Hyderabad Road Development Corporation Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
281111Bid Award Id
ViewTender No
11/CE/SE/DEE/HRDCL/2021-22, Dt-02-12-2021Tender Authority
Hyderabad Road Development Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
construction of Compound wall;Providing flush pointing to RR Masonry in CM(1:3) with 12 mm thick including cost and conveyance of all materials in site, curing, labour charges etc., and overheads & contractors profit, complete for finished item of work etc complete as per the technical specifications and as directed by the Engineer-In-Charge.
5400
-
621000
... More
construction of Compound wall;Construction of compound wall with Random Rubble Masonry with Cement Mortar 1:3 in median etc., complete as per drawings, technical specifications followed by the 5th revision of MORTH and as per the directions of Engineer-In-Charge.
1215
-
6211080
... More
construction of Compound wall;Providing and fixing 1.8 meters high GI barbed wire fencing with 1.8 m angle iron posts 40 mm x 40 mm x6 mm placed evry 3 meters center to center founded in M15 grade cement concrete 0.6 metre below ground level, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with 9 horizontal lines and 2 diagonals interwoven with horizontal wires, fixed with GI staples, turn buckets etc complete as per clause 808 of MORTH 5th Revision.
1000
-
546000
... More
construction of Compound wall;Excavation for roadway in hard rock (Blasting Prohibited) with rock breakers including breaking rock, loading in tippers and disposal with all leads & lifts up to 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cros sections) etc complete and as per the directions of Engineer-In-Charge.
215.63
-
210239.25
... More
construction of Compound wall;Disposal of excavated earth (Unserviceable) to a lead of 15 km including labour charges for loading and unloading transportation etc., complete etc followed by environmental compliences and as per the directions of Enigineer-In-Charge. (Considered 50% excavated matrial for disposal).
1768.75
-
405043.75
... More
construction of Compound wall;Excavation in soil using Hydraulic Excavator CK 90 and Tippers with disposal including all leads & lifts (Excavation for roawork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections ) etc complete as per the directions of Engineer-in- Charge.
1221.88
-
155178.76
... More
construction of Compound wall;Dismantling of Cement Concrete of Grade M-15/M-20 (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all leads & lifts up to 1000 meters etc complete as per MORTH 5th Revison & as per the directions of Engineer In-Charge.
1050
-
865200
... More
construction of Compound wall;Providing and placing plain cement concrete for base course over foundation top with grade M10 with crushed stone aggregate of 20 mm nominal size, minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation, loading & unloading, stacking charges, curing, dewatering including pumping etc., complete including all leads & lifts and as per drawings, technical specifications and the direction of Engieer-In-Charge.
37.5
-
155362.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements