopted from MORTH ) Earth work in excavation in all kinds of foundation of structures as per drawing and technical specification including setting out. Construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material depth upto 3 meters)
119
120
14303.8
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Providing and laying insitu vibrated M-15 ( 28 days compressive strength not less than 10 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-- 50:30:20, FA : 0.40% by wt of cement) CA 0.80 cum, Blending Ratio of CA:65,35, FA 0.45 Cum)
22.14
6124
135585.36
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA-- 50:30:20, FA : 0.40 cum)
44.82
5437
243686.34
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Excavation for Structures- Mechanical Means ( Data adopted from MORTH) Earth work in excavation in all kinds of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. ( depth upto 3 meters)
74.7
120
8978.94
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading in layer of specified thickness, breaking clods, sectioning, etc., complete with initial lead upto 1km and all lifts.
1531.12
133
204098.3
Energency Reapirs to Thunaga Kunta, Garimillapally (V), Tekumatla (M), Jayashankar BHupalpally distr;Clearing thick jungle growth (less than 50 percent open space) including bushes upto 30 cm/ parthenium and other weeds including burning or disposing off the same as directed etc., complete.
2400
3
7920
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements