Indian Institute Of Technology Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Indian Institute Of Technology - IIT Tender
Civil And Construction
Building Construction
Eprocure
Opening Date29 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 38,67,087
Costs
EMD
₹ 77,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Campus Development Works Constn Of Fire Escape Stiarcase At Tip Bldg At Iit Hyderabad
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IITH_837274_1Bid Award Id
ViewTender No
IITH/CMD/CIV/2024-25/NIT-36Tender Authority
Indian Institute Of Technology ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
By Mechanical Transport including loading,unloading and stacking
-
-
-
... More
Earth
-
-
-
... More
Up to 2 Km
74
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift
63
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
-
-
-
... More
1 :4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
2
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for
-
-
-
... More
Foundations, footings, bases of columns, etc. for mass concrete
18
-
-
... More
Columns, Pillars, Piers, Abutments, Posts and Struts
26
-
-
... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate I retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
-
-
-
... More
All works upto plinth level
-
-
-
... More
Concrete of M25 grade with minimum cement content of 330 kg /cum
9
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.
990
-
-
... More
Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
6
-
-
... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete
3292
-
-
... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
-
-
-
... More
Hot finished welded type tubes
14477
-
-
... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
-
-
-
... More
Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
427
-
-
... More
Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in
-
-
-
... More
Channels, angles, tees and flats
450
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements