Hyderabad Metropolitan Water Supply And Sewerage Board Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Water Supply And Sewerage Board - HMWSSB Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date14 Feb 2025
Closing Date20 Feb 2025
Tender Amount₹ 26,32,497 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Annual Maintenance of Water Supply System;Engaging of Labour for Clearing light jungle and bushes grown in the premises of reservoir premises duly cutting and stacking with an initial lead and lift and disposal duly burning including the labour charges and the tools and tackles along with all other incidental and operational charges etc., complete as directed by the HMWSSB Engineers. Skilled

4

945

3780

... More
Annual Maintenance of Water Supply System;Transportation of FRC frames and covers form departmental store to work site using tractor

6.4

3720

23808

... More
Annual Maintenance of Water Supply System;Fixing of FRC Frames and Covers including conveyance of material, benching with CC and Labour charges

65

317

20665.45

... More
Annual Maintenance of Water Supply System;Carting surplus excavated Earth/ rock from the site to a distance of about10/ 8/5 kms including loading, unloading, conveyance and dumping,labour charges, all leads and lifts,all other incidental and operational charges etc complete.

58.66

186

10965.9

... More
Annual Maintenance of Water Supply System;CC road restoration M -30 (1:0.75:1.50) Grade mix with 6mm to 20mm guage hard granite machine crushed metal including cost and conveyance of all material site, machine mixing of concrete, lifts, leads, from work laying in position, vibrating, compacting, curing, all labour charges, tools and plaints and all other incidental and operational charges etc. complete .

112.75

7798

879227.88

... More
Annual Maintenance of Water Supply System;Providing, Laying, spreading and compacting graded stone aggregrate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug mill) carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN / Vibratory Roller 80-100KN weight to achieve the desired density including lighting, barricading and maintenance of diversion etc.,as per Tables 400.11 & 400.12 and Technical specification clause 406 MORD/MORTH

52.3

1978

103454.63

... More
Annual Maintenance of Water Supply System;Supply, delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36mm) where ever required as directed by departmental officers including cost and conveyance

52.3

644

33712.58

... More
Annual Maintenance of Water Supply System;Making 150 mm dia dummy arrangement to following dia on main DI and CI including cost of CI socket tail piece with MS dummy plate and of pig lead spun yarn and cost of jointing material and all labour charges etc. complete

10

6082

60828.3

... More
Annual Maintenance of Water Supply System;Making 100 mm dia dummy arrangement to following dia on main DI and CI including cost of CI socket tail piece with MS dummy plate and of pig lead spun yarn and cost of jointing material and all labour charges etc. complete

15

3585

53780.4

... More
Annual Maintenance of Water Supply System;Supply and Delivery of Gland Rope for attending S/V Leakages

24

250

6000

... More
Annual Maintenance of Water Supply System;Lowering 150mm dia DI Pipes and fittings with S/s ends carefully into the trenches and laying them true to alignment and gradient all sundries but excluding conveyance from source of supply

33

105

3474.9

... More
Annual Maintenance of Water Supply System;Lowering 100mm dia DI Pipes and fittings with S/s ends carefully into the trenches and laying them true to alignment and gradient all sundries but excluding conveyance from source of supply

44

64

2842.4

... More
Annual Maintenance of Water Supply System;Supply and Delivery of DI Specials including cost of material etc., complete MJ Collar to suit 300mm dia

2

8253

16506

... More
Annual Maintenance of Water Supply System;Supply and Delivery of DI Specials including cost of material etc., complete MJ Collar to suit 200mm dia

4

4716

18864

... More
Annual Maintenance of Water Supply System;Supply and Delivery of DI Specials including cost of material etc., complete MJ Collar to suit 150mm dia

6

3668

22008

... More
Annual Maintenance of Water Supply System;Supply and Delivery of DI Specials including cost of material etc., complete MJ Collar to suit 100mm dia

10

2358

23580

... More
Annual Maintenance of Water Supply System;Drilling and tapping on CI/DI pipes and fixing of brass screw etc., complete as directed by the deptl. Officers. 20mm dia

5

152

761.5

... More
Annual Maintenance of Water Supply System;Drilling and tapping on CI/DI pipes and fixing of brass screw etc., complete as directed by the deptl. Officers. 15mm dia

6

132

792

... More
Annual Maintenance of Water Supply System;Redoing domestic 150 mm dia sewer line connection including EWE in all available soils and including supply delivery of 100/150 mm dia SWG pipes and including lowering laying and jointing in CM (1.5:1) prop. etc. complete upto 3' depth and refilling watering and tampering. complete as directed by the deptl. Officers.

10

398

3980

... More
Annual Maintenance of Water Supply System;Redoing domestic 100 mm dia sewer line connection including EWE in all available soils and including supply delivery of 100/150 mm dia SWG pipes and including lowering laying and jointing in CM (1.5:1) prop. etc. complete upto 3' depth and refilling watering and tampering. complete as directed by the deptl. Officers.

18

298

5364

... More
Annual Maintenance of Water Supply System;Redoing of 20 mm dia PPC connections for domestic water supply connection including earth work excavation, cost of MDPE pipes, refilling etc. complete as directed by the deptl. Officers.

24

266

6384

... More
Annual Maintenance of Water Supply System;Redoing of 15 mm dia PPC connections for domestic water supply connection including earth work excavation, cost of MDPE pipes, refilling etc. complete as directed by the deptl. Officers.

48

254

12211.2

... More
Annual Maintenance of Water Supply System;Supply and delivery of RCC precast manhole chambers having the size of 36" at bottom tapering to 21" dia at top fixing in CC 1:4:8 prop; along with FRC cover and frame laying CC 1:2:4 prop; including cost of materials, labour charges earth work curing conveyance etc complete.

11

6752

74276.4

... More
Annual Maintenance of Water Supply System;Removing & raising of r.c.c precast of manhole chamber water supply manhole with laying of cc prop 1:4:8 and 1:2:4 for benching including cost of material, labour charges excluding cost of rcc pre cast chamber and rcc frame & cover

12

6131

73579.2

... More
Annual Maintenance of Water Supply System;Supply, delivery and fixing of 300 mm dia spindle rods with check nut to suit the sluice valve including cost of all materials casting, turning, threading and including deduction of the weight of old spindle rod etc. complete. as directed by the departmental officers

6

4910

29462.4

... More
Annual Maintenance of Water Supply System;Supply, delivery and fixing of 250 mm dia spindle rods with check nut to suit the sluice valve including cost of all materials casting, turning, threading and including deduction of the weight of old spindle rod etc. complete. as directed by the departmental officers

3

4092

12276

... More
Annual Maintenance of Water Supply System;Supply, delivery and fixing of 200 mm dia spindle rods with check nut to suit the sluice valve including cost of all materials casting, turning, threading and including deduction of the weight of old spindle rod etc. complete. as directed by the departmental officers

15

3273

49104

... More
Annual Maintenance of Water Supply System;Supply, delivery and fixing of 150 mm dia spindle rods with check nut to suit the sluice valve including cost of all materials casting, turning, threading and including deduction of the weight of old spindle rod etc. complete. as directed by the departmental officers

20

2455

49104

... More
Annual Maintenance of Water Supply System;Supply, delivery and fixing of 100 mm dia spindle rods with check nut to suit the sluice valve including cost of all materials casting, turning, threading and including deduction of the weight of old spindle rod etc. complete. as directed by the departmental officers

28

1636

45830.4

... More
Annual Maintenance of Water Supply System;Jointing the 200 mm dia CI / D/F pipes, fittings and valves with flanged ends INCLUDING the cost of jointing material such as bolt, nuts, rubber insertion, white lead and including filling with a water lead upto 500 M and testing to required pressure etc., complete.

1

539

539.7

... More
Annual Maintenance of Water Supply System;Jointing the 150 mm dia CI / D/F pipes, fittings and valves with flanged ends INCLUDING the cost of jointing material such as bolt, nuts, rubber insertion, white lead and including filling with a water lead upto 500 M and testing to required pressure etc., complete.

1

493

493.3

... More
Annual Maintenance of Water Supply System;Jointing the 100 mm dia CI / D/F pipes, fittings and valves with flanged ends INCLUDING the cost of jointing material such as bolt, nuts, rubber insertion, white lead and including filling with a water lead upto 500 M and testing to required pressure etc., complete.

2

334

668.6

... More
Annual Maintenance of Water Supply System;Jointing of 300mm dia CI/DI pipes and fittings with Rubber Gaskets (Excluding the cost of Rubber Gasket)

4

306

1226

... More
Annual Maintenance of Water Supply System;Jointing of 200mm dia CI/DI pipes and fittings with Rubber Gaskets (Excluding the cost of Rubber Gasket)

4

237

950.4

... More
Annual Maintenance of Water Supply System;Jointing of 150mm dia CI/DI pipes and fittings with Rubber Gaskets (Excluding the cost of Rubber Gasket)

12

217

2607.6

... More
Annual Maintenance of Water Supply System;Jointing of 100mm dia CI/DI pipes and fittings with Rubber Gaskets (Excluding the cost of Rubber Gasket)

16

178

2854.4

... More
Annual Maintenance of Water Supply System;Manufacture supply delivery and MS pipes/ Speacials fabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office 300 mm dia 8 mm thick

2

5153

10306.62

... More
Annual Maintenance of Water Supply System;Manufacture supply delivery and MS pipes/ Specials fabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office. For 200 mm dia 8 mm thick

2

3514

7029.12

... More
Annual Maintenance of Water Supply System;Manufacture supply delivery and MS pipes/ Specials fabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office. For 150 mm dia 8 mm thick

4

2617

10471.2

... More
Annual Maintenance of Water Supply System;Manufacture supply delivery and MS pipes/ Specials fabricated with 10/8 mm thick/MS plate including cost and conveyance of all material and labour charges etc? as directed by the HMWSSB office. For 100 mm dia 6 mm thick

8

1290

10325.36

... More
Annual Maintenance of Water Supply System;Jointing 300 mm dia C.I Pipes and specials S/S ends LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete.

15

493

7401

... More
Annual Maintenance of Water Supply System;Jointing 250 mm dia C.I Pipes and specials S/S ends LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete.

50

433

21670

... More
Annual Maintenance of Water Supply System;Jointing 200 mm dia C.I Pipes and specials S/S ends LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete.

75

385

28912.5

... More
Annual Maintenance of Water Supply System;Jointing 150 mm dia C.I Pipes and specials S/S ends LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete.

100

349

34970

... More
Annual Maintenance of Water Supply System;Jointing 100 mm dia C.I Pipes and specials S/S ends LA class including all sundries but excluding jointing materials such as pig lead and spun yarn etc complete.

110

280

30844

... More
Annual Maintenance of Water Supply System;Supply and delivery of Cement including cost and conveyance etc complete.

2196.3

5

10981.5

... More
Annual Maintenance of Water Supply System;Supply and delivery of Spun Yarn including cost and conveyance etc complere.

145.05

130

18856.5

... More
Annual Maintenance of Water Supply System;Labour charges for lowering and keeping in position 300mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

1444

2888.6

... More
Annual Maintenance of Water Supply System;Labour charges for lowering and keeping in position 200mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

2

713

1427.6

... More
Annual Maintenance of Water Supply System;Labour charges for lowering and keeping in position 150mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

3

432

1298.1

... More
Annual Maintenance of Water Supply System;Labour charges for lowering and keeping in position 100mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

4

255

1021.2

... More
Annual Maintenance of Water Supply System;Dewatering pipeline trenches duly bailing out water with 5 hp engine driven pumps including hire charges fuel charges wages of driver and helper and all other incidental and operational charges including suction and delivery hoses lead of drain into natural drain etc. complete.

48

417

20016.96

... More
Annual Maintenance of Water Supply System;Cutting of 300 mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

25

552

13822.5

... More
Annual Maintenance of Water Supply System;Cutting of 250 mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

4

460

1842.8

... More
Annual Maintenance of Water Supply System;Cutting of 200 mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

35

368

12901

... More
Annual Maintenance of Water Supply System;Cutting of 150 mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

90

276

24876

... More
Annual Maintenance of Water Supply System;Cutting of 100 mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.

110

147

16214

... More
Annual Maintenance of Water Supply System;Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.

250

234

58675

... More
Annual Maintenance of Water Supply System;Shovel 0.85 cum 110 hp (JCB) Engaged Earth work excavation hard gravelly soils including all labour charges etc complete.

28

3557

99615.6

... More
Annual Maintenance of Water Supply System;Earthwork excavation and depositing on the bank in all types of soils like black cotton soil, red earth, and ordinary gravel, hard gravelly soils, mixture of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures , existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and including backfilling for pipeline trenches for laying Water supply/sewer lines including all incidental and operational charges etc., complete as directed by the HMWS&SB Engineers. (For pipeline trenches where depth is more than 1.5 times the width)..For pipe line trenches

576.35

497

286907.03

... More
Annual Maintenance of Water Supply System;Cutting open CC road surface including labour charges, all leads and other incidental and operational charges , tools and plants etc complete for pipeline trenches.

62.05

2939

182414.59

... More
Annual Maintenance of Water Supply System;Cutting of BT road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete. For Manholes.as directed by the department officers.

6.36

1412

8980.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.