Hyderabad Road Development Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Road Development Corporation Limited - HRDCL Tender

Civil And Construction
Road Construction
Opening Date16 May 2023
Closing Date31 May 2023
Tender Amount₹ 14,64,37,614 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹44,500/MT*
Telangana

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Missing link road Cr 150;Providing,Supplying and installation of Hazard Marker using M.S. angle of size 55x55x6mm and 120cmhigh above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand,colour,with 30cm x 90cm Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium skin on both sideswith standard supports consisting of alternately black and Yellow with black stripes in screen printing sloping downward at an angle of 45 degrees towards the side of the obstruction onwhich the traffic is to pass and buried into the ground in a trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all materials, equipment, machinery and labour with all leads and lifts, loading and un-loading charges necessary for successfull completion of the work on any road in division as directed by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805 and approved drawings etc., complete for finished item of work.

8

4624

36992

... More
Construction of Missing link road Cr 150;Providing and fixing Mandatory/Informatory board size 600x800 mm made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of Green Colour & White Letters and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer ?in-Charge.

6

6416

38496

... More
Construction of Missing link road Cr 150;Providing and fixing Mandatory / Regulatory sign boards size 600 mm circle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

6

4735

28410

... More
Construction of Missing link road Cr 150;Providing and fixing Mandatory / Regulatory sign boards size 600 mm equilateral Triangle made out of Type ?XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material ( ACM ) sheet having minimum 0.30 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials,equipment, machinery and labour with all leads and lift, loading changes necessary forsatisfactory completion of the work as directed by Engineer -in-Charge.

6

3651

21906

... More
Construction of Missing link road Cr 150;Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of syntheticenamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmlyfixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading chages necessary for satisfactory completion of the work asdirected by Engineer -in-Charge.

6

5307

31842

... More
Construction of Missing link road Cr 150;Road Markers/Road Studs:Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(Hi-impact Polystyrene) and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 ? DO III Dt 11.06. 1997. The height and width shall not exceed 20 mm and 130 mm with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer?s recommendation and complete as directed by the engineer.

240

290

69600

... More
Construction of Missing link road Cr 150;Painting of kerb with two coats of water proof cement paint in all shades on new plastered concrete surfaces as per 803 of MoRT&H (5th revision) etc complete and as per the directions of Engineer-in-Charge.

1854.16

115

213228

... More
Construction of Missing link road Cr 150;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Concrete and bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORT&H Section 803.4 and IRC: 35, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35 and MORT&H Section 803.4

1276.07

582

742671

... More
Construction of Missing link road Cr 150;Providing and laying of precast concrete blocks for paving of M35 grade and thickness not less than 60 mm conforming to IS:15658 in all shapes and designs as approved by the Engineer-in-charge in footpath and Light traffic areas, including transportation, loading & unloading, laying to desired lines and levels etc. complete as per drawings, specifications and as directed by Engineer-In-Charge.

51.12

761

38902

... More
Construction of Missing link road Cr 150;Providing & Filling stone dust in races for utilities in the footpath including waterng and compacting as per Drawings & Technical Specifications & as directed by Engineer-In-Charge

12.27

1564

19188

... More
Construction of Missing link road Cr 150;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 25 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 as per morth 5th revision & as directed by Engineer-In-Charge

72

356

25632

... More
Construction of Missing link road Cr 150;Supplying and fixing of HDPE Pipe OD 160 mm with and without bend for Underground Electrical lines as per the specifications and directions of Engineer-In-Charge.

108

610

65880

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete for median with grade M15 with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

36

5095

183420

... More
Construction of Missing link road Cr 150;Painting two coats with water proof cement paint in all shades on new plastered concrete surfaces as per 803 of MoRT&H (5th revision) and as per the directions of Engineer-in-Charge.

165

115

18975

... More
Construction of Missing link road Cr 150;Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation. etc complete as per the directions of Engineer-In-Charge

42

13295

558390

... More
Construction of Missing link road Cr 150;Providing and laying boulders for flexible apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.

77.96

1810

141112

... More
Construction of Missing link road Cr 150;Providing and laying of rubble stones embeding in M15 concrete with required packing of stones with 1:3 cement mortar for Rigid apron as bed protection against scour etc.,complete as per drawing &Technical specifications and as directed by the Engineer-In-Charge.

62.37

4606

287276

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete in curtain wall with grade M15 with crushed stone aggregate of 20 mm nominal size, minimum cement content 260 kg/cum, max free water cement ratio 0.45, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation, loading & unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

37.86

5095

192878

... More
Construction of Missing link road Cr 150;Providing and laying of Reinforced cement concrete M-30 for approach slab including including production from concrete batching plant, vibrating, compacting & finishing, including reinforcement,formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts as per drawings, technical specifications and as per the direction of Engineer-In-Charge.

44.1

9866

435091

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete in approach slab with grade M15 with crushed stone aggregate of 20 mm nominal size, minimum cement content 220 kg/cum, maximum free water cement ratio 0.6, including production from concrete batching plant, vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts as per drawings, technical specifications and as per the direction of Engineer-In-Charge.

22.99

5095

117160

... More
Construction of Missing link road Cr 150;Providing & fixing Drainage Spouts with 100 mm dia. G.I. pipe as per MORT&H standard drawing no SD/103, Technical specifications and as directed by Engineer-In-Charge.

8

1933

15464

... More
Construction of Missing link road Cr 150;Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawings,technical specifications & as per the directions of Engineer-In-Charge.

21

11931

250551

... More
Construction of Missing link road Cr 150;Providing weep holes in masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specifications

109

245

26705

... More
Construction of Missing link road Cr 150;Providing and laying of Filter media with stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.

92.1

1941

178764

... More
Construction of Missing link road Cr 150;Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification & as per the MORT&H 5th Revison and as per the directions of Engineer-In-Charge.

276.33

1061

293191

... More
Construction of Missing link road Cr 150;Providing Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M40 grade concrete with minimum cement content 360 kg/cum with free water cement ratio 0.40,Thermo mechanically treated (TMT) HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified as per morth 5th revision & as directed by Engineer-In-Charge

36

3813

137268

... More
Construction of Missing link road Cr 150;Supplying, cutting, bending, fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in Super-Structure , including removal of rust, annealed binding wire of 16 guage etc. complete as per Drawing and Technical Specifications revision & as directed by Engineer-In-Charge

16.88

82159

1387173

... More
Construction of Missing link road Cr 150;Providing and laying Reinforced Cement Concrete of grade M40 in super-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

211.05

7094

1497189

... More
Construction of Missing link road Cr 150;Supplying, cutting, bending, fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in Sub-Structure , including removal of rust, annealed binding wire of 16 guage etc. complete as per Drawing and Technical Specifications revision & as directed by Engineer-In-Charge

12.73

79692

1014607

... More
Construction of Missing link road Cr 150;Providing and laying Reinforced Cement Concrete of grade M 35 in sub-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

159.14

6538

1040490

... More
Construction of Missing link road Cr 150;Providing and placing Reinforced Cement Concrete of grade M 35 in foundations with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

301.87

5907

1783158

... More
Construction of Missing link road Cr 150;Supplying,cutting,bending ,fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in foundation , including removal of rust,annealed binding wire of 16 guage etc. complete as per Drawings, Technical Specifications as per MORT&H 5th revision & as directed by Engineer-In-Charge

24.15

79331

1915825

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete with grade M15 with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

59.18

5095

301512

... More
Construction of Missing link road Cr 150;Construction of granular sub-base below the leveling course with crushed stone as sub base material of Grading V as per Table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORT&H 5th revision & as directed by Engineer-In-Charge.

49.73

2016

100252

... More
Construction of Missing link road Cr 150;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) c)Hard Rock

53.65

1191

63903

... More
Construction of Missing link road Cr 150;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) b)Ordinary Rock

160.96

134

21569

... More
Construction of Missing link road Cr 150;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) a)Earthwork in marshy soil

858.47

345

296174

... More
Construction of Missing link road Cr 150;Supplying and fixing of HDPE Pipe OD 160 mm with and without bend for Underground Electrical lines as per the specifications and directions of Engineer-In-Charge.

76.8

610

46848

... More
Construction of Missing link road Cr 150;Providing and laying of precast concrete blocks for paving of M35 grade and thickness not less than 60 mm for footpath and Light traffic areas conforming to IS:15658 in all shapes and designs as per the manufacturer's specification, transportation, loading & unloading, laying to desired lines and levels etc. complete as per specifications and as directed by Engineer-In-Charge.Fine aggregate bedding below the paver blocks will be measured and paid seperately.

48.1

761

36601

... More
Construction of Missing link road Cr 150;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 325 mm high in M20 grade PCC on M10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawing & technical specifications. M20 grade concrete shall be with minimum cement content @ 260 kg/cum & maximum water-cement ratio of 0.45, M10 grade concrete shall be with minimum cement content @ 220 kg/Cum & maximum water-cement raio of 0.60.

57.6

380

21888

... More
Construction of Missing link road Cr 150;Providing & Filling of stone dust in races for utilities in the footpath at Box culvert including compaction with plate compactor as per Drawings & Technical Specifications & as directed by Engineer-In-Charge

11.54

1564

18053

... More
Construction of Missing link road Cr 150;Providing Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M40 grade concrete with minimum cement content 360 kg/cum with free water cement ratio 0.40,Thermo mechanically treated (TMT) HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified as per morth 5th revision & as directed by Engineer-In-Charge

19.2

3813

73210

... More
Construction of Missing link road Cr 150;Providing and laying boulders apron on river/ Nallah bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification&as per the directions of Engineer-In-Charge.

50.62

1810

91631

... More
Construction of Missing link road Cr 150;Providing and laying of rubble stones embeding in M15 concrete with required packing of stones with 1:3 cement mortar for Rigid apron as bed protection against scour etc.,complete as per drawing &Technical specifications and as directed by the Engineer-In-Charge.

26.81

4606

123498

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete in curtain wall with grade M15 with crushed stone aggregate of 20 mm nominal size, minimum cement content 260 kg/cum, max free water cement ratio 0.45, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation, loading & unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

25.2

5095

128394

... More
Construction of Missing link road Cr 150;Reinforced cement concrete approach slab including M30 Concrete & reinforcement and formwork complete as per drawing and Technical specification as per morth 5th revision & as directed by Engineer-In-Charge.

50.4

9866

497246

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete in approach slab with grade M15 with crushed stone aggregate of 20 mm nominal size, minimum cement content 220 kg/cum, maximum free water cement ratio 0.6, including production from concrete batching plant, vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts as per drawings, technical specifications and as per the direction of Engineer-In-Charge.

25.2

5095

128394

... More
Construction of Missing link road Cr 150;Providing & fixing Drainage Spouts with 100 mm dia. G.I. pipe as per MORT&H standard drawing no SD/103, Technical specifications and as directed by Engineer-In-Charge.

4

1933

7732

... More
Construction of Missing link road Cr 150;Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawings,technical specifications & as per the directions of Engineer-In-Charge.

4.68

11931

55837

... More
Construction of Missing link road Cr 150;Providing weep holes in masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specifications

76

245

18620

... More
Construction of Missing link road Cr 150;Providing and laying of Filter media with stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.

57.6

1941

111802

... More
Construction of Missing link road Cr 150;Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification & as per the MORT&H 5th Revison and as per the directions of Engineer-In-Charge.

131.62

1061

139651

... More
Construction of Missing link road Cr 150;Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications as per morth 5th revision & as directed by Engineer-In-Charge

48

339

16272

... More
Construction of Missing link road Cr 150;Supplying, cutting, bending, fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in Super-Structure , including removal of rust, annealed binding wire of 16 guage etc. complete as per Drawing and Technical Specifications revision & as directed by Engineer-In-Charge

2.5

82159

205069

... More
Construction of Missing link road Cr 150;Providing and laying Reinforced Cement Concrete of grade M30 in super-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

31.2

6794

211973

... More
Construction of Missing link road Cr 150;Supplying, cutting, bending, fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in Sub-Structure , including removal of rust, annealed binding wire of 16 guage etc. complete as per Drawing and Technical Specifications revision & as directed by Engineer-In-Charge

6.03

79692

480649

... More
Construction of Missing link road Cr 150;Providing and laying Reinforced Cement Concrete of grade M 30 in Box Culvert sub-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

37.99

6209

235890

... More
Construction of Missing link road Cr 150;Providing and laying Reinforced Cement Concrete of grade M 25 in wing wall sub-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

37.99

6186

235016

... More
Construction of Missing link road Cr 150;Supplying,cutting,bending ,fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in foundation , including removal of rust,annealed binding wire of 16 guage etc. complete as per Drawings, Technical Specifications as per MORT&H 5th revision & as directed by Engineer-In-Charge

7.98

79331

632767

... More
Construction of Missing link road Cr 150;Providing and placing Reinforced Cement Concrete of grade M 25 in wing Wall foundations with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

64.28

5835

375072

... More
Construction of Missing link road Cr 150;Providing and placing Reinforced Cement Concrete of grade M 30 in Box Culvert foundations with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

35.42

5842

206947

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete in culvert with grade M15 with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

44.13

5095

224852

... More
Construction of Missing link road Cr 150;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) c)Hard Rock

34.67

1191

41287

... More
Construction of Missing link road Cr 150;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) b)Ordinary Rock

34.67

134

4645

... More
Construction of Missing link road Cr 150;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)a)Earthwork in All types of soil

277.33

103

28565

... More
Construction of Missing link road Cr 150;Providing and fixing of Precast Saucer drain blocks of 600x300x75 mm of M 15 grade at Main carriageway edge for surface runnoff discharge to Pipe drain and jointing blocks with 1:3 cement mortar including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

3594

548

1969512

... More
Construction of Missing link road Cr 150;Providing and Fixing of 100 mm diameter PVC pipe below footpath for carriageway surface run-off as per the drawings and specifications etc complete and as per the directions of Engineer-In-Charge.

648

195

126360

... More
Construction of Missing link road Cr 150;Construction of cement concrete EDGE kerb with top and bottom width 115 and 165 mm respectively, 425 mm high in M20 grade PCC on M10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawing & technical specifications. M20 grade concrete shall be with minimum cement content @ 260 kg/cum & maximum water-cement ratio of 0.45, M10 grade concrete shall be with minimum cement content @ 220 kg/Cum & maximum water-cement raio of 0.60.

2156

450

970200

... More
Construction of Missing link road Cr 150;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 425 mm high in M20 grade PCC on M10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawing & technical specifications. M20 grade concrete shall be with minimum cement content @ 260 kg/cum & maximum water-cement ratio of 0.45, M10 grade concrete shall be with minimum cement content @ 220 kg/Cum & maximum water-cement raio of 0.60 etc complete as per the technical specifications and as directed by the Engineer-In-Charge.

2156

450

970200

... More
Construction of Missing link road Cr 150;Providing and laying of precast concrete blocks for paving of M35 grade and thickness not less than 60 mm for footpath and Light traffic areas conforming to IS 15658 in all shapes and designs as per the manufacturer's specification , loading & unloading, laying to desired lines and levels complete etc. as per the standard specifications and as directed by Engineer-In-Charge.

4312

761

3281432

... More
Construction of Missing link road Cr 150;Filling with Stone dust below paver blocks for Footpath with Plate Compactor as per Drawing & Technical Specification as per morth 5th revision & as directed by Engineer-In-Charge

129.36

1564

202319

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete in bedding for foundation with grade M10 with crushed stone aggregate of 20 mm size, minimum cement content 220 kg/cum, max free water cement ratio 0.45, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation, loading & unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

323.4

4559

1474381

... More
Construction of Missing link road Cr 150;Construction of granular sub-base with crushed stone as sub base material of Grading V as per Table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORT&H 5th revision & as directed by Engineer-In-Charge.

933.55

2016

1882037

... More
Construction of Missing link road Cr 150;Filling with Stone dust below GSB for Footpath with Plate Compactor as per Drawing & Technical Specification as per morth 5th revision & as directed by Engineer-In-Charge

700.16

1564

1095050

... More
Construction of Missing link road Cr 150;Providing and placing plain cement concrete with grade M15 for Utility Chambers for Utility Cross ducts with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

4.32

5095

22010

... More
Construction of Missing link road Cr 150;Providing and laying of a reinforced cement concrete pipe duct, NP4 600 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 and approved drawings. -Double ROW for two utility Service

70

10230

716100

... More
Construction of Missing link road Cr 150;Providing and laying of a reinforced cement concrete pipe duct, NP4 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 and approved drawings.-Single ROW for One Utility Service

70

2275

159250

... More
Construction of Missing link road Cr 150;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 425 mm high in M20 grade PCC on M10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawing & technical specifications. M20 grade concrete shall be with minimum cement content @ 260 kg/cum & maximum water-cement ratio of 0.45, M10 grade concrete shall be with minimum cment content @ 220 kg/Cum & maximum water-cement raio of 0.60.

6468

450

2910600

... More
Construction of Missing link road Cr 150;Providing thick compacted Bituminous Concrete with 10-120 TPH Batch type hot mix plant using HBG/HBT crushed aggregates of Grading ? 2 as per table 500-18 of specification 509 of MoRT&H (5th revision), premixed with CRMB 55 Grade Bitumen@ 5.4% to 5.6% of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 509 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge (Payment will be made based on levels for finished item of work)

468.93

11363

5328452

... More
Construction of Missing link road Cr 150;Providing and applying tack coat with bitumen emulsion RS Grade using Bitumen pressure distributor at the rate of 0.26 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

31262

12

375144

... More
Construction of Missing link road Cr 150;Providing and laying of Dense Graded Bituminous Macadam with with 100-120 TPH Batch Mix plant using HBG crushed aggregates of Grading-2 as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic sensor paver for full width to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H specification No. 505 (5th Revision)

781.55

9973

7794398

... More
Construction of Missing link road Cr 150;Providing and applying Prime Coat with bitumen emulsion (slow Setting) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

15631

42

656502

... More
Construction of Missing link road Cr 150;Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of Median and Island above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 407) etc complete as per technical specifications of MORT&H 5th Revison followed by the directions of Engineer-In-Charge.

477

342

163134

... More
Construction of Missing link road Cr 150;Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) etc complete and as per MORTH 5th Revison & as per the directions of Engineer-In-Charge.

4263.49

2299

9801764

... More
Construction of Missing link road Cr 150;Construction of granular sub-base with crushed stone as sub base material of Grading V as per Table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORT&H 5th revision & as directed by Engineer-In-Charge.

5264.95

2016

10614143

... More
Construction of Missing link road Cr 150;Carting and Disposal of excavated/unservceable material/earth to a lead of 15 km including labour charges for loading and unloading, transportation etc., complete etc overheads for finished item of work complete as per directions of Engineer-In-Charge.

42671.9

241

10283928

... More
Construction of Missing link road Cr 150;Construction of Sub grade with material obtained from Borrow Area with CBR>=10%, PI<12% & MDD> 18KN/Cum pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment willo be based on level for finished item of work) (With Extra Lead 15 Km)

14240.38

617

8786314

... More
Construction of Missing link road Cr 150;Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per MORT&H 5th revision & as directed by Engineer-In-Charge.( With 15.0 Km Lead)

3477.1

542

1884588

... More
Construction of Missing link road Cr 150;Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) as per MORT&H 5th revision & as directed by Engineer-In-Charge.

3477.1

171

594584

... More
Construction of Missing link road Cr 150;Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with all leads & lifts up to 1000m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) etc complete and as per the directions of Engineer-In-Charge.

50263.29

1033

51921979

... More
Construction of Missing link road Cr 150;Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with disposal upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) etc complete and as per the directions of Engineer -In-Charge.

3590.24

172

617520

... More
Construction of Missing link road Cr 150;Excavation for roadwork in soils up to SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., complete including (excluding seigniorage) charges for finished item of work for trench cutting with all leads & lifts up to 1000 m etc complete as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge.

17951.18

134

2405457

... More
Construction of Missing link road Cr 150;Dismantling of Cement Concrete of Grade M-15/M-20 (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all leads & lifts up to 1000 meters etc complete as per MORTH 5th Revison & as per the directions of Engineer In-Charge.

743.75

887

659706

... More
Construction of Missing link road Cr 150;Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all leads&lifts up to 1000m and earth filling in the depression/pit.) etc complete as per technical specifications of MORTH 5th revison followed by the directions of Engineer-In-Charge. Girth from 900 mm to 1800 mm

4

1957

7828

... More
Construction of Missing link road Cr 150;Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all leads&lifts up to 1000m and earth filling in the depression/pit.) etc complete as per technical specifications of MORTH 5th revison followed by the directions of Engineer-In-Charge. Girth from 600 mm to 900 mm

18

954

17172

... More
Construction of Missing link road Cr 150;Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all leads&lifts up to 1000m and earth filling in the depression/pit.) etc complete as per technical specifications of MORTH 5th revison followed by the directions of Engineer-In-Charge. Girth from 300 mm to 600 mm

85

572

48620

... More
Construction of Missing link road Cr 150;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness complete by mechanical means as per Technical Specification Clause 201 MORTH 5th Revision etc complete and as per the directions of Engineer-In-Charge.

3.23

39239

126899



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.