Hyderabad Metropolitan Water Supply And Sewerage Board Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
520745Bid Award Id
ViewTender No
21/CGM(E)/O&MC.I/D3/2024-25, Dt.07.06.2024 (Reserved for SC) (1st Recall)Tender Authority
Hyderabad Metropolitan Water Supply And Sewerage Board ViewPurchaser Address
-Website
http://https://www.hyderabadwater.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying and Jointing of 100mm dia water supply line;Barricading, Boarding lighting and watching etc., for water supply and sewerage works trenches of depth upto 6'0"(2 meters) below G.L. using casurina ballies 125mm dia 2.5 meters long placed at 5ft c/c complete including all incidental and operation charges as directed by dept Officers.
100
217
21740
Laying and Jointing of 100mm dia water supply line;Cutting of 150mm dia D.I. / C.I pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
248
497.2
Laying and Jointing of 100mm dia water supply line;Lowering the 100mm dia D.I. / C.I (K7) S/S pipes and specials carefully into the ready made trenches and laying them true to alignment and gradient including all labour charges, all operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
100
58
5820
Laying and Jointing of 100mm dia water supply line;Supply and delivery of cement of good quality including all labour charges, all operational charges etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
6.8
6
40.8
Laying and Jointing of 100mm dia water supply line;Jointing 150mm dia D.I. / C.I pipes and specials with S/S ends excluding the cost of joining materials such as lead or lead wool and hump yarn but including sundries such as cost of fuel for melting lead, filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
324
648.4
Laying and Jointing of 100mm dia water supply line;Jointing 100mm dia D.I. / C.I pipes with plain spigot and modified socket rubber gasket (tyton) joints including all sundries but excluding cost of rubber gaskets etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
24
163
3924
Laying and Jointing of 100mm dia water supply line;Labour charges for lowering and keeping in position 100mm dia D.I / C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
3
229
687.6
Laying and Jointing of 100mm dia water supply line;Labour charges for lowering and keeping in position 150mm dia D.I / C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
1
388
388.5
Laying and Jointing of 100mm dia water supply line;Jointing 100mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
6
307
1846.2
Laying and Jointing of 100mm dia water supply line;Jointing 150mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
2
455
910.6
Laying and Jointing of 100mm dia water supply line;Drilling and tapping 15mm dia PPC connection in CI/DI main and fixing of brass screw including cost and conveyance of all materials including all other incidental and operation charges etc., complete as directed by the HMWS&SB Engineer.
30
118
3549
Laying and Jointing of 100mm dia water supply line;Supply and delivery fixing of RCC Precast manhole chambers having the size of 36"x21" dia at top fixing in CC 1:4:8 Prop:along with FRC Cover and frame laying CC 1:2:4 prop: including cost of materials labour charges earth work curing conveyance etc., Complete as directed by the HMWS&SB Engineers
4
6696
26784
Laying and Jointing of 100mm dia water supply line;Redoing of 100mm domestic sewer line connection including EWE in all available soils and including supply delivery of following dia SWG pipes and including lowering laying and jointing in CM(1:5:1) prop. Etc., complete upto 3' depth abd refilling with water and tampering etc.,Complete as directed by the HMWS&SB Engineers.
36
273
9849.6
Laying and Jointing of 100mm dia water supply line;Redoing 15mm dia domestic water supply connection including eath work excavation cost of pipes with (MDPE) refilling etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
60
237
14238
Laying and Jointing of 100mm dia water supply line;Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
17.05
182
3104.29
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements