Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Pipe Line Project
Water Storage And Supply
Opening Date4 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 2,08,616 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of 100mm dia DI K7 water supply pipe line;Making dummy arrangements to 100mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.

1

4041

4041

... More
Laying of 100mm dia DI K7 water supply pipe line;Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.

1

6680

6680

... More
Laying of 100mm dia DI K7 water supply pipe line;Jointing 100mm dia D.I. / C.I pipes,specials and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

1

148

148.7

... More
Laying of 100mm dia DI K7 water supply pipe line;Labour charges for lowering and keeping in position 100mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

1

229

229.2

... More
Laying of 100mm dia DI K7 water supply pipe line;Jointing 150mm dia Pipes and Collars with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

200

400

... More
Laying of 100mm dia DI K7 water supply pipe line;Jointing 100mm dia Pipes and Collars with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

43

163

7030.5

... More
Laying of 100mm dia DI K7 water supply pipe line;Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

248

497.2

... More
Laying of 100mm dia DI K7 water supply pipe line;Cutting of 100mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

3

132

397.8

... More
Laying of 100mm dia DI K7 water supply pipe line;Lowering the 100mm dia DI(K7) pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

213

58

12396.6

... More
Laying of 100mm dia DI K7 water supply pipe line;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers

167.74

450

75516.55

... More
Laying of 100mm dia DI K7 water supply pipe line;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

426

217

92612.4

... More
Laying of 100mm dia DI K7 water supply pipe line;Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

3.27

1504

4918.73

... More
Laying of 100mm dia DI K7 water supply pipe line;Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.

0.42

1412

593.38



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.