Hyderabad Road Development Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Road Development Corporation Limited - HRDCL Tender

Opening Date7 Oct 2021
Closing Date21 Oct 2021
Tender Amount₹ 9,41,50,178 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Vaccum drying of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length, vaccume pump to maintain vaccume pressure 0.7-0.8, atmospheres as per the standard procedure, floating with power floater, mechanical trawelling, finishing with sound edges and corners, including hire and operational charges of machinery, labour, fuel etc, complete for finished item of work as directed by Engineering-in-charge of the work (as per Quotation)

3555.5

-

266663

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing & fixing of Mild steel dowel bar 32 mm dia of grade S 240& tie rod of 12 mm dia deformed steel rods including material,labour,required resource etc complete as per the drawings and technical specifications etc complete as per the 5th Revison of MORT&H and as directed by the Engineer-In-Charge.

5.09

-

364676

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Supply and placing of Ready Mix Concrete M 40 as per IS- 4926:2003 of following grades with minimum cement concrete as per IS- 456:2000 and Standard as per IS - 10262: 1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc, works for basic cost including levelling, grading, spreading, curing for 14 days centering, vibrating, compacting,finishing etc. as required including material taxes, pumping, transportation, approved admixture etc, complete (RMC-M40 for VDCC Road)

888.88

-

5898575

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete for base course for Junctions area with grade M10 with crushed stone aggregate of 40 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

533.33

-

2273564

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of Earthen Shoulder with Sub grade material area obtained from Borrow Area with CBR>=10%, removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment willo be based on level for finished item of work) (With Extra Lead 15 Km)

267.89

-

154575

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing thick compacted Bituminous Concrete with 100-120 TPH Batch type hot mix plant using HBG/HBT crushed aggregates of Grading ? 2 as per table 500-18 of specification 509 of MoRT&H (5th revision), premixed with VG30 Grade Bitumen@ 5.4% to 5.6% of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 509 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge (Payment will be made based on levels for finished item of work)

69.3

-

614275

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and applying tack coat with bitumen emulsion RS Grade using Bitumen pressure distributor at the rate of 0.25 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

4620

-

50820

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying of Dense Graded Bituminous Macadam with with 100-120 TPH Batch Mix plant using HBG crushed aggregates of Grading-2 as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic sensor paver for full width to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H specification No. 505 (5th Revision)

115.5

-

879764

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and applying Prime Coat with bitumen emulsion (slow Setting) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

2310

-

90090

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) etc complete and as per MORTH 5th Revison & as per the directions of Engineer-In-Charge.

603.9

-

1193910

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of granular sub-base with crushed stone as sub base material of Grading V as per Table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORT&H 5th revision & as directed by Engineer-In-Charge.

1135.25

-

1944675

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of Sub grade with material obtained from Borrow Area with CBR>=10%, removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment willo be based on level for finished item of work) (With Extra Lead 15 Km)

917.4

-

529340

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel100 mm thick as per Standard specification andincluding cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc.,complete for finished item of work as per Standardspecification.

70

-

622440

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing & fixing junction boards of size 1500 x 1050 mm made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro Retro reflective sheeting Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of Green Colour & White Letters and fixed over 4MM Alluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted ona MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

15

-

401355

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing fixing of Median Marker made of polycarbonate/ABS for impact resistance and good weatherability. Polycarbonate/ABS used for molding the Median Marker shall have a minimum Izod impact strength value of 600 J/m at room temperature. The impact strength of the polycarbonate/ABS should not decrease to less than 70 % of its initial value on being subjected to UV weathering as per ASTM G 155 for 1000 hours or exposure to 2 years of natural weathering. The body of the median marker shall be in the form of an isosceles trapezoidal / Circular structure of length 15 cm, height and width of 10x10 cm. The Median Marker shall have fluorescent yellow retro-reflective sheeting conforming to type XI specifications as per ASTM D4956 & IRC 67-2012. Area of reflective sheeting should not be less than 70 cm2. Edge of retro-reflective sheeting shall be concealed using a grill/ mesh/ similar mechanism to prevent vandalism and sheeting pilferage. The logo of the manufacturer shall be embossed and printed in contrasting color on both sides of median marker for distinct identification (even from moving vehicles).

469

-

263578

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing,Supplying and installation of Hazard Marker using M.S. angle of size 55x55x6mm and 120cmhigh above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand,colour,with 30cm x 90cm Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting of Yellow colour and confirming to IRC 67:2012 fixed over 3MM Alluminium Composite Material having minimum 0.30 mm thick Aluminium skin on both sideswith standard supports consisting of alternately black and Yellow with black stripes in screen printing sloping downward at an angle of 45 degrees towards the side of the obstruction onwhich the traffic is to pass and buried into the ground in a trench of size 30cm x 30cm and 50cm depth filled with CC M-20 including cost and conveyance of all materials, equipment, machinery and labour with all leads and lifts, loading and un-loading charges necessary for successfull completion of the work on any road in division as directed by Engineer-in-Charge and conforming to IRC 67-2012 &MORT&H specification No.805 and approved drawings etc., complete for finished item of work.

14

-

63700

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and fixing Mandatory / Regulatory sign boards size 900 mm circle made out of Type ?XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all roundand fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground levelto the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

15

-

156870

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and fixing Mandatory/Informatory board size 600x800 mm made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of Green Colour & White Letters and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer ?in-Charge.

15

-

126900

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and fixing Mandatory / Regulatory sign boards size 600 mm circle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading charges necessary for satisfactory completion of the work as directed by Engineer -in-Charge.

15

-

90600

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and fixing Mandatory / Regulatory sign boards size 600 mm equilateral Triangle made out of Type ?XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 3MM Alluminium Composite Material ( ACM ) sheet having minimum 0.30 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and and mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground level the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly fixed with MS base angle 35x35x4 mm in to the ground by M15 Concrete foundation of size 450x450x600mm including cost and conveyance of all materials,equipment, machinery and labour with all leads and lift, loading changes necessary forsatisfactory completion of the work as directed by Engineer -in-Charge.

15

-

69855

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made out of Type ? XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to IRC 67 for full background of White colour and letters/logos done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over 4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on both sides with back side painted grey colour and fixed over back support frame of M.S angle25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2 coats of syntheticenamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmlyfixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with all leads and lift, loading chages necessary for satisfactory completion of the work asdirected by Engineer -in-Charge.

15

-

107610

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Road Markers/Road Studs:Supplying & Fixing of Molded Shanks Raised Pavement Markers made of plastic body moulded from HIPS(Hi-impact Polystyrene) and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 13635 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 ? DO III Dt 11.06. 1997. The height and width shall not exceed 20 mm and 130 mm with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgs. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer?s recommendation and complete as directed by the engineer.

476

-

171836

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing & fixing of R.C.C Boundary pillar of M15 grade as per the approved drawings including excavtion,concrete,reinforcement,fabrication,fixing in position,painting & required lettering etc complete as per the MORT&H 5th Revison and as directed by the Engineer-In-Charge

168

-

125664

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Painting of kerb with two coats of water proof cement paint in all shades on new plastered concrete surfaces as per 803 of MoRT&H (5th revision) etc complete and as per the directions of Engineer-in-Charge.

2617.64

-

306264

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Supplying of hot applied thermoplastic road marking compound, 2.5mm thick including reflectorising glass beads @ 250gms with Reflectorising Glass Beads on Concrete and bituminous Surface at 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass bead as per MORT&H Section 803.4 and IRC: 35, the material should satisfy the requirements as per MORTH specifications 803.4 and must comply with the following: a) White index for the product should be in the range of 60-70 when measured against standard reference. The applied panel 7/8 number must be submitted for checking up the white index in the department lab. In case the department approves the white index of any vendor, the department engineer may carryout random checking of the applied products at site against the approved panel. In case of any major deviation, beyond acceptance limit, department reserve the right to cancel or reject the total supplied consignment of the said material and will compell the vendor has to replace the full consignment by the desired material as per approved panel at his own cost and additional demurrages may be claimed due to loss of man days (as per the rules of the department). b) Luminance factor of the material should be in the range of 80-85% at 45 degree centigrade as per AASTHOM 249. c) Crack resistance: The applied panel cured for 7 days under ambient condition and then should be tested as per BS3262, Part-1, 1989 and should pass at the range of '0' degree centigrade to '-10' degree centigrade D) Adhesion : Strong E) Softening point: 102 degree centigrade F) Dried film finish : Smooth and uniform G) Night Vision: High as directed by the Engineer-in-Charge and confirming to IS: 164-1961 (1st revision reaffirmed in 1986) and clause conforming to IRC 35 and MORT&H Section 803.4

2259.69

-

1498172

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete with grade M15 for Utility Chambers for Utility Cross ducts with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.(Sub Structure)

34.38

-

171006

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying of a reinforced cement concrete pipe duct, NP4 600 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 and approved drawings. -Double ROW for two utility Service

360

-

3484440

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying of a reinforced cement concrete pipe duct, NP4 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 and approved drawings.-Single ROW for One Utility Service

570

-

1243170

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing,Laying&fixing of Reinforced Cement Concrete 1200mm dia Pipe NP4 concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP4 concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . ) etc complete and as per the requirements and directions of Engineer-In-Charge.

45

-

838755

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete with grade M15 for Encasing NP4 pipes with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.(Sub Structure)

106.75

-

530975

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete with grade M15 for levelling course with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

15.63

-

77744

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dewatering including pumping,dressing of sides and bottom and backfilling with approved material.) -In Ordinary soil by Mechanical means

156.29

-

15160

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Supplying and fixing of HDPE Pipe OD 160 mm with and without bend for Underground Electrical lines as per the specifications and directions of Engineer-In-Charge.

76.8

-

43699

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying of precast concrete blocks for paving of M35 grade and thickness not less than 60 mm for footpath and Light traffic areas conforming to IS:15658 in all shapes and designs as per the manufacturer's specification, transportation, loading & unloading, laying to desired lines and levels etc. complete as per specifications and as directed by Engineer-In-Charge.Fine aggregate bedding below the paver blocks will be measured and paid seperately.

48.1

-

34677

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 325 mm high in M20 grade PCC on M10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawing & technical specifications. M20 grade concrete shall be with minimum cement content @ 260 kg/cum & maximum water-cement ratio of 0.45, M10 grade concrete shall be with minimum cement content @ 220 kg/Cum & maximum water-cement raio of 0.60.

57.6

-

21830

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing & Filling fine aggregate in races for utilities in the footpath at Box culvert including compaction with plate compactor as per Drawings & Technical Specifications & as directed by Engineer-In-Charge

11.54

-

15941

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M40 grade concrete with minimum cement content 360 kg/cum with free water cement ratio 0.40,Thermo mechanically treated (TMT) HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified as per morth 5th revision & as directed by Engineer-In-Charge

19.2

-

68237

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying boulders apron on river/ Nallah bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification&as per the directions of Engineer-In-Charge.

68.62

-

109937

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying of rubble stones embeding in M15 concrete with required packing of stones with 1:3 cement mortar for Rigid apron as bed protection against scour etc.,complete as per drawing &Technical specifications and as directed by the Engineer-In-Charge.

40.05

-

244946

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete in curtain wall with grade M15 with crushed stone aggregate of 20 mm nominal size, minimum cement content 260 kg/cum, max free water cement ratio 0.45, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation, loading & unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

36.2

-

180056

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Reinforced cement concrete approach slab including M30 Concrete & reinforcement and formwork complete as per drawing and Technical specification as per morth 5th revision & as directed by Engineer-In-Charge.

42.74

-

389700

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete in approach slab with grade M15 with crushed stone aggregate of 20 mm nominal size, minimum cement content 220 kg/cum, maximum free water cement ratio 0.6, including production from concrete batching plant, vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts as per drawings, technical specifications and as per the direction of Engineer-In-Charge.

21.37

-

102201

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing & fixing Drainage Spouts with 100 mm dia. G.I pipe as per MORT&H standard drawing no SD/103, Technical specifications and as directed by Engineer-In-Charge.

4

-

5964

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawings,technical specifications & as per the directions of Engineer-In-Charge.

3.97

-

43714

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing weep holes in masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical specifications

68

-

14756

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying of Filter media with stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.

48.84

-

79072

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification & as per the MORT&H 5th Revison and as per the directions of Engineer-In-Charge.

111.6

-

111270

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans not exceeding 10 m to cater for a horizontal movement upto 20 mm, covered with sealant complete as per drawing and technical specifications as per morth 5th revision & as directed by Engineer-In-Charge

40.7

-

12739

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Supplying, cutting, bending, fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in Super-Structure , including removal of rust, annealed binding wire of 16 guage etc. complete as per Drawing and Technical Specifications revision & as directed by Engineer-In-Charge

1.98

-

149174

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying Reinforced Cement Concrete of grade M30 in super-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 340 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

24.74

-

156204

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Supplying, cutting, bending, fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in Sub-Structure , including removal of rust, annealed binding wire of 16 guage etc. complete as per Drawing and Technical Specifications revision & as directed by Engineer-In-Charge

5.59

-

408616

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying Reinforced Cement Concrete of grade M 30 in Box Culvert sub-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 360 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

31.86

-

183816

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying Reinforced Cement Concrete of grade M 25 in wing wall sub-structure with crushed stone aggregate of 20 mm nominal size, minimum cement content 320 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

37.99

-

213893

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Supplying,cutting,bending ,fitting and placing un-coated, Thermo mechanically treated (TMT) HYSD bar of grade Fe-500 conforming to IS:1786 (from primary producers like TATA, SAIL, VSP, JSW & SHYAM STEEL or Equivalent) Reinforcement in foundation , including removal of rust,annealed binding wire of 16 guage etc. complete as per Drawings, Technical Specifications as per MORT&H 5th revision & as directed by Engineer-In-Charge

7.58

-

551473

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing Reinforced Cement Concrete of grade M 25 in wing Wall foundations with crushed stone aggregate of 20 mm nominal size, minimum cement content 320 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

64.28

-

341325

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing Reinforced Cement Concrete of grade M 30 in Box Culvert foundations with crushed stone aggregate of 20 mm nominal size, minimum cement content 340 kg/cum, maximum free water cement ratio 0.45, including production from concrete batching plant , vibrating, compacting & finishing, including formwork, cost of all materials, labour, hire charges of machinery, loading & unloading, stacking charges, curing etc. complete including all leads & lifts, and as per Drawings, Technical Specifications, dewatering including pumping and as per the direction of Engineer-In-Charge.

30.43

-

165209

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete in culvert with grade M15 with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

48.77

-

242582

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) c)Hard Rock

57.88

-

64244

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) b)Ordinary Rock

57.88

-

7408

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) -a)Earthwork in All types of soil

463.02

-

44913

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 425 mm high in M20 grade PCC on M10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per drawing & technical specifications. M20 grade concrete shall be with minimum cement content @ 260 kg/cum & maximum water-cement ratio of 0.45, M10 grade concrete shall be with minnimum cment content @ 220 kg/Cum & maximum water-cement raio of 0.60.

1132

-

508268

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing thick compacted Bituminous Concrete with 100-120 TPH Batch type hot mix plant using HBG/HBT crushed aggregates of Grading ? 2 as per table 500-18 of specification 509 of MoRT&H (5th revision), premixed with VG30 Grade Bitumen@ 5.4% to 5.6% of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 509 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge (Payment will be made based on levels for finished item of work)

918.28

-

8139678

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and applying tack coat with bitumen emulsion RS Grade using Bitumen pressure distributor at the rate of 0.25 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

61219

-

673409

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and laying of Dense Graded Bituminous Macadam with with 100-120 TPH Batch Mix plant using HBG crushed aggregates of Grading-2 as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic sensor paver for full width to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary including cost of (excluding seigniorage) charges of all materials etc., complete and as per MoRT&H specification No. 505 (5th Revision)

1530.47

-

11657628

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and applying Prime Coat with bitumen emulsion (slow Setting) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

30609.5

-

1193771

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of Median and Island with Soil Taken from Roadway Cutting (Construction of Median and Island above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures, spread, graded and compacted as per clause 407) etc complete as per technical specifications of MORT&H 5th Revison followed by the directions of Engineer-In-Charge.

147.96

-

47198

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Providing and placing plain cement concrete for central median divider with grade M15 with crushed stone aggregate of 20 mm nominal size,minimum cement content 220 kg/cum, max free water cement ratio 0.60, including production from concrete batching plant, vibrating, compacting including formwork, cost of all materials, labour, hire charges of machinery, transportation,loading &unloading, stacking charges, curing, dewatering including pumping etc. complete including all leads & lifts and as per drawings, technical specifications and the direction of Engineer-In-Charge.

214.37

-

1066270

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) etc complete and as per MORTH 5th Revison & as per the directions of Engineer-In-Charge.

7821.26

-

15462621

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of granular sub-base with crushed stone as sub base material of Grading V as per Table 400-1, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 of MORT&H 5th revision & as directed by Engineer-In-Charge.

8431.92

-

14443882

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of Earthen Shoulder with Sub grade material area obtained from Borrow Area with CBR>=10%, removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment willo be based on level for finished item of work) (With Extra Lead 15 Km)

3246.3

-

1873113

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Carting and Disposal of excavated/unservceable material/earth to a lead of 15 km including labour charges for loading and unloading, transportation etc., complete etc overheads for finished item of work complete as per directions of Engineer-In-Charge.

13990.49

-

3203821

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of unlined surface drains of average cross sectional area 0.5 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres) etc complte as per the technical specifications of MORTH 5th Revison followed by the directions of Engineer-In-Charge.

2111

-

213211

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of Sub grade with material obtained from Borrow Area with CBR>=10%, removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment willo be based on level for finished item of work) (With Extra Lead 15 Km)

4719.74

-

2723290

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of Sub grade with material obtained from roadway cutting with CBR>=10% , pre-watering of soil , removal of top soil, excavation of soils , depositing the soils on the embankment, spreading soil, breaking clods, sectioning , grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (payment will be based on level for finished item of work)

524.42

-

89675

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Loosening of existing subgrade,watering, grading & compaction in layers to meet the requirements of table no 300-2 for sub grade construction in layers as per specifications etc complete as per the 5th Revison of MORT&H and as per the directions of Engineer-in-Charge etc.

3795.75

-

421328

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 as per MORT&H 5th revision & as directed by Engineer-In-Charge.( With 15.0 Km Lead)

1171.8

-

614023

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2) as per MORT&H 5th revision & as directed by Engineer-In-Charge.

456.1

-

72064

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres as per morth 5th revision & as directed by Engineer-In-Charge

2793

-

27930

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with disposal upto 1000 metres. (Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.) etc complete and as per the directions of Engineer -In-Charge.

647.4

-

105526

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Excavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucket capacity including cutting and loading in tippers and disposal with in all lifts and lead upto 1000 metres, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections. etc complete as per the drawings and technical specifcations of 5th Revison of MORT&H and as directed by the Engineer-In-Charge.

1575

-

223650

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Excavation for roadwork in soils up to SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines , grades and cross sections etc., complete including (excluding seigniorage) charges for finished item of work for trench cutting with all leads & lifts up to 1000 m etc complete as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge.

12300.6

-

1562176

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Dismantling of Cement Concrete of Grade M-15/M-20 (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all leads & lifts up to 1000 meters etc complete as per MORTH 5th Revison & as per the directions of Engineer In-Charge.

682

-

561968

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all leads&lifts up to 1000m and earth filling in the depression/pit.) etc complete as per technical specifications of MORTH 5th revison followed by the directions of Engineer-In-Charge. Above 1800 mm

2

-

7132

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all leads&lifts up to 1000m and earth filling in the depression/pit.) etc complete as per technical specifications of MORTH 5th revison followed by the directions of Engineer-In-Charge. Girth from 900 mm to 1800 mm

6

-

11016

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all leads&lifts up to 1000m and earth filling in the depression/pit.) etc complete as per technical specifications of MORTH 5th revison followed by the directions of Engineer-In-Charge. Girth from 600 mm to 900 mm

50

-

44650

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all leads&lifts up to 1000m and earth filling in the depression/pit.) etc complete as per technical specifications of MORTH 5th revison followed by the directions of Engineer-In-Charge. Girth from 300 mm to 600 mm

350

-

187950

... More
CONSTRUCTION OF MISSING LINK PART OF 14 AND 18;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness complete by mechanical means as per Technical Specification Clause 201 MORTH 5th Revision etc complete and as per the directions of Engineer-In-Charge.

5.07

-

189342



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.