Hyderabad Metropolitan Water Supply And Sewerage Board Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Pipe Line Project
Opening Date7 Jun 2024
Closing Date10 Jun 2024
Tender Amount₹ 2,29,752 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of 150mm dia water supply;Bailing out water from the pipe line trenches with oil engine driven pump sets,5HP/HR including hire charges, fuel charges and wages for driver and helper etc., complete as directed by the HMWS&SB Engineers.

3

392

1178.7

... More
Laying of 150mm dia water supply;Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.

2.64

5772

15240.64

... More
Laying of 150mm dia water supply;Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.

7.66

182

1394.66

... More
Laying of 150mm dia water supply;Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.

2

6680

13360

... More
Laying of 150mm dia water supply;Collection, Supply and filling ( quarry dust)with HBG stone chips 2.36mm and below in trenches of foundations and basement and the pipe line trenches with initial lead in layers not exceeding 15 cm thick consolidating each deposited layer watering consoliditing each layer watering and ramming including cost of collection of sand and other requied materials conveyance of water to worksite and all operational incidental, labouer charges hire charges of T and P complete for finished item work ect., complete as directed by the H.M.W.S.&.S. Board Engineers.

12.37

614

7597.65

... More
Laying of 150mm dia water supply;Jointing 100mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

307

615.4

... More
Laying of 150mm dia water supply;Jointing 150mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

455

910.6

... More
Laying of 150mm dia water supply;Labour charges for lowering and keeping in position 100mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

1

229

229.2

... More
Laying of 150mm dia water supply;Labour charges for lowering and keeping in position 150mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

1

388

388.5

... More
Laying of 150mm dia water supply;Jointing of 150mm dia CI/DI pipes and Specials with rubber gaskets excluding the cos of rubber gasket but including all sundries filling with a water lead upto 500M and testing to required pressure etc complete as directed by the HMWS&SB Engineers.

30

200

6000

... More
Laying of 150mm dia water supply;Lowering the 150mm dia DI(K7) pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

165

94

15642

... More
Laying of 150mm dia water supply;Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

248

497.2

... More
Laying of 150mm dia water supply;Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel, stacking, leveling, watering, tamping rolling, all leads, labour charges and other incidental and operational charges as directed by the H.M.W.S.&.S. Board Engineers.

4.36

678

2960.27

... More
Laying of 150mm dia water supply;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

165

217

35871

... More
Laying of 150mm dia water supply;Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.

3.77

1504

5670.83

... More
Laying of 150mm dia water supply;Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.

4.36

3818

16646.48

... More
Laying of 150mm dia water supply;Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.

140.84

450

63406.17

... More
Laying of 150mm dia water supply;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.

3.3

2940

9702



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.